Quartz School For Well Site Supervisors: 8. Sub Sea Well Head Installations

  • Uploaded by: ام فاطمة البطاط
  • 0
  • 0
  • January 2021
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Quartz School For Well Site Supervisors: 8. Sub Sea Well Head Installations as PDF for free.

More details

  • Words: 1,365
  • Pages: 22
Loading documents preview...
Quartz8. School for Well Supervisors Sub Sea Well HeadSite Installations Module – 12 Well Completions Schlumberger Private

Section – 8 Sub Sea Well Heads

Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations 1/22

8. Sub Sea Well Head Installations Contents y Offshore Operations Evolution y Why go Subsea? Schlumberger Private

y Subsea Development Options y Subsea System Overview y Technical Challenges y Schlumberger Subsea y SRC Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations 2/22

8. Sub Sea Well Head Installations Offshore Operations Evolution Offshore

Deepwater

Subsea

Schlumberger Private

Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations 3/22

8. Sub Sea Well Head Installations Deepwater Potential US Reserves Lower 48 Alaska

4.2

Billions of bbls

Alaska Peak

3.6

Horizontal Wells

3.0

Added 77-97 35.9 8.8 Schlumberger Private

Peak U.S. Production

1977 23.4 8.4 Modeled Deepwater Production Impact

2.4 Total U.S. Lower 48

1.8 1949

GOM: 20-46 Billion bbls Global: 200+ Billion bbls

1960

1980

2000

2020

Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations 4/22

8. Sub Sea Well Head Installations Subsea Market Total Worldwide Subsea Completions

Schlumberger Private

2000 1800 1600 1400 1200 1000 800 600 400 200 0 1960- 1965- 1970- 1975- 1980- 1985- 1990- 1995- 20001965 1970 1975 1980 1985 1990 1995 2000 2005

Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations 5/22

8. Sub Sea Well Head Installations Subsea Development Options

Schlumberger Private

Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations 6/22

8. Sub Sea Well Head Installations Deepwater Development Options

Schlumberger Private

Tension Leg Platform (TLP) Tanker FPSO

Semi submersible FPS Spar

Fixed Platform Subsea Tieback

Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations 7/22

8. Sub Sea Well Head Installations Deepwater Development Options Fixed Platforms

Current Depth

Tension Leg Platforms

Potential Depth Schlumberger Private

Tanker FPSO

Semisub FPS

SPAR

Subsea Tieback 0

3000

6000

9000

Water Depth ft Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations 8/22

8. Sub Sea Well Head Installations Subsea System Overview

Schlumberger Private

y Wells y Subsea Production trees y Tiebacks y Templates y Manifolds y Pipelines y Control Systems y Umbilical y Control Pods y Pumps y Separators Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations 9/22

8. Sub Sea Well Head Installations Sub Sea Tree Design Options Conventional (Concentric) Tree

Horizontal (Spool) Tree Schlumberger Private

Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations 10/22

8. Sub Sea Well Head Installations Conventional Trees y Tubing Hanger installed in the y

y Surface Flow Tree y Swivel y Coiled Tubing Lifting Frame

Schlumberger Private

y

Wellhead Flow Control valves in line with tubing Consist of three sub-systems 1. Surface Equipment

2. Riser System

y Dual bore risers and monobosre risers

3. Subsea Equipment

y Lower Riser Package y Emergency Disconnect Package

Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations 11/22

8. Sub Sea Well Head Installations Horizontal Trees y Tubing Hanger is landed in the

y

y y y

Schlumberger Private

y

tree Flow Control valves are outside of the tubing flow path Configuration allows for full bore access to tubing hanger y Well intervention without disturbing tree, flow line connections or umbilical Reduce cost and tree size Allows for 7” production tubing Higher production per tree

Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations 12/22

8. Sub Sea Well Head Installations Tiebacks y Simple wellhead / pipeline

Schlumberger Private

y

configurations are often not practical y Water depth y Environment Subsea Solution – Tiebacks y Multiple wellheads connected to a manifold by flowlines y Production connected to

y Floating Production y y

Systems Neighboring Platforms Onshore facilities

y Record distance 68 miles (GOM Mensa field) Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations 13/22

8. Sub Sea Well Head Installations Templates and Manifolds Templates y Provide support for manifolds

y Interface between the production

pipeline, flow line and the well. and wells Can be deployed in 2500 m water y Collect and distribute produced fluids from individual subsea wells depth

y Inject gas, inject chemicals and control y

fluids. Distribute the electrical and hydraulic systems.

Schlumberger Private

y

Manifolds

Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations 14/22

8. Sub Sea Well Head Installations Control Systems y Downhole valves, valves on tree, flow lines and manifolds are controlled hydraulically from surface

Control Modules (SCM) with Umbilical

y Dual redundant, electro-hydraulic

Schlumberger Private

y Topside controls linked to Subsea

computerized systems: y Control Valves y Monitor instruments y Send data (P, T, Flow Control and Sand detection) Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations 15/22

8. Sub Sea Well Head Installations Subsea Challenges y Zero tolerance for compromising y

y

Schlumberger Private

y

safety Complexity of Offshore environment y Well Accessibility y Weather, Currents Technology y Hydrates, Scales, Corrosion y Multi-zone production y Hostile, unconsolidated y Extended Reach operations Risks y Little previous experience y Financial Exposure

Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations 16/22

8. Sub Sea Well Head Installations Schlumberger Subsea y Johnston introduced Subsea Safety Trees to the industry in 1974. y The E-Z TREE allowed floating drilling vessel to quickly leave

y In Q3 1996, SBC (Subsea Business Center) was formed in

Schlumberger Private

location for the DST Exploration Market. y The latest product is now called SenTREE 3.

Aberdeen to Develop Subsea Well Control Systems for Development Wells and Intervention Market. y Responsible for Marketing and System Level Development.

y SRC (then SPT) was responsible for Development and Manufacturing of the critical Subsea Products. Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations 17/22

8. Sub Sea Well Head Installations Schlumberger Subsea • Core competency at the moment y Completion Installations y Exploration testing using the

y

Schlumberger Private

y

SenTree3 Well Control and Intervention using the SenTREE 7 systems Light Weight Intervention

y The Commander Telemetry presents opportunities for Subsea Power and Control Systems

y Schlumberger’s Subsea role is best described with the name: y Subsea Completion Management Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations 18/22

8. Sub Sea Well Head Installations Providing Access y Beyond 4000 ft, floating installations y

Schlumberger Private

y

are kept on station using DP technology Requires different techniques to provide access, well shut-in and emergency disconnects y Primary Subsea Safety System: y Isolates landing string from completion y Rapid Disconnect y Prevents Discharge y Allows Reconnection Two Systems y SenTree 3 y SenTREE 7 Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations

19/22

8. Sub Sea Well Head Installations SenTREE 7 primary functions Applications y Testing y Installing Completion y Well Intervention

y Shut-in the well with two y y y

Schlumberger Private

It is the primary subsea safety device and provides fast acting and reliable means to: barriers Prevent discharge of its contents into the riser Disconnect the landing string from the test string. Allows Chemicals to be pumped into the landing string.

Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations 20/22

8. Sub Sea Well Head Installations SenTREE 7 Operation

Operational Overview

Ball Valve

Schlumberger Private

Emergency Disconnect

Latch

Flapper Valve

Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations 21/22

8. Sub Sea Well Head Installations Subsea Technology at SRC y SenTREE 7 System

Schlumberger Private

y y

Engineering y Subsea Accumulator Module - SAM y Subsea Control Module SCM y Subsea Spanner Joint y Ball, Retainer and Flapper Valves y Deep Water Control System - DWCS Building of SenTREE 7 Systems Acceptance and System Integration Tests Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations

22/22

Related Documents