PENGADAAN PENERANGAN TENAGA SURYA /1 PAKET

RINCIAN HARGA DAN SPESIFIKASI PJUTS No

ITEM DAN SPESIFIKASI

QUANTITY

PRICE

TOTAL PRICE

Volume Satuan I SPESIFIKASI LAMPU Light Source: Working Temperature(℃): IP Rating: Certification: Place of Origin: Item name: Power: Voltage IP degree: Dimension: Net Weight: Material: Frequence: Color temperature (CCT): Item Type: Lamp Body Material: LED Light Source: Lamp Power(W): SPESIFIKASI BATTERY Usage: Sealed Type: Maintenance Type: Weight: Voltage: Size: Daya Color: Electrolyte: Terminal: SPESIFIKASI PANEL SURYA Max. Power (Pmax) Max. Power Voltage (Vmp) Max. Power Current (Imp) Open Circuit Voltage (Voc) Short Circuit Current (Isc) Nominal Operating Cell Temp Max. System Voltage Max. Series Fuse Weight Dimension

LED -55 IP65 CCC, CE, EMC, LVD, RoHS Shanghai, China 50w cobra head led street light IP65 50W 12 Volt 65 500x210x80mm 1.8kg Die-casting aluminum 50-60Hz warm white/white/cool white Street Lights Aluminum Epistar 50 UPS/Solar power/telcommunication/E-bike Sealed Free 10kg 12v 195*130*155*168mm 50 Amp Black Sulfuric Acid Thixotropic Copper Terminal

1

Set

Rp

5.183.000,00

50WP 16.5V 3.34A 21.1V 4.23A 45±2°C 1000V 16A 6.5Kg 775 x 680 x 28 mm Sub Jumlah I

Rp

5.183.000,00

Rp

5.183.000,00

II TIANG LAMPU a. Pipa Besi Ø 3" Tebal 2,2 mm b Besi Handdle dan Atribut

6



1

set

c

Besi Plat Strip L 4 mm (120 x240)

e

Cat Warna Putih (Dasar)

0,25

Kg

f

Cat Warna Hitam/ Alumunium

0,25

Kg Ls

h Pengelasan

1 1

i

1

Ls

Pekerja

1

titik

b Tukang

1

titik

1

g Box Battery Mobilisasi

buah

Ls

Rp Rp Rp Rp Rp Rp Rp Rp

70.000,00 200.000,00 33.500,00 70.000,00 70.000,00 250.000,00 213.000,00 100.000,00

Rp Rp Rp Rp Rp Rp Rp Rp Rp

420.000,00 200.000,00 33.500,00 17.500,00 17.500,00 250.000,00 213.000,00 100.000,00 1.251.500,00

Rp Rp Rp Rp Rp Rp Rp Rp Rp

35.000,00 30.000,00 72.500,00 150.000,00 7.000,00 4.000,00 135.000,00 10.000,00 112.000,00

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

35.000,00 30.000,00 36.250,00 14.250,00 196.000,00 6.400,00 20.580,00 40.000,00 112.000,00 490.480,00

Rp Rp

150.000,00 100.000,00

Rp Rp Rp

150.000,00 100.000,00 250.000,00

Total Sub Jumlah Rp

7.174.980,00

Rp

7.174.980,00

Sub Jumlah II III Pemasangan Cor + Bahan (Lump Sump) a c

0,50

Zak

d Pasir Beton/Pasang

Semen PC @ 50 Kg

0,10



e

Besi 10" KS

f

Besi 8" KS

28,00 m 1,60 m

g Kerikil

0,15



h Sekrup + Baut 19 inch

4,00

buah

i

1,00

set

Instalasi Lampu dan Handle

1,00

ls

b Instalasi Pemasangan Lapangan

1,00

ls

Mobilisasi Sub Jumlah II

IV Pemasangan Instalasi a

Sub Jumlah IV

Dari Dana GDM Sumber Dana

Dari Swadaya

A.4.1.1.5 Membuat 1 M3 Beton mutu f'c = 14,5 Mpa (K.175), Slump (12 ± 2) cm, w/c=0,66 No. Uraian Kode Satuan Koefisien Pekerja Tukang Batu Kepala Tukang Mandor

L.01 L.02 L.03 L.04

OH OH OH OH

Volume

1,650 0,275 0,028 0,083

Jumlah Volume 0,20 0,20 0,20 0,20

JUMLAH TENAGA KERJA B

Kg Kg Kg Liter btg btg

326,000 760,000 1029,000 215,000 2,000 2,000

0,20 0,20 0,20 0,20 0,20 0,20 JUMLAH BAHAN

PERALATAN

0,000

0,000 JUMLAH HARGA ALAT

D E F

0,41

BAHAN

Semen Portlant Pasir Beton Kerikil (Maks. 30 mm) Air Besi 10 KS Besi 9 KS C

0,33 0,06 0,01 0,02

Jumlah (A+B+C) Overhead & Profit (10%) Harga Satuan Pekerjaan (D+E)

10% x D

1,30 0,10 0,15 43,00 0,00 0,00 44,55

REKAPITULASI RENCANA ANGGARAN BIAYA ( RAB ) PROPINSI KABUPATEN KECAMATAN DUSUN

: : : :

JAMBI BUNGO JUJUHAN SIRIH SEKAPUR PENERANGAN : LAMPU JALAN : 1 SET

Kegiatan Ukuran No

I

2 LAMPU + PANEL + BATTERY 1 Set

II

:

Bobot

: :

1 Unit

%

Jumlah No. RAB Dana GDM

: :

%

Swadaya 3

4

Swadaya 5

Jumlah Total

% Dana GDM

6

Bobot

Swadaya 7

8

5.183.000,00

72,24

5.183.000,00

64,79

1.251.500,00

17,44

1.251.500,00

15,64

490.480,00

6,84

490.480,00

6,13

250.000,00

3,48

250.000,00

3,12

7.174.980,00

100,00

7.174.980,00

89,69

107.624,70

1,35

Pemasangan cor + Bahan a. Lumpsump

III

Ukuran

TIANG LAMPU a. Bahan

III

:

Uraian Jumlah No. RAB Dana GDM

1

Bobot

Kegiatan

Pemasangan Instalasi ( tidak perlu dirinci ) Jumlah PPH 1,5% PPN 10% JUMLAH TOTAL Dibulatkan

717.498,00

8,97

8.000.102,70

100,00

8.000.000,00