Loading documents preview...
PENGADAAN PENERANGAN TENAGA SURYA /1 PAKET
RINCIAN HARGA DAN SPESIFIKASI PJUTS No
ITEM DAN SPESIFIKASI
QUANTITY
PRICE
TOTAL PRICE
Volume Satuan I SPESIFIKASI LAMPU Light Source: Working Temperature(℃): IP Rating: Certification: Place of Origin: Item name: Power: Voltage IP degree: Dimension: Net Weight: Material: Frequence: Color temperature (CCT): Item Type: Lamp Body Material: LED Light Source: Lamp Power(W): SPESIFIKASI BATTERY Usage: Sealed Type: Maintenance Type: Weight: Voltage: Size: Daya Color: Electrolyte: Terminal: SPESIFIKASI PANEL SURYA Max. Power (Pmax) Max. Power Voltage (Vmp) Max. Power Current (Imp) Open Circuit Voltage (Voc) Short Circuit Current (Isc) Nominal Operating Cell Temp Max. System Voltage Max. Series Fuse Weight Dimension
LED -55 IP65 CCC, CE, EMC, LVD, RoHS Shanghai, China 50w cobra head led street light IP65 50W 12 Volt 65 500x210x80mm 1.8kg Die-casting aluminum 50-60Hz warm white/white/cool white Street Lights Aluminum Epistar 50 UPS/Solar power/telcommunication/E-bike Sealed Free 10kg 12v 195*130*155*168mm 50 Amp Black Sulfuric Acid Thixotropic Copper Terminal
1
Set
Rp
5.183.000,00
50WP 16.5V 3.34A 21.1V 4.23A 45±2°C 1000V 16A 6.5Kg 775 x 680 x 28 mm Sub Jumlah I
Rp
5.183.000,00
Rp
5.183.000,00
II TIANG LAMPU a. Pipa Besi Ø 3" Tebal 2,2 mm b Besi Handdle dan Atribut
6
M¹
1
set
c
Besi Plat Strip L 4 mm (120 x240)
e
Cat Warna Putih (Dasar)
0,25
Kg
f
Cat Warna Hitam/ Alumunium
0,25
Kg Ls
h Pengelasan
1 1
i
1
Ls
Pekerja
1
titik
b Tukang
1
titik
1
g Box Battery Mobilisasi
buah
Ls
Rp Rp Rp Rp Rp Rp Rp Rp
70.000,00 200.000,00 33.500,00 70.000,00 70.000,00 250.000,00 213.000,00 100.000,00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
420.000,00 200.000,00 33.500,00 17.500,00 17.500,00 250.000,00 213.000,00 100.000,00 1.251.500,00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
35.000,00 30.000,00 72.500,00 150.000,00 7.000,00 4.000,00 135.000,00 10.000,00 112.000,00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
35.000,00 30.000,00 36.250,00 14.250,00 196.000,00 6.400,00 20.580,00 40.000,00 112.000,00 490.480,00
Rp Rp
150.000,00 100.000,00
Rp Rp Rp
150.000,00 100.000,00 250.000,00
Total Sub Jumlah Rp
7.174.980,00
Rp
7.174.980,00
Sub Jumlah II III Pemasangan Cor + Bahan (Lump Sump) a c
0,50
Zak
d Pasir Beton/Pasang
Semen PC @ 50 Kg
0,10
M³
e
Besi 10" KS
f
Besi 8" KS
28,00 m 1,60 m
g Kerikil
0,15
M³
h Sekrup + Baut 19 inch
4,00
buah
i
1,00
set
Instalasi Lampu dan Handle
1,00
ls
b Instalasi Pemasangan Lapangan
1,00
ls
Mobilisasi Sub Jumlah II
IV Pemasangan Instalasi a
Sub Jumlah IV
Dari Dana GDM Sumber Dana
Dari Swadaya
A.4.1.1.5 Membuat 1 M3 Beton mutu f'c = 14,5 Mpa (K.175), Slump (12 ± 2) cm, w/c=0,66 No. Uraian Kode Satuan Koefisien Pekerja Tukang Batu Kepala Tukang Mandor
L.01 L.02 L.03 L.04
OH OH OH OH
Volume
1,650 0,275 0,028 0,083
Jumlah Volume 0,20 0,20 0,20 0,20
JUMLAH TENAGA KERJA B
Kg Kg Kg Liter btg btg
326,000 760,000 1029,000 215,000 2,000 2,000
0,20 0,20 0,20 0,20 0,20 0,20 JUMLAH BAHAN
PERALATAN
0,000
0,000 JUMLAH HARGA ALAT
D E F
0,41
BAHAN
Semen Portlant Pasir Beton Kerikil (Maks. 30 mm) Air Besi 10 KS Besi 9 KS C
0,33 0,06 0,01 0,02
Jumlah (A+B+C) Overhead & Profit (10%) Harga Satuan Pekerjaan (D+E)
10% x D
1,30 0,10 0,15 43,00 0,00 0,00 44,55
REKAPITULASI RENCANA ANGGARAN BIAYA ( RAB ) PROPINSI KABUPATEN KECAMATAN DUSUN
: : : :
JAMBI BUNGO JUJUHAN SIRIH SEKAPUR PENERANGAN : LAMPU JALAN : 1 SET
Kegiatan Ukuran No
I
2 LAMPU + PANEL + BATTERY 1 Set
II
:
Bobot
: :
1 Unit
%
Jumlah No. RAB Dana GDM
: :
%
Swadaya 3
4
Swadaya 5
Jumlah Total
% Dana GDM
6
Bobot
Swadaya 7
8
5.183.000,00
72,24
5.183.000,00
64,79
1.251.500,00
17,44
1.251.500,00
15,64
490.480,00
6,84
490.480,00
6,13
250.000,00
3,48
250.000,00
3,12
7.174.980,00
100,00
7.174.980,00
89,69
107.624,70
1,35
Pemasangan cor + Bahan a. Lumpsump
III
Ukuran
TIANG LAMPU a. Bahan
III
:
Uraian Jumlah No. RAB Dana GDM
1
Bobot
Kegiatan
Pemasangan Instalasi ( tidak perlu dirinci ) Jumlah PPH 1,5% PPN 10% JUMLAH TOTAL Dibulatkan
717.498,00
8,97
8.000.102,70
100,00
8.000.000,00