RISK ASSESSMENT FORM Conducted By (Date)
Company Task
Group 1 (13/09/06)
Renew Main Mast Equipment: a) Navigation Light
Approved By (Date)
Next Review Date
1. Hazard Identification
2. Risk Evaluation
3. Risk Control
Possible Accident/III Health & Persons-at-risk
Existing Risk Control
1
Inspect faulty navigation light
Falling from height
Fatal
-VSCC -Staging / Scaffold -Use body harness and anchor at hard point
5
1
2
Remove existing navigation light
-Live wire
Electric shock Electrocution Fatal
-Isolate power supply with lock out / tag out --VSCC
5
3
Bring down existing navigation light and bring up new light
Falling hazard
Bodily injury
-Qualified Signaler/Rigger -Valid inspection tag for lifting appliances -Barricade affected area
4
Install new navigation light
-Falling hazard -Slip, tripping hazard
-Bodily injury -Hand and finger injury
-Staging -PPE (Hand gloves, body harness)
Association of Singapore Marine Industries
Additional Risk Control Measure
Action Officer Follow-up Date)
M
Monitor workers to be equipped with proper PPE (body harness)
Supervisor & Safety
1
M
-Counter check by multi-meter
Supervisor & Safety
3
2
M
-Provide lifting containers / casing
Lifting Supervisor
3
2
M
-Use line yard for tools
Supervisor
Risk Level
Hazard
Likelihood
Task Step
Severity
No.
Reference Document for Reference
Page 1 of 2
1. Hazard Identification
2. Risk Evaluation Possible Accident/ Ill Health & Persons-at-risk
Existing Risk Control
5
Testing and Commissioning
Live wire
Electric shock Electrocution
-Permit to work system and -Authorized person to conduct test -VSCC meeting
Fatal
Association of Singapore Marine Industries
5
1
Risk Level
Hazard
Likelihood
Task Step
Severity
No.
3. Risk Control
M
Additional Risk Control Measure
Action Officer (Follow-up Date)
-Conduct toolbox meeting
Commissioning Engineer/
Reference Document for Reference
Supervisor
Page 2 of 2
RISK ASSESSMENT FORM Conducted By (Date)
Company
Group 2
Task
Load Test Generator with Load Bank
Approved By (Date)
13/09/2006
1. Hazard Identification
Next Review Date
Possible Accident/III Health & Persons-at-risk
Existing Risk Control
Severity
1
Work Area Assessment
Slip, Trip and Fall
-Slip & fall due to slippery surface or -Trip & fall due to wires and cables on floor -Minor injury
-Keep the area clear / dry -Use cable hanger to hang cable -Use of PPE
2
2
Transport of load bank / cables to work site using fork lift
-Moving vehicle
-Collision, topple of forklift -Fatality -Overload of forklift
-Ensure only trained & licensed forklift driver operates -Ensure the path of forklift is free from obstruction -Ensure not to overload -Secure the load
5
Laying of cable from load bank to switchboard using shore crane
-Hand / Finger injury -Falling object
-Cut injury while pulling cable (minor injury) -Cable falling while lifting (minor injury)
Isolation of power in switch board
Live voltage
-Electric Shock -Electrocution (fatal)
3
4
Association of Singapore Marine Industries
Reference
Risk Level
Hazard
3. Risk Control Likelihood
Task Step
-Falling object
12/09/2009
2. Risk Evaluation
No.
Arasu, Joleen, Yen, Sheng, Thein, Manir Ram, Aye Min, Kelvin and Ramkumar
Additional Risk Control Measure
Action Officer Follow-up Date)
Document for Reference
2
L
Nil
Supervisor
1
M
-Warning siren during operation -Nil
Supervisor
Operation of forklift or checklist
2
2
L
-Ensure using of hand gloves -Ensure area is barricaded -Ensure lifting belt is certified and fit for use -Ensure trained signalmen is present
2
2
L
Nil
Supervisor
Inspection record for lift gear
2
2
L
-Highlight in VSCC meeting -Ensure skilled electrician is used -Lock out / Tag out at main switch board
5
1
M
Supervisor
Page 1 of 2
1. Hazard Identification
2. Risk Evaluation
3. Risk Control
Task Step
Hazard
Possible Accident/ Ill Health & Persons-at-risk
Existing Risk Control
Severity
Likelihood
5
Termination of load bank cable in switch board
-Live voltage
-Electric shock -Electrocution (fatal) -Cut injury during connection (minor injury)
-Ensure that line test is carried out
5
1
-Ensure using of hand gloves
2
2
L
-Electric shock -Electrocution (fatal)
-Ensure the switchboard & load bank are properly barricade -Ensure that physical check on the cable
5
1
M
-Ensure load bank is shut off -Ensure generator is switched off & stopped -Ensure the main switch board is isolated
5
-Hand & finger injury
6
7
Load test of generator
Disconnect of cable & removal of load bank after testing
Live voltage
Live voltage
-Electric shock -Electrocution (fatal)
Association of Singapore Marine Industries
Risk Level
No.
Additional Risk Control Measure
Action Officer (Follow-up Date)
M
-Briefing by Supervisor -Ensure no presence of electricity
Supervisor
Operation of warning light
Supervisor
Reference Document for Reference
Use walkie-talkie to communicate 1
M
Ensure no presence of electricity
Supervisor
Use walkie-talkie to communicate
Page 2 of 2
Task
RISK ASSESSMENT FORM Conducted By (Date) ABC Group 3 Remove Alternator from Vessel and Overhaul in WS
Approved By (Date)
Machinery HOD 13/09/06
Company
1. Hazard Identification
Next Review Date
2. Risk Evaluation
13/09/09
3. Risk Control
Task Step
Hazard
Possible Accident/III Health & Persons-at-risk
Existing Risk Control
Severity
Likelihood
Risk Level
No.
Additional Risk Control Measure
Action Officer Follow-up Date)
1
Inspect alternator located in E/RM
- Unknown condition
-Lack of oxygen -Toxic fumes
5
1
-Trip, slip and fall
-Bodily injury or fatal
-Entry permit for confine space -Gas check -Forced ventilation &general lighting -Housekeeping -Adequate PPE
M
-Portable gas monitor per working group
Supervisor HSE Officer
5
1
M
2
Dismantle the alternator cable
Live power supply terminals
-Electric shock and electrocution -Bodily injury
-VSCC Meeting -Isolate the circuit breaker -Lock out & Tag Out -Use correct tool
5
1
M
-Check to ensure there is no presence of electricity
Supervisor
3
Remove of corroded mounting bolts
Fire and explosion
-Spark or molten generated from gas cutting, may cause flame -Bodily injury/ fatal
-Hot work permit -PPE -Fire watch
5
1
M
Brief worker before work commences
Supervisor
4
Lifting the alternator
Falling object
-Hit by falling object -Bodily injury / fatal
-Trained rigger / signalmen -Check SWL & condition of wire sling or lifting belt -Use bucket container to lift from onboard to shore
3
1
L
Association of Singapore Marine Industries
Supervisor
Reference Document for Reference
Inspection record for lifting gear
Page 1 of 2
1. Hazard Identification
2. Risk Evaluation
3. Risk Control
Hazard
Possible Accident/ Ill Health & Persons-at-risk
Existing Risk Control
Severity
5
Transportation of alternator from dock to workshop and vice versa
Moving vehicle
-Collision, topple, over capacity -Bodily injury/ fatal -Damage property
-Ensure proper lashing -Use low bed trailer for over site alternator -Keep road clear of obstruction
3
6
Dismantle / assemble of alternator
-Hand caught in between -Strike by tool -Strike by hose -Hit by parts
-Finger injury -Noise (NID) -Bodily injury
-PPE -Proper tools -Correct WPs -Avoid/minimize hand contact and over extension
2
7
Chemical cleaning
-Toxicity -Fluid spill
-Burn -Allergic
-Appropriate PPE -MSDS -Permit for cleaning
8
Baking
Burn
9
Testing
Caught by hot equipment Live power supply terminal
Train personnel using the hot / oven room -Trained personnel -Test protocol
Association of Singapore Marine Industries
Risk Level
Task Step
-Bodily injury -Electric shock & electrocution
Likelihood
No.
Additional Risk Control Measure
Reference
Action Officer (Follow-up Date)
Document for Reference
1
L
Supervisor
Ensure checklist for forklift
2
L
Supervisor
2
2
L
Supervisor
2
2
L
Supervisor
5
1
M
Ensure no contact while testing in progress/ Display warning signboard
Know the stated 1st-aid recommended in MSDS
Supervisor
Page 2 of 2
RISK ASSESSMENT FORM Conducted By (Date)
Company
Group 4
Task
Test and Commission Main Switch Board
Approved By (Date)
Group 4
Next Review Date
1. Hazard Identification
2. Risk Evaluation
3. Risk Control
Hazard
Possible Accident/III Health & Persons-at-risk
Existing Risk Control
Severity
Risk Level
Task Step
1
Main switch board cleaning
Chemical exposure to skin and body parts
-Skin itch -Eye irritation
-Highlight in VSCC -PPE (eye protection, hand gloves) -Continuous ventilation -Temporary light and ventilation -Display warning sign
2
2
MSB Bus Bar Insulation test and check
Electric hazard
Finger injury
-PPE (hand gloves) -Calibrated and tested equipment -Skilled electrician -Rubber Mat
2
3
MSB Control Circuit check
Electric hazard
Finger injury
-PPE - Calibrated and tested equipment -Skilled electrician
4
Bus Bar Torque & Breaker Termination check
-Slip -Sharp edges
-Hand injury -Body injury -Cut/hand and body injury
-Use appropriate tools -PPE -Skilled electrician
Association of Singapore Marine Industries
Likelihood
No.
Additional Risk Control Measure
Reference
Action Officer Follow-up Date)
Document for Reference
1
L
Supervisor/ Charge hand
MSDS
1
L
Supervisor/ Charge hand
2
1
L
Supervisor Charge hand
2
2
L
Supervisor/ Charge hand
Page 1 of 2
1. Hazard Identification
2. Risk Evaluation
3. Risk Control
Task Step
Hazard
Possible Accident/ Ill Health & Personsat-risk
Existing Risk Control
Severity
Likelihood
5
Energize the main switch board
-Short circuit -Explosion
-Death -Body injury -Burn
(Steps before this step) -Sign boards -Barricade -Insulation mat -Standby FFA -PPE -Skilled electrician
5
1
6
Function test main switch board
Short circuit
-Electrical shock -Body injury
-SWP checklist -Skilled electrician
3
1
L
Association of Singapore Marine Industries
Risk Level
No.
Additional Risk Control Measure
Action Officer (Follow-up Date)
M
-Permit highlight in VSCC -Briefing all personnel
Commissioning Engineer/ Supervisor
Reference Document for Reference
Commissioning Engineer/ Supervisor/ Chargehand
Page 2 of 2
RISK ASSESSMENT FORM Conducted By (Date)
Company
Group 5
Task
Renewal of Echo Sounder and Speed Log
Approved By (Date)
Next Review Date
1. Hazard Identification
2. Risk Evaluation
3. Risk Control
Task Step
Hazard
Possible Accident/III Health & Persons-at-risk
Existing Risk Control
Severity
Likelihood
Risk Level
No.
Additional Risk Control Measure
Action Officer Follow-up Date)
1
Inspection of echo sounder and speed log
-Lack of O2
-Asphyxiation
-Entry permit -Force ventilation -General lighting
5
1
M
-portable gas meter -Torchlight -Tank cleaning
Supervisor
-Falling hazards
-Body injury
-Lifeline rope -Body harness/ safety belt
5
1
M
2
Disconnect sounder and speed log
Electric Shock
Electrocution Fatality
-Workers briefed during Take 5 -Work highlighted in VSCC -Isolate power supply -LOTO
5
1
M
-Discharge residual voltage -Test with meter
Supervisor and Individual Electrician
3
Hotwork
Fire and explosion
Burns Fatality
5
1
M
-Pressurized Fire line
Supervisor and Hot worker
4
Work at height
Falling hazard
Fractures Fatality
-Workers briefed -Work highlighted in VSCC -Permit to work -Proper PPE -Proper tool -Fire watchman -Workers briefed -Work highlighted in VSCC -Permit to work -Safety harness
5
1
M
Association of Singapore Marine Industries
Reference Document for Reference
Supervisor and Individual Electrician
Page 1 of 1
RISK ASSESSMENT FORM Conducted By (Date)
Company
Group 6
Task
Test Commission Main Distribution Board (DB)
Approved By (Date)
13/09/2006
1. Hazard Identification
Next Review Date
2. Risk Evaluation
Hazard
Possible Accident/III Health & Persons-at-risk
Existing Risk Control
Severity
Likelihood
Risk Level
Task Step
1
Identify the location of the whole loop according to the one-line diagram and P&ID layout drawing
-Live power supply
-Electrical shock
-Tag-Out and Lock-Out all the equipments relate to this loop
5
1
Additional Risk Control Measure
Action Officer Follow-up Date)
M
Use walkie-talkie or mobile talk to communicate
Supervisor Officer
-Fatal bodily injury
-PPE, -Check the staging “OK” -Tag and use harness
5
1
M
-Apply entry permit and use ventfan
5
1
M
-Falling from height
-Lack of oxygen -Gas of explosion
13/09/2009
3. Risk Control
No.
-Unknown gas condition
Group 6 (13/09/2006)
2
Visual check the grounding cable and cleaning for the panel
Live power supply
Electrical shock
-Tag-Out and Lock-Out power supply unit for the panel -PPE -Use proper tool
5
1
M
Use walkie-talkie or mobile talk to communicate
Supervisor Officer
3
Disconnect all the cables to do the continuous check and merger test
Live power supply
Electrical shock
-PPE -Tag-Out and Lock-Out power supply unit for the panel -Make sure use proper tools and the tools all in good condition -Line check by skilled electrician
5
1
M
Use walkie-talkie or mobile talk to communicate
Supervisor Officer
Association of Singapore Marine Industries
Reference Document for Reference
Page 1 of 2
1. Hazard Identification
2. Risk Evaluation
3. Risk Control
Hazard
Possible Accident/ Ill Health & Personsat-risk
Existing Risk Control
Severity
Risk Level
Task Step
4
Connect back all the cables and make sure its exactly following the connection diagram
Live power supply
Electrical shock
-PPE -Tag-Out and Lock-Out power supply unit for the panel - Ensure all termination must be tightened. -Out-going must be secured -Line check by skilled electrician
5
5
Power On
Live power supply
Electrical shock
-Put warning symbol of energized -First quickly ON-OFF one or two times
5
1
Association of Singapore Marine Industries
Likelihood
No.
Reference
Additional Risk Control Measure
Action Officer (Follow-up Date)
1
M
Use walkie-talkie or mobile talk to communicate
Supervisor Officer
M
Barricade work area
Supervisor Officer
Document for Reference
Page 2 of 2
RISK ASSESSMENT FORM Conducted By (Date)
Company
Group 7
Task
Test and Commissioning of High Tension Switchboard
Approved By (Date)
Group 7 (13/09/06)
Next Review Date
1. Hazard Identification
13/09/09
2. Risk Evaluation
3. Risk Control
Hazard
Possible Accident/III Health & Persons-at-risk
Existing Risk Control
Severity
1
Cleaning of switchboard
-Fumes, vapor, chemical and dust
-Inhalation of harmful chemical
-VSCC meeting -Wear mask -Hand Glove
3
-Present of live power
-Electrocution
-LOTO
5
Risk Level
Task Step
Likelihood
No.
Additional Risk Control Measure
Action Officer Follow-up Date)
Document for Reference
1
L
-Respirator
Supervisor
MSDS
1
M
-Temporary earthing of Bus Bar
-HSE Manual
2
Line check from MSB to source of supply and internal wiring
Live terminal
Electrocution
-Isolate external source -LOTO external source --Use proper tool/ measuring device -Rudder mat -Deploy skilled electrician
5
1
M
Barricade & display warning sign
Supervisor
3
High pot and megger test
Present of live power
Electrocution
--Deploy skilled electrician -Do it at night (silent hour) --Use proper tool/ measuring device -Rubber Mat
5
1
M
Discharge residue power
Supervisor
4
Torque Wrench Test
Present of live power
Electrocution
-LOTO
5
1
M
Temporary earthing of Bus Bar
Supervisor
5
Power up
Present of live power
Electrocution
-VSCC meeting -Permit to work -Isolate all outgoing breaker -LOTO at breaker
5
1
M
Communicate thru walkie-talkie
Supervisor
Association of Singapore Marine Industries
Reference
Display warning sign
Page 1 of 1
RISK ASSESSMENT FORM Conducted By (Date)
Company
Group 8
Task
Rewiring of Power System in Engine Room
Approved By (Date)
Next Review Date
1. Hazard Identification
2. Risk Evaluation
13/09/06
12/09/09
3. Risk Control
Task Step
Hazard
Possible Accident/III Health & Persons-at-risk
Existing Risk Control
Severity
Likelihood
Risk Level
No.
Additional Risk Control Measure
Action Officer Follow-up Date)
1
Assessment of area of work
-Greasy/Oily floor
Tripping and Slipping
-Housekeeping
2
3
M
Clean and dry environment
Safety Assessor and Supervisor
-Lack of ventilation and lighting
Body injury
-Proper lighting and ventilation
2
2
L
2
Isolation of power
Live power supply
-Electrocution
-VSCC meeting -Isolate the circuit breaker -Lock/Tag Out
5
1
M
Check and ensure no presence electricity
Supervisor
3
Disconnection and removal of existing wires
Ergonomics
Hand and body injury
-PPE -Use long sleeves overalls
2
3
M
Wear anti-slip gloves
Supervisor
4
Cable Pulling & Strapping
-Height -Ergonomics
-Body injury (back sprain/strain) -Falling (fatality)
-Harness to wear and anchor at strong point -Ladder/Staging to be provided with OK tags
5
1
M
-Men evenly spaced out while working on staging
Staging Supv & Supervisor
5
Termination
Slippage of tools and over tightening
Hand, finger and eye injury
-PPE -Proper tools
2
3
M
Wear anti-slip gloves
Supervisor
Association of Singapore Marine Industries
Reference Document for Reference
Page 1 of 1
Company
Group 9
Task
Maintanance of Existing MSB
Approved By (Date)
Mr Lim - Manager (13/09/06)
3. Risk Control Additional Risk Action Officer Control Measure Follow-up Date)
No.
Task Step
Risk Level
2. Risk Evaluation Existing Risk Control
11/09/09
Likelihood
Possible Accident/III Health & Persons-at-risk
Next Review Date
Electrical Supervisor Mr R. Rama (10/09/06)
Severity
1. Hazard Identification Hazard
RISK ASSESSMENT FORM Conducted By (Date)
1
Disconnect the main supply
Live wire
-Electric shock/ Electrocution
-VSCC & Production meeting -Isolate power -LOTO system -Supply of temp lighting -Ensure only skill electrician operate at MSB -Warning sign boards -Rubber mat
5
1
M
2
Cleaning breaker and tightening bolt and nut (air blow and hand cleaning)
-Slipping of tools -Dust
-Finger / hand injury -Respiratory illness
-PPE esp; hand gloves -Dust Mask -Proper tools
2
1
L
Supervisor
3
Check breakers
-Slipping of breakers -Limited space
-Damage to property -Finger / hand injury
-Proper tools -PPE esp; hand gloves
2
1
L
Supervisor
4
Megger the cables
Live conductors
Electric shock
-Gloves -Ensure megger discharge to earth -Use proper tool -Rubber mat -Deploy Skilled electrician
3
1
L
Supervisor
Line check and communicate by walkie-talkie
Reference Document for Reference
Supervisor
Page 1 of 2
Turn on power to MSB
Live wire
Electric shock
2. Risk Evaluation Existing Risk Control
-Ensure main cable properly terminated -Make sure all the tolls remove from MSB -Isolate all outgoing breaker -LOTO breaker
Risk Level
5
Possible Accident/ Ill Health & Personsat-risk
Likelihood
Task Step
Severity
1. Hazard Identification Hazard
No.
5
1
M
3. Risk Control Additional Risk Action Officer Control Measure (Follow-up Date)
Barricade work site n display warning sign
Reference Document for Reference
Supervisor
Page 2 of 2
RISK ASSESSMENT FORM Conducted By (Date)
Company
Group 10
Task
Replacement of Batteries in Emergency Generator Room
Approved By (Date)
13/09/06 by Group 10
1. Hazard Identification
Group 10
Next Review Date
15/09/9
2. Risk Evaluation
3. Risk Control Risk Level
Task Step
Hazard
Possible Accident/III Health & Persons-at-risk
Existing Risk Control
Severity
Likelihood
No.
Additional Risk Control Measure
Action Officer Follow-up Date)
1
Access the location of the emergency generator room (Location Identification)
Falling / Tripping
Bodily injury
-Housekeeping -Ventilation and lighting
2
2
L
Torchlight
Supervisor
2
Switch off the battery charger and check the cable
Live power supply terminals
-Electric shock -Electrocution
-PPE -Rubber glove -Correct tools -VSCC Meeting
2
3
M
Barricade work area n display warning sign
Supervisor
Fire & Explosion
Bodily injury
-Deploy skilled electrician -Prevent tool from falling onto the battery -Cover the battery with wooden plank
5
1
M
Brief worker on the procedure
3
Disconnect the link and cable with a correct size spanner (Correct tools)
Improper tools
Hand injury
-PPE -Insulation of the tools -Face mask -Proper tools
1
1
L
Supervisor
4
Take out the battery from the battery box manually and clean the box
Manual lifting
-Back injury -Hand injury
-Require two persons to lift -Correct posture -PPE -Manual lifting procedure
2
2
L
Supervisor
Association of Singapore Marine Industries
Reference Document for Reference
Page 1 of 2
1. Hazard Identification
2. Risk Evaluation
3. Risk Control
No.
Task Step
Hazard
Possible Accident/ Ill Health & Personsat-risk
Existing Risk Control
Severity
Likelihood
Risk Level
5
Replace new battery into the battery box
Manual lifting
Back injury
- Require two persons to lift -Correct posture -PPE -Manual lifting procedure
2
2
L
Supervisor
6
Reconnect back the battery link and cable
Live terminal
-Electric shock
-Use correct tool -PPE --Insulation of the tools
3
1
L
Supervisor
Association of Singapore Marine Industries
Additional Risk Control Measure
Action Officer (Follow-up Date)
Reference Document for Reference
Page 2 of 2