Waterproofing Method Statement

  • Uploaded by: Suprodip Das
  • 0
  • 0
  • February 2021
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Waterproofing Method Statement as PDF for free.

More details

  • Words: 4,907
  • Pages: 27
Loading documents preview...
EMPLOYER

CONTRACTOR

ENGINEER

P.O. Box 173 Abu Dhabi UAE

P.O. Box 12970, Abu Dhabi, UAE

P.O. Box 7562

Tel: +971 2 694 6307

Tel: +971 2 641 5565

Tel: +971 2 614 9100

Fax: +971 2 416 4000

Fax: +971 2 641 8828

Fax: +971 2 627 0999

DOCUMENT TRANSMITTAL SHEET PROJECT

DTS No.

PROJECT NO. N-14516.1 NEW ADAC, CUP2 132KV CABLE WORKS [132KV CABLES BETWEEN EACH OF BAHIA, FALAH, SHAMKHA, & ADAC-CUP-2 SUBSTATIONS]

N14516.1 – DTS131 Previous: DTS083

FORWARDED TO

SUBMITTED

CODE

For Information Only

1

For Comment and Approval

2

Approved Document

3

STATUS

CODE

Cat No.1: Approved

AP

Cat No.2: Approved Except as Noted Cat No.3: Not Approved

AEN NA

Cat No.4: Not Subject to Approval Cat No.5: Returned

NSA Returned

The following Documents are enclosed: CODE

DOC NO.

REV.

DATE

DOCUMENT TITLE

N14516.1 AM 5100 M 402

B

27/12/2016

Method Statement for Soil Resistivity Measurement

SUBMITTED

STATUS

2

REMARKS

CONTRACTOR

EMPLOYER

CONSULTANT

DATE

DATE

DATE

27/12/2016

Note: The above comments, approval does not relieve the contractor from obligations in the contract to ensure conformance to specifications. Any deviations from specification found subsequent to issuance of comments, approval are to be corrected by the contractor to the satisfaction of the TRANSCO / ENGINEER.

Document No.: EPD/QHSE/FRM/PRO1.1 Rev. No: 0

Effective Date: 01.07.2008

Date: 27.12.2016

METHOD STATEMENT FOR SOIL RESISTIVITY MEASUREMENT

Rev. B

Project:

N-14516.1 - New ADAC CUP2 Cable Works (132kV Cables Between each of Bahia, Falah, Shamkha & ADAC-CUP-2 Substation)

Client:

M/s Transco

Consultant:

M/s Atkins

Contractor:

M/s Ghantoot Tpt. & Gen. Cont.

Supplier: Manufacture: Item Description:

METHOD STATEMENT FOR SOIL RESISTIVITY MEASUREMENT

INDEX Description

S.No.

1

Contactor Reply Sheet

2

Previous Comment

3

Revised Method Statement

Remarks

Contractor Reply Sheet

CONTRACTORS REPLY SHEET PROJECT NO.

:

N-14516.1

Project Name

:

New ADAC, CUP2 Cable Works

Reference

:

Comments of DTS083 –Method Statement for Soil Resistivity Measurement; Rev. A

Sl. No.

Atkins Comments

Reply

CI 3.0 - End User is not applicable.

Noted and revised. kindly refer to Cl 3.0.

2.

CI 5.1 calibration certificate copy shall be enclosed.

Updated testing instruments list is incorporated with calibration certificate. Kindly refer to Cl 5.1.

3.

CI 5.0 - revision year for IEEE 80-2013, IEEE 812012.

Noted and revised. Kindly refer to Cl 5.0.

CI 5.2 - Include suitably that contractor shall ensure prior to measurement that beneath the test location no electrical conductors are present.

Noted and incorporated. Please refer to Cl 5.2.3.

CI 5.2 - Indicate if the location will be filled with a soil layer > 1 m to raise the level, two soil

Noted and incorporated. Please refer to Cl 5.2.7.

CI 5.2.4, 5.2.5 - area to be measured, electrode spacing shall be project specific and legend for electrode depth shall be b. Locations where this measurement is undertaken shall also be provided.

Kindly note that the electrode spacing depends on the available area for measurements and it is subject to change from location to location. Similarly, the spike depth depends on the soil type which might be deferent from location to location. However, the spacing and depth are recorder for each location. Moreover, these measurements shall be conducted at joint pit location.

CI 5.3 equation reference shall be 49 and 50 respectively based on IEEE 80-2013.

Noted and incorporated. Please refer to Cl 5.3.

CI 5.4 — The same table shall be used at site for recording measurements. Hence this table shall also list electrode depth b against each electrode spacing a.

Noted and incorporated. Please refer to Cl 5.4.

CI 6.1 shall include four electrodes, measuring tape, hammer, insulated wires for connection to electrodes.

Noted and incorporated. Please refer to Cl 6.1.

CI 8.3 - hazard shall also list electrical conductors beneath test location with control measure in compliance with IEEE 81 CI 6.7 .

Noted and incorporated. Please refer to Cl 8.3.

1.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

CI 8.3 - hazard shall also list electrical shock along with relevant control measure.

Noted and incorporated. Please refer to Cl 8.3.

Aspect shall also list electrode cannot reach proposed depth b at site (due to hard soil) along

Noted, Noted electrode depth should be 1/10 of the space between electrodes which shall be maintained during testing.

CI 8.3 table shall include risk level (Low, Medium, High).

Noted and incorporated. Please refer to Cl 8.3.

With Regards Contractor

Previous Comment

Revised Method Statement

PROJECT NO. N-14516.1 N 14516.1 NEW ADAC, CUP2 132KV CABLE WORK Document Number

Document Title

N14516 -AM N14516.1AM-5100 5100-M 5100 M402 402

METHOD STATEMENT FOR SOIL RESISTIVITY MEASUREMENT

Rev. Date Page

B 27 7-DEC DEC 2016 DEC-2016 2 of 13

TABLE OF CONTENTS 1.0

SCOPE................................ SCOPE................................................................ ................................................................................................ .............................................................................................. .............................................................. 3

2.0

PURPOSE ................................................................ ................................................................................................ ................................................................ .......................................................... .......................... 3

3.0

DEFINITIONS AND ABBREVIATIONS ABBREVIATIONS ................................ ................................................................ ................................ ............................................... ............... 3

4.0

DUTIES AND RESPONSIBILITIES RESPONSIBILITIES ................................ ................................................................ ................................ ........................................................ ........................ 4

5.0

PROCEDURAL STEPS ................................ ................................................................ ........................................................................ ................................................................ ........................................ 6

6.0

RESOURCES AND SCHEDULE SCHEDU LE ................................................................ ................................................................ ........................................................ ........................10 ........................ 10

7.0

................................................................ QUALITY CONTROL ................................ ....................................................................... ................................................................ .......................................1 .......10

8.0

HEALTH, SAFETY & ENVIRONMENT ENVIRONMENT REQUIREMENTS REQUIREMENT S................................ ................................ ..................................................... .....................11 ..................... 11

9.0

................................................................ .................................................. REFERENCES ................................ ................................................................ ................................ ................................ ..................13 .................. 13

PROJECT NO. N-14516.1 N 14516.1 NEW ADAC, CUP2 132KV CABLE WORK Document Number

Document Title

N14516 -AM N14516.1AM-5100 5100-M 5100 M402 402

METHOD STATEMENT FOR SOIL RESISTIVITY MEASUREMENT

1.0 1.1

Rev. Date Page

B 27 7-DEC DEC 2016 DEC-2016 3 of 13

SCOPE SCOPE OF WORK: TRANSCO TRANSCO are are reinforcing reinforcing the the electricity electricity supply supply to to the the Abu Abu Dhabi Dhabi International International Airport Airport through the construction of a new 132/22kV primary primary substation substation (the (the CUP2 CUP2 substation). substation). This This isis a a high high priority priority project project for for TRANSCO TRANSCO and and the the work work will will be be arranged arranged through through two two tenders; tenders; (1) (1) the the substation substation including including internal internal substation substation cabling cabling and and (2) (2) the the 132kV 132kV cable cable feeders feeders to to provide the the supply to the new substation. These These Tender Tender documents documents concern concern the the 132kV 132kV cable cable feeders feeders and and call call for for the the Design, Design, supply, supply, installation installation and and commissioning commissioning of of six six 132kV 132kV cable cable circuits circuits on on a a lump lump sum sum turnkey turnkey basis basis and and executed as an EPC (Engineering, Procurement and Construction) contract. The cable circuits are briefly described as follows:

1.2

SCOPE OF MS: The scope of this document document isis to to set set up up the the work work activities activities in in sequence sequence for for ““soil resistivity measurement” measurement ” at site which shall include but not limited to the following: fol lowing:

2.0

PURPOSE The purpose of this Method statement is to set guidelines and methodology to be followed the “““soil with safe working practices while performing the soil resistivity measurement measuremen t”” and methods, material material used, used, resources, resources, schedul schedul schedule, describes the execution methods, e, design basis and reference followed at project site.

3.0

DEFINITIONS AND ABBREVIATIONS used where where applicable: applicable: The following definitions description shall be used M/s. TRANSCO (Abu (Abu Dhabi Transmission & Despatch Company) Company

COMPANY

:

CONSULTANT

: M/S. ATKINS

CONTRACTOR CONTRACTOR

:

VENDOR /SUPPLIER

Internal Audit

IMS

(Electrical M/s. Ghantoot Tpt. & Gen. Cont. Est. (Electrical Projects Division) Corporation to to whom whom The person, firm, COMPANY or Corporation : their assignees. assignees. the Purchase Order is placed including their A systematic and documented verification verificati on process of objectively obtaining and evaluating evidence to determine whether the Ghantoot’s integrated management systems conform to the EN ISO : OHSAS 9001:2008, EN ISO 14001:2004 and BS OHSAS 18001:2007 Standards audit criteria, set by the Ghantoot and for communication communication of the results of this process to management which covers covers all all : An Integrated Management System which

PROJECT NO. N-14516.1 N 14516.1 NEW ADAC, CUP2 132KV CABLE WORK Document Number

Document Title

N14516 -AM N14516.1AM-5100 5100-M 5100 M402 402

METHOD STATEMENT FOR SOIL RESISTIVITY MEASUREMENT

Rev. Date Page

B 27 7-DEC DEC 2016 DEC-2016 4 of 13

the clauses and requirements of ISO 9001:2008, 9001:2008, 14001:2004 & OHSAS 18001:2007 Standards. ISO

: International Standards Organization

ITP

: Inspection Test Plan

RFI

: Request for Inspection

NCR

Non conformance Report: Any deviation from work work standards, procedures, regulations, IMS performance, performance, etc., that could either directly or indirectly lead to : unintended use or delivery, or lead to injury or illness, property damages, damage to (GHANTOOT) establishment work place environment or a combination of these

MS

: Method Statement

MASS ASS

: Material Approval Submittal Sheet

IFC

: Issued for Construction

HSE

: Health Safety and Environment

SSR

System stem Safety Rules by Transco

TRA PPE

: Task Risk Assessment Personal Protective Equipment

NOC

: No Objection Certificate

LAP

: Limited access permit

UG

: Under Ground

HV

: High Volt

4.0

DUTIES AND RESPONSIBILITIES

4.1

necessary concerned The competent person shall obtained ne cessary approvals from the Client/ concerned authorities prior prior to to the the work. work. He He shall shall open open necessary necessary Limited Limited Access Access Permit Permit (LAP) (LAP) prior prior to to authorities unsafe activities activities start the activities at site and shall be accountable for the elimination of unsafe that may lead to accidents. acciden ts.

4.2

EPD Project Project Manager Manager shall shall be be responsible responsible for for timely timely and and quality quality execution execution of of project project GTGC-EPD GTGC EPD client requirements. requirements. He He shall shall have have overall overall responsibility responsibility for the effective activities in line with client use of resources and manpower as per the scope to ensure the effective effective implementation of the project Management System.

PROJECT NO. N-14516.1 N 14516.1 NEW ADAC, CUP2 132KV CABLE WORK Document Number

Document Title

N14516 -AM N14516.1AM-5100 5100-M 5100 M402 402

METHOD STATEMENT FOR SOIL RESISTIVITY MEASUREMENT

Rev. Date Page

B 27 7-DEC DEC 2016 DEC-2016 5 of 13

4.3

GTGC-EPD GTGC EPD Construction Manager shall be responsible for coordination and supervision of construction activities and construction groups to ensure that all activities are done and carried out as per a approved pproved documents/ drawings/materials and all safety measures are are implemented. He shall organize implemented. organize Inspection/testing when whenever ever required required.

4.4

GTGC-EPD GTGC EPD EPD Project Project Engineer Engineer isis responsible responsible to to ensure ensure all all operations operations are are in in accordance accordance with with the relevant Project contract sp specifications, ecifications, method statements statements and and check check the the accuracy accuracy of the works done by the site engineers.

4.5

GTGC-EPD GTGC EPD Site Engineer shall monitor the the site site execution execution in in coordination coordination with with foreman/supervisor foreman/supervisor and and ensure ensure that that all all works works are are carried carried out out according according to to design, design, a approved pproved pproved shop shop drawing drawing and and contract contract specification. specification. Liaise Liaise with with QC QC Dept Dept for for timely timely rising rising of of Inspection Test Request.

4.6

GTGC-EPD GTGC EPD Foreman/supervisor Foreman/supervisor shall shall supervise supervise and and execute execute the the job job at at site site in in coordination coordination and control over Construction workforce and equipments equipment equipment as per the instruction of Engineer in line with approved drawings and documents. documents.

4.7

GTGC-EPD GTGC EPD HSE officer sshall hall be responsible for the implementation implementation of of control control measures measures TRA,, PPE’s and ensure permit to works prior to start of any activity. He is mentioned in the TRA for the the Induction Induction talk talk and and relevant relevant awareness awareness training training programs programs and and will will responsible for effectiveness of of Tool Tool Box Box talks talks before before starting starting the the activities activities on on site. site. ensure the effectiveness

4.8

GTGC-EPD GTGC EPD HSE Engineer shall be responsible for the enforcement of all HSE procedure procedures.. He shall be be verifying verifying that that HSE HSE measures measures have have been been implied, implied, met met and and adhered adhered in in coordination coordination shall with site management.

4.9

coordination with with the the Construction GTGC-EPD GTGC EPD QC Inspector shall be responsible for coordination Manager and to ensure the stage wise inspections are planned, pla nned, carried out and necessary Inspection Inspection and and Test Test Reports Reports are are made made and and signed signed by by all all the the concern concern personnel personnel necessary specification. as per the approved ITP/approved ITP/approved drawings and Contract specification

4.10

GTGC-EPD GTGC EPD QA/QC Engineer is responsible for ensuring full compliance comp liance with contract contract specification and and Client/Consultant Client/Consultant approval approvalss. documents and ensures quality as per specification

4.11

GTGC-EPD GTGC EPD Testing Engineer shall be approved by TRANSCO and shall ensure that all are carried carried out out according according to to the the approved approved ITP, ITP, specifications specifications and and applicable tests are method me thod of statement.

4.12

Keeper shall shall be be responsible responsible for for Receiving Receiving and and issuing issuing all all materials materials for for site site GTGC-EPD GTGC EPD Store Keeper following material material safe safe handling handling procedures. procedures. He He shall shall maintain maintain all all records records for for quick quick status status following and traceability of Project Materials.

4.13

responsible for for carrying carrying out out all all setting setting out out and and survey survey works works under under GTGC-EPD GTGC EPD Surveyor Surveyor is responsible the guidance and supervision of the Site Engineer.

PROJECT NO. N-14516.1 N 14516.1 NEW ADAC, CUP2 132KV CABLE WORK Document Number

Document Title

N14516 -AM N14516.1AM-5100 5100-M 5100 M402 402

METHOD STATEMENT FOR SOIL RESISTIVITY MEASUREMENT

5.0

Rev. Date Page

B 27 7-DEC DEC 2016 DEC-2016 6 of 13

PROCEDURAL STEPS The site test procedure procedure of of the the soil soil resistivity resistivity measurement measurement isis made made in in accordance accordance with: with:



IEEE Standard 80-20 80 2013 13



IEEE Standard 81-2012 81 2012

5.1

TESTING INSTRUMENT Instrument Digital Earth Tester

Model DET4TD2

DET4TCR2

Make Megger

SI. No

Calibration Certificate

1000347101516 451

Enclosed.

1000347101497 566

Enclosed.

1000 346/100210/1575 1000-346/100210/1575

Enclosed.

OR EQUIVALENT 5.2 5.2.1

MEASURING MEA SURING TECHNIQUE The most most common common method method of of measuring measuring soil soil resistivity resistivity isis WENNER WENNER method. method. Four Four test test spikes spikes The at equal equal distances distances “a” and to a depth of not are inserted into the ground in a straight line at more than 1/10 of “a”. The instrument is connected to the test spikes as shown in Fig. 1 below.

a/10

using Wenner Wenner Method Method Fig. 1 Soil Resistivity Measurement using

5.2.2

The test test should should be be witnessed witnessed by by Consultant Consultant Engineer. Engineer. Hence, Hence, coordination coordination with with Concerned Concerned The Engineer at site is of prime importance.

5.2.3

soil, the the test test engineer engineer shall shall check check the the area area for for any any indication indication for for Prior to spike insertion insertion to the soil, there are are no no electrical electrical services services electrical services beneath the test location and to make sure that there are present.

PROJECT NO. N-14516.1 N 14516.1 NEW ADAC, CUP2 132KV CABLE WORK Document Number

Document Title

N14516 -AM N14516.1AM-5100 5100-M 5100 M402 402

METHOD STATEMENT FOR SOIL RESISTIVITY MEASUREMENT

Rev. Date Page

B 27 7-DEC DEC 2016 DEC-2016 7 of 13

5.2.4

The voltage between the two inner (potential) electrodes electrodes is then measured and divided by the the current current between between the the two two outer outer (current) (current) electrodes electrodes to to give give a a value value of of resistance resistance R. R. This This isis done done by the aid of the testing equipment ““Digital Digital Earth Tester Tester”; ”; in which calculations are done internally and hence would disp display lay the value of the resistance.

5.2.5

The four test spikes are then re re-positioned positioned for the further further tests tests along along a a different different line line (M1, (M1, M2 M2 …), as indicated in Fig. 2 with both the spacing “a” “ ” (1, 3, 5, 7, 9, 12, 15 …. meter) meter) and and the the depth depth of of not more than “a/10 “a/10 a/10” iss maintained. maintained. The The resistivity resistivity calculated calculated from from the the formula formula given given below below isis the the average soil resistivity to a depth “b “ b”. ”.

5.2.6

Re Re-spacing spacing spacing the the test test spikes spikes at at different different separations separations “a” “a” will will yield yield results results from from which which a a profile profile of of the the resistivity at new depth ““b” ” can be obtained. The tests tests repeated repeated for for different different directions directions (M1, (M1, M2 M2 …) …) to cover most of the plot area a rea with the specific locations.

5.2.7

If the the location location will will be be filled filled with with soil soil layer layer >> 1m 1m to to raise raise the the level, level, two two soil soil measurements measurements will will be be carried out before and after the filling. M3 M2 M5

M6 M6

M1 M4

Fig.2. Soil resistivity measurement direction specification, or or agreed agreed at at site) site) (Indicative only and to be follo followed wed as per authority specification,

PROJECT NO. N-14516.1 N 14516.1 NEW ADAC, CUP2 132KV CABLE WORK Document Number

Document Title

N14516 -AM N14516.1AM-5100 5100-M 5100 M402 402

METHOD STATEMENT FOR SOIL RESISTIVITY MEASUREMENT

5.3

Rev. Date Page

B 27 7-DEC DEC 2016 DEC-2016 8 of 13

CALCULATION OF RESISTIVITY Based Based on on the the above above tests tests and and according according to to the the recorded recorded values values of of the the resistance resistance against against the the separation of the spikes and the the depth depth of of the the spikes; spikes; soil soil resistivity resistivity isis calcula calculated as follows:

(Equation Equation 49 4 9 from IEEE 80-20 80 2013 13)

Where; Rm

=

the Measured Soil resistance in Ω

a

=

the distance between the spikes in m

b

=

the depth of o f spikes

ρ

=

the apparent soil resistivity at a depth of ‘b ‘ b’’ in Ωm.

However, assuming assuming that that the the tests tests were were carried carried out out in in homogeneous homogeneous soil soil and and that that the the depth depth ““ b However, b”” (which is the depth of the test spikes defined by a/10) a/10) is small compared to “a”; which is the case probes penetrating penetrating the the ground ground isis only only at at a a short short distance; distance; then then present at our joint locations as the probes the soil resistivity is simplified to:

(Equation Equation 50 from IEEE 80-20 80 2013))

PROJECT NO. N-14516.1 N 14516.1 NEW ADAC, CUP2 132KV CABLE WORK Document Number

Document Title

N14516 -AM N14516.1AM-5100 5100-M 5100 M402 402

METHOD STATEMENT FOR SOIL RESISTIVITY MEASUREMENT

5.4

Rev. Date Page

B 27 7-DEC DEC 2016 DEC-2016 9 of 13

SOIL RESISTIVITY MEASUREMENT SHEET

Client

Date

Consultant

Time Of Test

Contractor

Temperature

Project

Climate

Method Material Equipment

Serial No Calculation of Due Date

Make

Distance Between adjacent electrodes (a) in m

Electrode Depth (b) in m

Measured Measured Resistance (R) in Ohm

Average Soil Resistivity In ohm ohmm

Soil Resistivity

S.No

1

M1

M3

M5

M1

M3

M5

2 3 4 5 Notes

TESTED BY NAME SIGNATURE DATE

WITNESSED BY

APPROVED APPR OVED BY

PROJECT NO. N-14516.1 N 14516.1 NEW ADAC, CUP2 132KV CABLE WORK Document Number

Document Title

N14516 -AM N14516.1AM-5100 5100-M 5100 M402 402

METHOD STATEMENT FOR SOIL RESISTIVITY MEASUREMENT

6.0

Rev. Date Page

B 27 7-DEC DEC 2016 DEC-2016 10 of 13

RESOURCES AND SCHEDULE Project manager/ manager/ Construction Construction manager manager will will mobilize mobilize (approved (approved Materials, Materials, Tools, Tools, Equipment and and Manpower) Manpower) required required to to carry carry out out onsite onsite activities activities in in a a safe safe manner. manner. All tools and equipments equipments shall be properly identified, identified, calibrated calibrated from from approved approved third third party prior to use and and must must have have valid valid calibration calibration certificates certificates (if (if applicable). applicable).

6.1

TEST EQUIPMENTS TO BE USED: Adequate number number of of equipment equipment of of suitable suitable type type // capacity capacity in in good good working working cond condition will will be be deployed. deployed. Equipment Equipment and and vehicles vehicles shall shall be be inspected inspected and and certified certified by by COMPANY COMPANY approved approved TPI TPI services services and and certificate certificate of of fitness fitness shall shall be be submitted submitted to to COMPANY COMPANY prior prior to to its its deployment at site. The following type of equipment is identified as per the scope 

Digital earth tester or Equivalent



Four Electrodes



Measuring Tape



Hammer



Insulated Wires

7.0

QUALITY CONTROL

7.1

EPD shall shall provide provide and and maintain maintain a a Quality Quality Control Control (QC) (QC) program program by by functional functional area area GTGC - EPD which shall assure that all services and supplies submitted s ubmitted to the client/ consultant for acceptance conform to contract requirements.

7.2

inspections and and verifications verifications necessary necessary to to substantiate substantiate GTGC - EPD shall perform all inspections Request Notification Notification on on completi completi completion on conformance and also shall submit official Inspection Request completion of each stage well in advance otherwise required.

7.3

GTGC-EPD Succeeding activity shall not commence unless GTGC EPD obtained clearance for the previous activity from the Client’s Engineer.

7.4

responsible to to verify verify all all the the const const construction GTGC - EPD Quality Control Inspector isis responsible ruction activities as per per approved approved ITP’s ITP’s in in coordination coordination with with the the Client Client representative representative in in a a timely timely manner. manner. as

7.5

Visual inspection inspection of of materials materials shall shall be be carried carried out out at at warehouse/ warehouse/ Yard. Yard. Thorough Thorough inspection inspection Visual progress and and manufacturer’s manufacturer’s delivery notes will of materials and consumables as per work progress ma defect will will be be reported reported to to Concerned Concerned prior prior to to transport transport to to site. site. be taken. Any defect

7.6

records shall shall be be maintained maintained to to each each stage stage of of the the work work and and documented documented as as Quality records defined in the ITP till the completion of the works.

PROJECT NO. N-14516.1 N 14516.1 NEW ADAC, CUP2 132KV CABLE WORK Document Number

Document Title

N14516 -AM N14516.1AM-5100 5100-M 5100 M402 402

METHOD STATEMENT FOR SOIL RESISTIVITY MEASUREMENT

8.0

Rev. Date Page

B 27 7-DEC DEC 2016 DEC-2016 11 of 13

H HEALTH, EALTH, SAFETY SAFETY & ENVIRONMENT REQUIREMENTS OBJECTIVES OBJECTIVES: To To ensure ensure that that all all safe safe practices practices are are adhered adhered to, to, as as per per standard standard operating operating procedures, procedures, Safety Management Management Plan Plan and and contractual contractual obligations obligations while while doing doing works works at at site. site. HSE requirements shall meet the commitments directly d irectly on site as described in the Project HSE HSE Plan. Plan. As As a a general general understanding understanding of of requirements, requirements, the the following following shall shall be be observed observed as as mandatory mandatory for for the the activities activities being being covered covered in in this this method method statement statement and and itit shall shall be be the the responsibility of all Personnel inv involved olved in safe execution of the construction activities. activities.

8.1

HEALTH

8.1.1

During During hot hot summer summer adequate adequate water water to to be be taken taken and and whole whole body body to to be be protected protected from from direct sun rays.

8.1.2

Hydrolyte Powder / ORS shall be available at at site site during during summer. summer.

8.1.3

that the the working working environment environment isis safe safe and and all all The safety officer shall observe observe and make sure that the running activities are safe.

8.1.4

water coolers, coolers, Provide proper welfare facilities like adequate number of portable cold water shelterss at convenient locations for freq frequent eating area, rest rooms and rest shelter uent rest while working on hot weather climate conditions.

8.2

SAFETY

8.2.1

prior to to start start of of the the job. job. All permits/Certificate/passes shall be issued prior

8.2.2

safety rules rules and and all all personnel personnel involved involved in in the the job job shall shall be be undergone undergone HSE HSE Follow system safety Induction.

8.2.3

which describes describes the the Hazards Hazards and and Site supervisor shall conduct daily Toolbox talks which from a a general general topic. topic. precautions of the specific activity apart from

8.2.4

awareness orientation/ orientation/training All personnel shall have attended HSE induction / awareness training programs conducted in-house in house in order to be aware of the work safety.

8.2.5

Follow driving driving safety safety guidelines guidelines and and No No driving driving outside outside the the Work Work Site Site isis allowed allowed except except on on Follow approved access roads.

8.2.6

available prior prior to to commencing commencing any any work work as as required. required. Job All work permits shall be available supervisor/foreman supervisor/foreman to be available at site during execution.

8.2.7

sub-contractors are engaged engaged in in activities activities at at site site shall shall be be provided provided All employees and sub contractors who are with suitable PPE’s as applicable like: a)

Foot protection - Safety Shoes

b)

Head Protection - Safety helmet

PROJECT NO. N-14516.1 N 14516.1 NEW ADAC, CUP2 132KV CABLE WORK Document Number

Document Title

N14516 -AM N14516.1AM-5100 5100-M 5100 M402 402

METHOD STATEMENT FOR SOIL RESISTIVITY MEASUREMENT

Rev. Date Page

B 27 7-DEC DEC 2016 DEC-2016 12 of 13

c)

Eye and Face ProtectionProtection Safety Glasses Glasses (both clear and shaded)

d)

Hand Protection – Safety Gloves

e)

Safety Safety Dress/High Dress/High Visibility Visibility Vest/Protective Vest/Protective Clothing Clothing or or Coverall Coverall as as necessary necessary for for the the job job

8.2.8

Adequate fire extinguisher shall be provided in the vicinity. vicinity.

8.2.9

The safety officer shall report any inciden incidentt and stop any unsafe activity.

8.2.10 Emergency arrangements arrangements shall shall be be ensured ensured as as described described in in Emergency Emergency Response/Evacuation Response/Evacuation Plan. 8.2.11 Emergency contact list should be displayed displayed in in appropriate appropriate places. places. 8.2.12 Following shall be emergency contact numbers:

8.3

a)

Police

:

999

b)

Ambulance Ambulance

:

998

c)

Civil Defense

:

997

d)

Ghantoot Main Office

:

02 - 641 5565

HAZARDS/ASPECTS Hazards/Aspects Associated with Substation Earthing

S.N.

Hazard(s) / Aspect(s)

Risk level

1

Wrong usage of Hand tools / Equipment

H

2

Electric Shock

H

3

Earth faults in equipment

H

4

Fire and Housekeeping Hazards

H

5

Electrical conductors / Underground Underground services beneath test location

H

Recommended Control measure (s) used. Proper tools shall be used. Suitable PPE to be used. inspect the the People shall be competent. Workforce will inspect Regular inspection inspection will will be be hand tools before starting work. Regular inspection and and color color coding coding done for hand tools. Periodic inspection performed. to be perf ormed. and when when Isolation of equipment to be performed as and proper required. Suitable PPE to be used. Ensure proper conductor, supervision. Ensure the Rating, quality of conductor, tester must must be be Equipments, tools etc. Calibrated earth tester used. Competent person person shall be available on site. Standard safety procedures shall be followed. must be be fixed fixed Ensure safe connection. Conductors must the conductors; conductors; all all conductors conductors properly, no gap between the must have good contact with the equip equipments. ments. combustible Earthing area shall be clean, free from combustible present at at site. site. Ensure Ensure materials. Fire extinguisher shall be present extinguisher the workforce to know about the fire extinguisher operations. detectors/ cable cable Approved underground service detectors/ approval shall shall detectors to be used. All relevant NOC & approval authority. PTW/ PTW/ digging digging permit permit be obtained from the area authority. to be obtained as required

Residual Risk level

L

L

L

L

L

PROJECT NO. N-14516.1 N 14516.1 NEW ADAC, CUP2 132KV CABLE WORK Document Number

Document Title

N14516 -AM N14516.1AM-5100 5100-M 5100 M402 402

METHOD STATEMENT FOR SOIL RESISTIVITY MEASUREMENT

9.0

Rev. Date Page

B 27 7-DEC DEC 2016 DEC-2016 13 of 13

REFERENCES The quality of items items and and services services will will be be controlled controlled by by complying complying with with the the following following references:

   

IEEE Standard 80-20 80 2013 13 IEEE Standard 81-2012 81 2012 TRANSCO Specification Specificationss Client/ TRANSCO HSE Regulations (SSR) and related related Procedures. Procedures.

Related Documents


More Documents from "ahYing120"