14-09-18 Bomba De Levantamiento.pdf

  • Uploaded by: Jaime Rodriguez
  • 0
  • 0
  • January 2021
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View 14-09-18 Bomba De Levantamiento.pdf as PDF for free.

More details

  • Words: 3,289
  • Pages: 16
Loading documents preview...
Copyright © EWS-Energietechnik 2014

All Rights Reserved

1

2

3

4

5

6

7

8

A

A

EWS-Energietechnik

:

Hersteller

Weiherstraße 14 D-91330 Eggolsheim Telefon: +49 9545/441178 Telefax: +49 9545/441189 E-Mail: [email protected] B

B

C

D

Customer

:

System Description

:

San Lorenzo, LOCAL STARTER PANEL (MCC), THRUST BEARING HIGH PRESSURE OIL PUMPS

Project Number

:

EWS14/002

Project Manager

:

Matthias Schmitt

Infeed

:

3 / PEN 60 Hz 480 Volt, Vorsicherung max. 100A

Control Voltage

:

24 VDC

Production Time

:

II/2014

C

D

E

E Last revision ÜBERARBEITET AM

:

19.09.2014

Last Revisior

:

Matthias Schmitt

F

San Lorenzo

ÜBERARBEITET AM

Rev.

1

Anzahl der Seiten

19.09.2014

Matthias Schmitt

Date

Name

2

Voith Hydro 3

LOCAL STARTER PANEL (MCC) THRUST BEARING HIGH PRESSURE OlL PUMPS

4

5

6

: 1 30

F Deckblatt EWS14/002 7

page 1 of 30

8

Copyright © EWS-Energietechnik 2014

All Rights Reserved

1

A

2

Sheet

3

Drawing number

4

5

Sheet description

6

Comment

7

Kd-ZNr.

Cover sheet

Graphic list

02

Index of contents

Graphic list

03

General information

Graphic list

(Blank page)

05

C

D

Aufbauplan

06

Aufbauplan

Schaltschrank Front

07

Aufbauplan

Schaltschrank 1

Aufbauplan

08

Aufbauplan

Schaltschrank 2

Aufbauplan

F

09

Cable list (1)

Graphic list

10

Main circuit

Circuit diagramm

11

Volt- & Amperemeter

Circuit diagramm

12

24VDC Power Supply

Circuit diagramm

13

Cubicle light and heating

Circuit diagramm

14

Pump 1 control circuit

Circuit diagramm

15

Pump 2 control circuit

Circuit diagramm

16

Auxiliary circuit

Circuit diagramm

17

Indicator lamps

Circuit diagramm

18

Monitored information 1

Circuit diagramm

19

Monitored information 2

Circuit diagramm

20

Monitored information 3

Circuit diagramm

21

Name plates

1

C

D

Stromlaufplan

23

Schützansteuerung (2)

Stromlaufplan

24

Schnellschluss Maschine 1

Stromlaufplan

25

Schnellschluss Maschine 2

Stromlaufplan

26

Ventil Ansteuerung (1)

Stromlaufplan

27

Ventil Ansteuerung (2)

Stromlaufplan

28

Ventil Ansteuerung (3)

29

Digital Output

DO 01 1 – 01 6

Stromlaufplan

30

Digital Output

DO 01 7 – 02 4

Stromlaufplan

19.09.2014

Matthias Schmitt

Date

Name

2

Voith Hydro 3

E

Stromlaufplan

San Lorenzo

ÜBERARBEITET AM

Rev.

B

Aufbauplan

22

E

A

Type

01

04

B

8

LOCAL STARTER PANEL (MCC) THRUST BEARING HIGH PRESSURE OlL PUMPS

4

5

6

F Index of contents EWS14/002 7

page 2 of 30

8

Copyright © EWS-Energietechnik 2014

All Rights Reserved

1

2

3

4

5

6

7

8

A

A

Allgemeine Informationen General Informations Schrankverdrahtung Cubicle wiring

B

AC-Stromkreise

L1 -L3

1,5mm²

schwarz / black

SW / BK

N-Leiter

1,5mm²

hellblau / light blue

BL / BU

L1 - L3

1,5mm²

grau / grey

GR / GY

+24 VDC

1,0mm²

0 VDC

1,0mm²

Analogsignale

Adern verdrillt

Analogue Signals

twisted pair

1,0mm²

Main Circuits

AC-Steuerstromkreise AC-Control Voltage

DC-Stromkreise DC-Voltage

C

Plus Minus Fremdspannungen

1,5mm²

Interface Voltage

D

violett / violet violett & weiß /

VI & WS /

violet & white

VT & WH

braun / brown

BR / BN

braun & weiß

BR & WS /

brown & white

BN & WH

orange / orange

OR / OG

B

VI / VT

C

D

Erdung der Schrankteile Cubicle Components Grounding

6,0mm²

grün & gelb / green & yellow

GN & GE / GN & YL

Hiervon abweichende Aderquerschnitte sind in den Stromlaufplänen explizit angegeben

E

E Different core cross section will be explicit shown on the circuit diagrams

F

San Lorenzo

ÜBERARBEITET AM

Rev.

1

19.09.2014

Matthias Schmitt

Date

Name

2

Voith Hydro 3

LOCAL STARTER PANEL (MCC) THRUST BEARING HIGH PRESSURE OlL PUMPS

4

5

6

F General information EWS14/002 7

page 3 of 30

8

Copyright © EWS-Energietechnik 2014

All Rights Reserved

1

A

2

No

Part No.

10.1 B

-X00

10.1 B

03

3KA5230-1AE01 SIEMENS Hauptschalter 3-polig, Lasttrennschalter I=124A, U=690V

1

-S00

10.1 C

04

8UC7222-3BB20 SIEMENS Türkupplungs-Drehantrieb "rot/gelb"

1

-S00

10.1 C

1

-S00

10.1 C

1

-S00

10.1 C

1

-S00

10.1 C

3SB14 00-0A SIEMENS Hilfschalter 1S + 1Ö 3KX3552-3DA01 SIEMENS Anschlussabdeckung PP GREY 495x495x4 Distrelec Polypropylen Platte 495 x 495 x4mm

08

9342.270 RITTAL Connection adapter

1

10.3 A

09

9340.100 RITTAL Bodenwanne, L=50cm

1

10.3 A

10

9340.000 RITTAL Sammelschienenhalter, 3-polig

1

10.3 A

11

9340.090 RITTAL Distanzstück für 9340.000

1

10.3 A

12

3580.000 RITTAL Sammelschiene, 12x5mm, E-Cu

1

10.3 A

13

9340.070 RITTAL Endabdeckung für 9340.000

1

10.3 A

14

9342.200 RITTAL Connection adapter

2

10.3 A

3RV1031-4GB10 SIEMENS MOTOR CIRCUIT BREAKER 36-45A, SIZE S2, CLASS20 3RV1901-1E SIEMENS Querliegender Hilfsschalter 9340.410 RITTAL Geräteadapter, Bemessungsstrom: 65A 3RV1031-4GB10 SIEMENS MOTOR CIRCUIT BREAKER 36-45A, SIZE S2, CLASS20

19

3RV1901-1E SIEMENS Querliegender Hilfsschalter

20

9340.410 RITTAL Geräteadapter, Bemessungsstrom: 65A SIEMENS CONTACTOR AC-3, 22kW, 2NO+2NC, 3 POLES, SIZE S2

1

-Q01

10.4 B

1

-Q01

10.4 B

1

-Q01

10.4 B

1

-Q02

10.6 B

1

-Q02

10.6 B

1

-Q02

10.6 B

1

-K01

10.4 B

21

3RT1036-1BB44

22

3RT1036-1BB44 SIEMENS CONTACTOR AC-3, 22kW, 2NO+2NC, 3 POLES, SIZE S2

1

-K02

10.6 B

23

3LD2704-0TK51 SIEMENS MAIN CURCUIT BREAKER, AC-3, 30 kW, Betätig.elem.: schwarz

1

-S01

10.4 C

1

-S01

10.4 C

3LD9200-5B SIEMENS Hilfschalter 1S + 1Ö

24 25

1

-S02

10.6 C

1

-S02

10.6 C

2277815 PHÖNIX CONTACT Stromwandler, 60 / 5A, Klasse 1

3

-T11, T12, T13

10.4 D

2277815 PHÖNIX CONTACT Stromwandler, 60 / 5A, Klasse 1

3LD2704-0TK51 SIEMENS MAIN CURCUIT BREAKER, AC-3, 30 kW, Betätig.elem.: schwarz 3LD9200-5B SIEMENS Hilfschalter 1S + 1Ö

26 27 28

3

-T21, T22, T23

10.6 D

29

5SY7 310-6 SIEMENS Leitungschutzschalter 3-polig, B10, 15kA

1

-F01

10.7 B

30

5SY7 310-6 SIEMENS Leitungschutzschalter 3-polig, B10, 15kA

1

-F02

10.8 B

San Lorenzo

ÜBERARBEITET AM

19.09.2014

Matthias Schmitt

Date

Name

2

Voith Hydro 3

LOCAL STARTER PANEL (MCC) THRUST BEARING HIGH PRESSURE OlL PUMPS

4

5

6

A

Ref.

-X00

18

1

Item Desig.

1

17

Rev.

Location

8

3

16

F

Amount

7

UKH 95 PHÖNIX CONTACT High-current terminal block

15

E

Description

6

USLKG 95 PHÖNIX CONTACT Ground modular terminal block

07

D

5

02

06

C

4

01

05

B

3

B

C

D

E

F Equipment list 1 EWS14/002 7

page 4 of 30

8

2

3

6

7

8

L2

A

-Q01 36...45A

1

2

3

-Q02 36...45A

13 21

1

2

15.2 C

L3

14.2 C

3

13 21

1

3

5

-F01 I>

-X00

3

3

3

5

I>

I>

2

4

6

B

1

2

3

1

3

5

2

4

6 H07V-K 1,5²

-K02

1

2

4

6

1

3

5

13 11

2

4

6

1

3

5

13 11

L1 -S01

2

4

6

4

2

2

4

14 12

6

2

4

-T21

-T11

11.6 C 11.7 C

-T22

-T12

D

11.2 C

11.8 C

-T23

-T13 1

11.3 C

2

3

PE

1

-X01

2

3

PE

U

V

E

Ölflex CLASSIC 110

PE

4G16²

1

11.8 C

-X02

Ölflex CLASSIC 110

Rev.

PE

4G16²

W

U

V

W

M

M

22kW, 480 VAC

22kW, 480 VAC

San Lorenzo

19.09.2014

Matthias Schmitt

Date

Name

2

Voith Hydro 3

D

11.7 C

11.3 C

ÜBERARBEITET AM

C

11.6 C

11.1 C 11.2 C

F

L3

14 12

6

11.1 C

E

L2

-S02

20.3 C

-S00

11.4 E

15.5 E

11.4 E

14.5 E

20.2 C

C

2

1

I>

-K01

H07V-K 35²

5

1

5

-F02

H07V-K 16²

20.1 C

H07V-K 35²

3

I>

H07V-K 16²

PE

1

I>

3

14 22

15.2 C

14 22

PE

20.3 C

3

14.2 C

2

20.2 C

B

1

1

11.4 E

connection adapter RITTAL 9342.270

external

-X??

5

Cu busbar 120mm²

L1

A

4

20.1 C

Copyright © EWS-Energietechnik 2014

All Rights Reserved

1

LOCAL STARTER PANEL (MCC) THRUST BEARING HIGH PRESSURE OlL PUMPS

4

5

6

F Main Circuits EWS14/002 7

page 10 of 30

8

Copyright © EWS-Energietechnik 2014

All Rights Reserved

1

2

3

4

5

6

7

8

A

A

P11

P12

P13

P00

P21

P22

P23

V

B

B 1

2

1

2

1

2

1

2

1

10.4 D

2

1

2

1

2

10.6 D

10.4 D

10.6 D 1

3

5

7

9

11

10.5 D

C

10.7 D

10.5 D

C

10.7 D 10.5 D

10.7 D 2

4

6

8

10

12

10.5 D

10.7 D

D

D

10.8 C

L1 10.8 C

L2 10.8 C

L3

E

E

F

San Lorenzo

ÜBERARBEITET AM

Rev.

1

19.09.2014

Matthias Schmitt

Date

Name

2

Voith Hydro 3

LOCAL STARTER PANEL (MCC) THRUST BEARING HIGH PRESSURE OlL PUMPS

4

5

6

F Volt- & Amperemeter EWS14/002 7

page 11 of 30

8

2

3

4

5

6

7

8

A

A

B

B

H07V-K 2,5² gn/gl

H07V-K 2,5² BK

L1 PE

L2

L3

480V AC DC-POWER SUPPLY

-G01

C

C

24V, 20A

24V DC +

-

13

14

H07V-K 2,5² VT

14.7 D 15.7 D 8

13.1 E

14.3 B

17.1 E 7

6

-X24

D M

14.1 E

L+

5

14.3 B 17.1 A

14.7 D 15.7 D 16.1 A

-X24

14 12

4

4

14.1 C

2

15.1 C

C 13A, 2-polig

3

14.3 B

Leitungsschutzschalter

-F24

13.1 A

13 11

2

3

1

1

D

20.4 C

20.4 C

20.4 C

Copyright © EWS-Energietechnik 2014

All Rights Reserved

1

H07V-K 2,5² VT & WH

E

E

F

San Lorenzo

ÜBERARBEITET AM

Rev.

1

19.09.2014

Matthias Schmitt

Date

Name

2

Voith Hydro 3

LOCAL STARTER PANEL (MCC) THRUST BEARING HIGH PRESSURE OlL PUMPS

4

5

6

F 24VDC Power Supply EWS14/002 7

page 12 of 30

8

Copyright © EWS-Energietechnik 2014

All Rights Reserved

1

A

2

3

4

5

6

7

8

A

2

X24

5

1

B

B

T

-B99

RF 4

-S99

24 V

RF

250 VAC

3

6

2

2

C

C

D

D -H99

-E99 PE

RITTAL LED system light, SZ 4140.840

6

E

-X24

E

CUBICLE HEATING 24V DC, 90W

F

1

F

San Lorenzo

ÜBERARBEITET AM

Rev.

CUBICLE LIGHT

19.09.2014

Matthias Schmitt

Date

Name

2

Voith Hydro 3

LOCAL STARTER PANEL (MCC) THRUST BEARING HIGH PRESSURE OlL PUMPS

4

5

6

Cubicle light and heating

EWS14/002 7

page 13 of 30

8

Copyright © EWS-Energietechnik 2014

All Rights Reserved

1

2

3

4

5

6

7

8

presostato HYDAC EDS1700

A

A

P 1

2

7

5

-S13

8

2 19.1 C Key removable in Position REMOTE

1

2

-X12

2

3

3

1

CHAVE REMOVIVEL EM POSICAO REMOTO

5

-X11

B

1

1

5

-K03

-S12

3

16.1 E

15.3 B

-X24

B

13

2

14

2

-X24

83

C

-K15

13

21

-Q01

.2 E

-K11 A

10.4 B

84

18 -K11

.4 E

4

14

74

22

4

-K15

.6 E

A1

A1

-K11

A1

-K11 A

A2

D 62

34

A1

8

-X24

.2 E

12

C

Pump Priority switch

-S06

15.1 E

61

-K10

-K15

21

-K25

.6 E

33

-S05

D

73

-K10

15

11

13

-S11

.3 E

14

22

3

A1

-K01

A2

-K10

A2

3

-P01

A2

+

-

h

A2

6

E

15.1 E

M

-X24 FAULT 17.3 B . . 18.5 C . .5 D 15.6 C .1 C

F

13

14

21 31 43

22 32 44

51 61 73 83

52 62 74 84

1

.4 C

.3 C

.4 C

16

. 19.6 C .

. . 18.5 C

13

14

21 33 43

22 34 44

.3 C . 19.6 C .

10.4 B 10.4 B 10.4 B 17.1 B 17.2 B . 18.1 C

. .5 D 15.6 C .1 C

PUMP 1 1 ON / OFF 2 3 5 13 21 31 43

4 6 14 22 32 44

10.4 B 10.4 B 10.4 B 17.1 B

.6 C . .3 D 18.2 C

13

14

21 33 43

22 34

19.09.2014

Matthias Schmitt

Date

Name

2

Voith Hydro 3

LOCAL STARTER PANEL (MCC) THRUST BEARING HIGH PRESSURE OlL PUMPS

4

5

44

.6 C

E

. .3 D 18.2 C

17.2 B . 18.1 C

San Lorenzo

ÜBERARBEITET AM

Rev.

17.3 B

PUMP 1 PRESSURE TOO LOW 15 18

OPERATION HOUR COUNTER

6

F Pump 1 control circuit EWS14/002 7

page 14 of 30

8

Copyright © EWS-Energietechnik 2014

All Rights Reserved

1

2

3

4

5

6

7

8

A

A

-S23 2 19.2 C Key removable in Position REMOTE

3

1

CHAVE REMOVIVEL EM POSICAO REMOTO

B

1

B

33

-K03

-S22

16.1 E

14.3 B 2

34

3

-X24

83

C

-K25

13

21

-Q02

.2 E

-K21 A

10.6 B

84

18 -K21

.4 E

4

14

74

14

4

-K25

.6 E

A1

A1

-K21

A1

-K21 A

A2

D 62

34

A1

8

-X24

.2 E

22

C

Pump Priority switch

-S06

14.6 E

61

-K20

-K25

13

-K15

.6 E

33

-S05

D

73

-K20

15

21

13

-S21

.3 E

14

22

3

A1

-K02

A2

-K20

A2

3

-P02

A2

+

-

h

A2

14.8 E

16.1 E

M

M

E

FAULT 17.6 B . . 18.6 C . .5 D 14.6 C .1 C

F

13

14

21 31 43

22 32 44

51 61 73 83

52 62 74 84

1

.4 C

.3 C

.4 C

16

. 19.6 C .

. . 18.6 C

13

14

21 33 43

22 34 44

.3 C . 19.6 C .

10.6 B 10.6 B 10.6 B 17.4 B 17.5 B . 18.3 C

. .5 D 14.6 C .1 C

PUMP 2 1 ON / OFF 2 3 5 13 21 31 43

4 6 14 22 32 44

10.6 B 10.6 B 10.6 B 17.4 B

.6 C . .3 D 18.4 C

13

14

21 33 43

22 34

19.09.2014

Matthias Schmitt

Date

Name

2

Voith Hydro 3

LOCAL STARTER PANEL (MCC) THRUST BEARING HIGH PRESSURE OlL PUMPS

4

5

44

.6 C

E

. .3 D 18.4 C

17.5 B . 18.3 C

San Lorenzo

ÜBERARBEITET AM

Rev.

17.6 B

PUMP 2 PRESSURE TOO LOW 15 18

OPERATION HOUR COUNTER

6

F Pump 2 control circuit EWS14/002 7

page 15 of 30

8

All Rights Reserved

1

A

2

3

4

5

6

7

8

A

4

X24

HYDAC EDS1700

B

P

43

-K04

-K07

.2 E

.5 E

Switch Point 3

Switch Point 4

11

14

12 15

44

1

-K05 .3 E

3

5

7

-X13

-X13

-X13

start aux

speed >90%

start aux

creep det.

-UA-2

-K14

-UA-1

-14-C

15

9

-X11

-X11

18

2

4

-X13

13

-K03 A

C

-K07

.7 E

external

18

C

B external

16

external

Copyright © EWS-Energietechnik 2014

6

-X11

.5 E

15

14

6

-X13

-X13 16

33

-K07 A

-K07

.6 E

D

A1

A1

B1

-K04

A1

A1

-K05

A2

A2

A2

A1

-K03 A

A2

A2

D 14

A1

-K07 A

A2

.4 E

44

A1

-K07

-K06

.1 E

34

A1

-K06

13

-K03

.5 E

15

-K03

43

-K06 A A2

A2

15.8 E

E

M PUMP REMOTE START 13

14

21 . 33 15.7 B 43 .7 D

22 34

14.7 B

44

F

M

18 16

14.7 B .1 B

1

.1 B

18 .1 C 16

15

. 15.7 B .7 D

.1 C

.8 D . . .

13

14

21 33 43

22 34 44

.8 D . . .

13

14

21 . 33 .6 D 43 .2 B

22 34

51 . 61 . 73 19.5 C 83 .

52 62 74 84

.6 C

44

.6 C .5 D

18 16

15

.5 D

19.09.2014

Matthias Schmitt

Date

Name

2

Voith Hydro 3

5

15

.5 C

18 19.4 C 16

15

E

19.4 C

.6 D .2 B . . 19.5 C .

LOCAL STARTER PANEL (MCC) THRUST BEARING HIGH PRESSURE OlL PUMPS

4

18 .5 C 16

.

San Lorenzo

ÜBERARBEITET AM

Rev.

15

6

F Auxiliary circuit EWS14/002 7

page 16 of 30

8

Copyright © EWS-Energietechnik 2014

All Rights Reserved

1

2

3

4

5

6

7

8

3

A

X24

A

3

B

3 Illimination OFF / ON

-S89

Lamp testing

-S90

SENALIZACION OFF / ON

PRUEBA LAMPARAS

4

4

13

21

13

13

21

13

-K01

-K01

-K15

-K02

-K02

-K25

14.5 E

14.5 E

14.2 E

15.5 E

15.5 E

15.2 E

C

B

14

22

14

14

22

C

14

M

-D1 PHÖNIX Contact diode module EMG 90-DIO 32M

D

1

3

2

X 1

X 1

-H11

-H12 X 2

X 1 -H15

X 2

4

5

X 1

X 1

-H21 X 2

X 1

-H22 X 2

D

6

-H25 X 2

X 2

7

E

M

X24 ON (green)

OFF (white)

FAILURE (red)

ON (green)

OFF (white)

FAILURE (red)

ACTIVADO

APAGADO

FALLA

ACTIVADO

APAGADO

FALLA

F

San Lorenzo

ÜBERARBEITET AM

Rev.

1

19.09.2014

Matthias Schmitt

Date

Name

2

Voith Hydro 3

LOCAL STARTER PANEL (MCC) THRUST BEARING HIGH PRESSURE OlL PUMPS

4

5

6

E

F Indicator lamps EWS14/002 7

page 17 of 30

8

2

3

4

5

6

7

8

A

A

B

B 1

2

3

4

5

6

7

8

9

10

11

12

-X14

43

C

1

2

3

4

-X12

43

-K01

-K10

14.5 E

-K02

14.6 E

44

43

43

-K20

15.5 E

44

43

-K15

15.6 E

44

43

44

C

-K25

14.2 E

15.2 E

44

44

13

14

P D

23

24

external

Copyright © EWS-Energietechnik 2014

All Rights Reserved

1

D

E

E

F

San Lorenzo

ÜBERARBEITET AM

Rev.

1

19.09.2014

Matthias Schmitt

Date

Name

2

Voith Hydro 3

LOCAL STARTER PANEL (MCC) THRUST BEARING HIGH PRESSURE OlL PUMPS

4

5

6

F Monitored information 1 EWS14/002 7

page 18 of 30

8

2

3

4

5

6

7

8

A

A

external

Copyright © EWS-Energietechnik 2014

All Rights Reserved

1

B

B 13

14

15

16

17

18

19

20

21

22

23

24

25

26

-X14

15

C

-S13

-S23

6

14.6 A

6

-K06 A

15.6 A 5

7

-K07

16.8 E

5

73

33

-K11 A

16.5 E

33

C

-K21 A

14.4 E

15.4 E

7 18

74

34

34

D

D

E

E

F

San Lorenzo

ÜBERARBEITET AM

Rev.

1

19.09.2014

Matthias Schmitt

Date

Name

2

Voith Hydro 3

LOCAL STARTER PANEL (MCC) THRUST BEARING HIGH PRESSURE OlL PUMPS

4

5

6

F Monitored information 2 EWS14/002 7

page 19 of 30

8

2

3

4

5

6

7

8

A

A

B

B 27

28

29

30

31

32

33

34

35

36

37

38

39

40

-X14

1

C

3

4

-X10

11

-S00

-S01

10.1 C

-S02

10.4 C

2

11

-G01

10.6 C

12

13

C

-F24

12.2 C

12

14

12.2 D

14

13

3

4 4-20 mA

P HYDAC EDS1700

external

Copyright © EWS-Energietechnik 2014

All Rights Reserved

1

presostato

D

D

E

E

F

San Lorenzo

ÜBERARBEITET AM

Rev.

1

19.09.2014

Matthias Schmitt

Date

Name

2

Voith Hydro 3

LOCAL STARTER PANEL (MCC) THRUST BEARING HIGH PRESSURE OlL PUMPS

4

5

6

F Monitored information 3 EWS14/002 7

page 20 of 30

8

2

3

4

5

6

7

8

A

A 15,00

ACTIVADO

FALLA

APAGADO 30,00

Copyright © EWS-Energietechnik 2014

All Rights Reserved

1

50,00

B

MOTOR Y BOMBA SISTEMA DE LEVANTAMIENTO B

50,00

ACTIVADO

FALLA

APAGADO

C

C

BOMBA LIDER BOMBA 1 BOMBA 2

BOMBA 1

BOMBA 1

D

D

SENALIZACION OFF / ON

RECONECER DEFECTO

PRUEBA LAMPARAS

E

E

INTERRUPTOR BOMBA 1

F

1

INTERRUPTOR BOMBA 2

San Lorenzo

ÜBERARBEITET AM

Rev.

INTERRUPTOR PRINCIPAL

19.09.2014

Matthias Schmitt

Date

Name

2

Voith Hydro 3

LOCAL STARTER PANEL (MCC) THRUST BEARING HIGH PRESSURE OlL PUMPS

4

5

6

F Name plates EWS14/002 7

page 21 of 30

8

Related Documents

Ajuste De Bomba Cp1
February 2021 0
Tesis Bomba De Vacio.pdf
January 2021 0
Bomba De Defensivos
March 2021 0
Montaje De Bomba
March 2021 0
Bomba De Cavidad Progresiva
February 2021 0

More Documents from "Cesar Quiroga"

March 2021 0
January 2021 1
Doc Corr 7 Rv
January 2021 1