ALS LUCIE OPERATION
SEPARATOR EFFICIENCY SUMMARY
Cement Mill 1 is currently running at the rate of 165tph at 3080 Blaine on OPC.
Upon the complaint of product feed have coarse mixed particles, separator efficiency was planned to conduct using tromp curve.
Three sample were taken from the separator feed, separator reject and separator product fines.
Tromp curve was drawn and following results were extracted.
Circulation load is 160% and is okay.
Bypass 31 which is higher than third generation separator shows the fine product that directly goes to reject need to be control < 10%.
Reduce Imperfection is 0.38 which is close to high efficiency separator.
Separator efficiency by tromp curve was measured again after adjustment of the separator draft and reject flow. Follow results were measured.
Circulation load is 170% and is okay.
By pass 14.3 which is very close to high efficiency separator.
The new flow and separator flow , total feed , speed and reject is considered as target for OPC at that Blaine.
SEPARATOR DESIGN
Separator
Type
Sepol SV/290/0
Diameter of rotor
2900 mm
Diameter of housing
4150 mm
Separator Air Flow
220,000 m3/h
Motor Installed
280 KW
Motor RPM
250 - 1500
Separator RPM
33 - 197
Date | 3
Lafarge | Presentation name or chapter | Confidential
Date | 4
LUCIE OPERATION ON CM1 SOFT SYSTEM
TRAINING OF OPERATION
OPERTION LOGICS
MECHANERY CONDITION
SHAKEL ….DONE
•Total feed OK
Bucket elevator drifting not OK
Data link
MURSILINE …
•Mill KW OK
•Process Bag filter and Dp ok
• RAW MILL OK
NASIR…..DONE
•BE Load OK
•Separator . Static /dynamic ok
YASER……
•MILL Sound OK
•Mill Media ..need sorting
AITHSHAM…..
•Mill inlet P OK
•Main BF ..DP prob
•BLAINE OK
•Mill Sound need calibration
•BLAINE OKv
•Weigh Feeder Gypsum FGD issues
•BLAINE OK
•Reject Air slide condition
• LOGIC ok
•• MILL Data link
LUCIE OPERATION ON CM2 SOFT SYSTEM
TRAINING OF OPERATION
OPERTION LOGICS
MECHANERY CONDITION
• LOGIC Exist ok Data link OK • MILL
SHAKEL ….DONE
•Total feed OK
Bucket elevator drifting not OK
MURSILINE …
•Mill KW OK
•Process Bag filter and Dp ok
•MILL screen soft OK
NASIR…..DONE
•BE Load OK
•Separator . Static /dynamic ok
YASER……
•MILL Sound OK
•Mill Media ..need sorting
AITHSHAM…..
•Mill inlet P OK
•Main BF ..DP prob
•BLAINE OK
•Mill Sound need calibration
•BLAINE OKv
•Weigh Feeder Gypsum FGD issues
•BLAINE OK
•Reject Air slide condition
Counter OK
LUCIE OPERATION ON RM SOFT SYSTEM
LOGIC ok
• MILL Data link ok MILL OK
TRAINING OF OPERATION
OPERTION LOGICS
MECHANERY CONDITION
SHAKEL ….DONE
•Total feed deviation
•Separator . dynamic ok
MURSILINE …
•Mill KW OK
•Mill Media ..need sorting
NASIR…..DONE
•MILL Sound OK
•Mill Sound OK
YASER……
•Mill inlet P OK
•Weigh Feeder variation high
AITHSHAM…..
•Residue control OK
Magdi
•Reject Air slide condition ok
ACTION PLAN
ACTION PLAN
Training to operators.
Develop SOP.
FGD deviation and tripping issues.
Feed deviations issues .
Frequent product change over issue in cement mill 1.
Enlist issue and get contact TC for solution.
CM1 BE drifting issues.
CM1 Dp issues
CM2 Dp issues.
LUCIE 2015 Targets AREA
2015 Target
2016 Target
2017 Target
Raw Mill
OVER ALL 25%
50%
50%
Kiln
-
Implement 2016
Implement 2016
Cooler
-
Implement 2016
Implement 2016
CM1
OVER ALL 50%
85%
85%
CM2
OVER ALL 50%
85%
85%
9