Engineering, Procurement & Construction For Production Well Pad 11/1a And Associated Gathering System Expansion At The West Qurna (phase 2) Contract Area

  • Uploaded by: Hassen Lazhar
  • 0
  • 0
  • January 2021
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Engineering, Procurement & Construction For Production Well Pad 11/1a And Associated Gathering System Expansion At The West Qurna (phase 2) Contract Area as PDF for free.

More details

  • Words: 930
  • Pages: 4
Loading documents preview...
ENGINEERING, PROCUREMENT & CONSTRUCTION FOR PRODUCTION WELL PAD 11/1A AND ASSOCIATED GATHERING SYSTEM EXPANSION AT THE WEST QURNA (PHASE 2) CONTRACT AREA

AC UPS LOAD LIST

AS-BUILT

X1

06-Sep-19

AB

AS-BUILT

ST

MH

MSELMI

R1

28-Aug-19

RLE

REDLINE

ST

MH

MSELMI

01

05-Jan-18

AFC

ST

MH

MSELMI

00

27-Nov-17

AFC

ST

MH

MSELMI

C

21-Nov-17

IFA

ST

MH

MSELMI

B

01-Nov-17

IFR

ISSUED FOR REVIEW

NIM

MH

MSELMI

A

17-Oct-17

IDC

ISSUED FOR IDC

NIM

MH

MSELMI

REV

DATE

STATUS

ISSUE PURPOSE

ISSUED BY

CHECKED BY

APPROVED BY

APPROVED FOR CONSTRUCTION APPROVED FOR CONSTRUCTION ISSUED FOR APPROVAL

COMPANY DOCUMENT ATTRIBUTES: Company Code

Contract Territory Code

Originator Code

Facility Code

System Code

Discipline

Doc Type

Sequence Number

8015

0151

EPPM

12

872

EL

LS

20001

This document is property of the COMPANY and it shall not be disclosed to third parties, or reproduced, without permission of the COMPANY.

LUKOIL MID-EAST LIMITED WEST QURNA-2 MISHRIF PROJECT AC UPS LOAD LIST Rev.: X1 COMPANY No.: 8015-0151-EPPM-12-872-EL-LS-20001 Page: 2

Status of

DOCUMENT REVISION HISTORY SHEET

REV

STATUS

DATE ISSUED

A B

IDC IFR

17-Oct-17 01-Nov-17

UPDATE / AMENDMENT DETAILS ISSUED FOR IDC ISSUED FOR REVIEW ISSUED FOR APPROVAL - THE TITLE OF THE DOCUMENT IS MODIFIED "AC UPS LOAD LIST". - ACCORDING TO COMMENT ISSUED FROM COMPANY IN THE DOCUMENT "SINGLE LINE DIAGRAM FOR AC AND DC UPS" AND COMMENTS FROM INSTRUM TEAM, NEW CONSUMERS ARE ADDED. - ITEM TAG N° : ADDED.

C

IFA

21-Nov-17

00

AFC

27-Nov-17

01

AFC

05-Jan-18

APPROVED FOR CONSTRUCTION - MODIFIED: ACCORDING TO COMMENT ISSUED FROM I&C TEAM.

R1 X1

RLE AB

28-Aug-19 06-Sep-19

RLE/ UPDATED AS PER VENDOR INFORMATION AS-BUILT

APPROVED FOR CONSTRUCTION - ACCORDING TO THE LIGHTING SPECIFICATION, THE LOAD OF EMERGNECY LIGHTING SYSTEM IS DELETED.

Uncontrolled copy, if printed or saved

AB 4

LUKOIL MID-EAST LIMITED

WEST QURNA-2 MISHRIF PROJECT AC UPS LOAD LIST 8015-0151-EPPM-12-872-EL-LS-20001 8

9

10

11

12

13

14

Connected Load

15

16

17

3

of

4

18

19

20

21

REMARK

12-430-11-DCC-001 A

DCS System & Marshalling Cabinet

S

230

1,5

1,5

1

1

0,90

0,00

1,5

0,7

0,0

0,0

0,0

0,0

C

111

12-430-11-WCC-001 A

Engineer Workstation Console

S

230

0,7

0,7

1

1

0,90

0,00

0,7

0,3

0,0

0,0

0,0

0,0

C

111

12-430-11-N/W-001 A

Network Cabinet

S

230

0,5

0,5

1

1

0,90

0,00

0,5

0,2

0,0

0,0

0,0

0,0

C

111

12-430-11-DHM-001 A

DHM BOX

S

230

0,6

0,6

1

1

0,90

0,00

0,6

0,3

0,0

0,0

0,0

0,0

C

111

12-430-11-PMS-001 A

PMS

S

230

3

3

1

1

0,90

0,00

3,0

1,5

0,0

0,0

0,0

0,0

01

111

12-430-11-FACP-001 A

FACP

S

230

1

1

1

1

0,90

0,00

1,00

0,48

0,0

0,0

0,0

0,0

ESD & FGDS System cabinet

S

230

2

2

1

1

0,90

0,00

2,0

1,0

0,0

0,0

0,0

0,0

S

230

1,5

1,5

1

1

0,90

0,00

1,50

0,73

0,0

0,0

0,0

0,0

S

230

1

1

1

1

0,90

0,00

1,00

0,48

0,0

0,0

0,0

0,0

11,8

5,7

0,0

0,0

0,0

0,0

01 01 C C C C

B

Service name

Duty

111

B

Unit

C

Rev.

kW

Item tag No.

Actual load

Emergency load

kVAR

kW

kVAR

kW

kVAR

12-430-11/1A-PDB-001 A

ESD & FGDS System cabinet -SIH 111

12-430-11-SIS-001 A

FIRE ALARM CONTROL PANEL-SUBSTATION 111

12-830-11-FACP-001 A

FACP

FIRE ALARM CONTROL PANEL-OFFICE 111

12-510-11-FACP-001 A

FACP

SUB-TOTAL

Uncontrolled copy, if printed or saved

AB

Page:

Duty Factor

7

Power Factor (cosø) @ Load Factor

6

EffEfficiency (%) @ Load Factor

5

Load Factor

4

Ratedd Output (KW)

3

BHP(kW)

2

Voltage(V)

1

Status

Schematic Type

COMPANY No.:

X1

Load Type (Feeder/Motor)

Rev.:

LUKOIL MID-EAST LIMITED

WEST QURNA-2 MISHRIF PROJECT AC UPS LOAD LIST

9

10

11

12

13

14

Connected Load

15

16

17

Page:

4

of

4

18

19

20

21

111

12-430-11-DCC-001 B

DCS System & Marshalling Cabinet

C

230

1,5

1,5

1

1

0,90

1,00

1,5

0,7

1,5

0,7

0,0

0,0

C

111

12-430-11-WCC-001 B

Engineer Workstation Console

C

230

0,7

0,7

1

1

0,90

1,00

0,7

0,3

0,7

0,3

0,0

0,0

C

111

12-430-11-N/W-001 B

Network Cabinet

C

230

0,5

0,5

1

1

0,90

1,00

0,5

0,2

0,5

0,2

0,0

0,0

C

111

12-430-11-DHM-001 B

DHM BOX

C

230

0,6

0,6

1

1

0,90

1,00

0,6

0,3

0,6

0,3

0,0

0,0

C

111

12-430-11-PMS-001 B

PMS

C

230

3

3

1

1

0,90

1,00

3,0

1,5

3,0

1,5

0,0

0,0

01

111

12-430-11-FACP-001 B

FACP

C

230

1

1

1

1

0,90

1,00

1,00

0,48

1,0

0,5

0,0

0,0

ESD & FGDS System cabinet

C

230

2

2

1

1

0,90

1,00

2,0

1,0

2,0

1,0

0,0

0,0

C

230

1,5

1,5

1

1

0,90

1,00

1,50

0,73

1,5

0,7

0,0

0,0

01 01 C C C

Service name

Actual load

Emergency load

kVAR

kW

kVAR

kW

kVAR

12-430-11/1A-PDB-001 B

ESD & FGDS System cabinet -SIH 111

12-430-11-SIS-001 B

FIRE ALARM CONTROL PANEL-SUBSTATION 111

12-830-11-FACP-001 B

FACP

FIRE ALARM CONTROL PANEL-OFFICE

C

111

C

MPFS

C

111

B

Item tag No.

Duty

C

B

Unit

kW

Rev.

Duty Factor

8

Power Factor (cosø) @ Load Factor

7

EffEfficiency (%) @ Load Factor

6

Load Factor

5

Ratedd Output (KW)

4

12-510-11-FACP-001 B

FACP

C

230

1

1

1

1

0,90

1,00

1,00

0,48

1,0

0,5

0,0

0,0

12-111-00-PK-010

MPFS

C

230

1,5

1,5

1

1

0,90

1,00

1,50

0,73

1,5

0,7

0,0

0,0

13,3

6,4

13,3

6,4

0,0

0,0

SUB-TOTAL

Uncontrolled copy, if printed or saved

AB

Remarks

8015-0151-EPPM-12-872-EL-LS-20001 3

BHP(kW)

2

Voltage(V)

1

Status

Schematic Type

COMPANY No.:

X1

Load Type (Feeder/Motor)

Rev.:

Related Documents


More Documents from "hapinefe"