Item: HORMIGON CICLOPEO H18 60% P.D.
Nº P. A 1 2 3 4 5 6 7 8 D B 1 2 -
1
> >
F G C -
Insumo/Parámetro MATERIAL CEMENTO PORTLAND ARENA COMUN GRAVA COMUN PIEDRA BRUTA MADERA DE CONSTRUCCION CLAVOS ALAMBRE DE AMARRE AGUA TOTAL MATERIALES OBRERO ALBAÑIL AYUDANTE
Beneficios Sociales TOTAL MANO DE OBRA EQUIPO MEZCLADORA
61.27 m³ Fecha: 17/sep/2019 Und.
Cant.
KG M3 M3 m³ PIE2 KG KG LTS
Unit. (Bs) 120.00 0.24 0.32 0.60 15.00 0.50 0.50 120.00
0.92 90.00 90.00 60.00 9.00 15.00 15.00 0.03
110.40 21.60 28.80 36.00 135.00 7.50 7.50 3.60 350.40
17.50 12.50
87.50 62.50
(A) = HR HR
5.00 5.00
0% de
hr
(B) = (B+F) = 0.20
Parcial (Bs)
0.00 150.00 70.00
14.00
H Herramientas menores I TOTAL HERRAMIENTAS Y EQUIPO J SUB TOTAL
0% de
(B) = (C+H) = (D+G+I) =
0.00 14.00 514.40
L M N O P Q
0.00% de 0.00% de
(J) = (J) = (J+L+M) = (N) = (N) = (N+O+P) =
0.00 0.00 514.40 0.00 0.00 514.40 514.40
Gastos Generales Utilidad PARCIAL IVA IT TOTAL ITEM PRECIO ADOPTADO:
0% de 0% de