Liquidación De Obra Por Administración Directa

  • Uploaded by: Luis Padilla
  • 0
  • 0
  • February 2021
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Liquidación De Obra Por Administración Directa as PDF for free.

More details

  • Words: 6,880
  • Pages: 36
Loading documents preview...
LIQUIDACIÓN TECNICA DE OBRA POR ADMINISTRACIÓN DIRECTA

OBRA:

MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO 2011

1

CONTENIDO 1.

GENERALIDADES

2.

OBJETIVOS

3.

LIQUIDACION TECNICA

4.

3.1.

DESCRIPCION GENERAL DEL PROYECTO

3.2.

REVISION DEL EXPEDIENTE TECNICO

3.3.

VERIFICACION DE LOS TRABAJOS EJECUTADOS

3.4.

VERIFICACION DE VALORIZACIONES

3.5.

VERIFICACION DE LOS PAGOS EFECTUADOS

3.6.

ANALISIS DE COSTOS Y GASTOS REALIZADOS

3.7.

PRESUPUESTO ANALITICO DE OBRA

3.8.

COMENTARIO TECNICO.

LIQUIDACION FINANCIERA 4.1.

DE LA DOCUMENTACION VERIFICADA

4.2.

RECURSOS FINANCIEROS

4.3.

REVISION Y VERIFICACION DEL ASPECTO TRIBUTARIOS

5.

CONCILIACION DEL INFORME TECNICO CONTABLE

6.

CONCILIACION DEL INFORME TECNICO CONTABLE, PRESUPUESTADO

2

INFORME FINAL DE LA LIQUIDACION FINAL DE OBRA 1. ANTECEDENTES 2. DE LA LIQUIDACION DE OBRA 2.1.

DE LA LIQUIDACION TECNICA

2.2.

DE LA LIQUIDACION FINANCIERA

3. CONCLUSIONES 4. RECOMENDACIONES ANEXOS: CUADRO N° 01 VALORIZACIÓN FINAL DE OBRA ANEXO 1: HOJA DE METRADOS ANEXO 2: PRESUPUESTOS COMPARATIVOS O VALORIZACION FINAL ANEXO 3: CUADRO COMPARATIVO DE METRADOS ANEXO 4: RELACION DE GASTOS POR PARTIDAS ANEXO 5: FOTOSTATICA DE COMPROBANTES DE PAGO PANEL FOTOGRAFICO DE OBRAS: PLANO DE REPLANTEO COPIA DE CPs CUADERNODE OBRA DOCUMENTACION LEGAL

3

LIQUIDACION DE OBRA “MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO SANTA BARBARA DE CARHUACAYAN” 1.

GENERALIDADES

La obra ejecutada por la modalidad de administración directa, bajo la modalidad de Ejecución de Transferencia Financiera , entre el Gobierno Central (MEF-FONIPREL) y la Municipalidad Distrital de Santa Bárbara de Carhuacayan según Convenio suscrito N° 0027-2008-GR-JUNIN-CGR. 2.

OBJETIVOS

Determinar el Costo Final de la Obra, Definir las características técnicas con que se ha ejecutado la obra para su registro y control patrimonial (Liquidación Técnica). 3. LIQUIDACION TECNICA 3.1

Descripción General del Proyecto

PLIEGO PRESUPUESTA

: Municipalidad de Santa Bárbara de Carhuacayan

FUNCION

: 16

PROGRAMA

: 052

SUBPROGRAMA

: 0145

PROYECTO

:“MEJORAMIENTO SISTEMA

DE

Y

AMPLIACION

AGUA

POTABLE

DEL Y

4

ALCANTARILLADO

SANTA

BARBARA

DE

CARHUACAYAN”. UBICACION

: Santa Bárbara de Carhuacayan.

FINANCIAMIENTO

: GOBIERNO CENTRAL (MEF)

ENTIDAD EJECTORA

: Municipalidad

de

Santa

Bárbara

de

Carhuacayan AREA ENCARGADA

: Gerencia de Obras MDSBC

PRESUPUESTO BASE DE OBRA

: S/. 2’900,000.00

PRESUPUESTO EJECUTADO

: S/.

MODALIDAD DE EJECUCION

: Administración directa.

2’881,715.75

FECHA ENTREGA DE TERRENO : 14 de Mayo del 2008 FECHA DE INICIO DE OBRA

: 15 de Mayo del 2008

PLAZO EJECUCION DE OBRA

: 18 Meses

FECHA DE TÉRMINO DE OBRA : 30 de Setiembre del 2011 AMPLIACION DE PLAZO

: 02 Meses

TERMINO REAL DE OBRA

: 30 de Setiembre del 2011

AVANCE FISICO DE OBRA

: 118.16 %

AVANCE FIANCIERO

: 102.50 %

RESIDENTE DE OBRA

: Ing. Manuel Ramos Laura

SUPERVISOR DE OBRA

: Ing. Civil Víctor Arzapalo

ASIST.DE SUPERVISION

: ING. FREDY YARLEQUE CATILLO

ALMACENERO DE OBRA

: PABLO SOTO LIZARRAGA

ADMINISTRADOR DE OBRA

: ISAAC PALPA CAPARACHIN

BASE LEGAL •

Constitución Política del Perú.



Ley N° 27444 Ley Procedimiento Administrativo General



Ley N° 28441 – Ley General del Sistema Nacional de Presupuesto



Ley Anual del Presupuesto del sector Publico del 2009.

5



Directiva de Programación y formulación Presupuestal del 2009



Ley N° 27842 Ley del Marco de la Modernidad de la Gestión del Estado.



Ley N° 27783, Ley de Bases de la Descentralización.



Ley N° 27972, Ley Orgánica de Municipalidades.



Ley N° 27293, Ley del Sistema Nacional de Inversión Publica.



Normas

que

regulan

la

Ejecución

de

obras

Públicas

por

Administración Directa, Resolución de Contraloría No 195-88 C.G. •

Reglamento Nacional de Construcciones.



Reglamento de Metrado de Obras de Edificación.



Resolución de contraloría No 172-99-CG Normas de Control Interno para el desarrollo de Obras Publicas.

3.2

Revisión del Expediente Técnico a) Alcances del Proyecto Base Programado y Aprobado: DEL EXPEDIENTE TECNICO: El Proyecto fue elaborado

por el Consultor Ing. Civil Victor

Arzapalo con CIP Nro 54274 y evaluado por el Ing. Civil Eduardo Percy Rojas Salva con Cip Nro 67652 de parte del Gobierno Regional de Junín. El

Presente

Expediente

Técnico

Fue

Aprobado

Mediante

Resolución de Alcaldía Nro. xxxx-2008-MDSDA. El Proyecto comprende la Ejecución de la Obra en su totalidad que contempla: “MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO”.

6

Comprende en la construcción de obras de arte como la captación de concreto armado, incluido el cerco perimétrico con alambre de púas. Construcción de 19 alcantarillas Tipo I TMC de 36 pulgadas de diámetro, Construcción de 05 alcantarillas Tipo II de Concreto Armado,Construcción de 03 badenes de 10.00 x 5.00 mts. de mampostería y concreto ciclópeo. Construcción de 01 pontón de L= 10.00 metros de luz, sobre la quebrada Huayo, mt.,

con

un

cuyas características son: losa de 10.60x4.00

espesor

de

0.65

mts,

vigas

de

borde

de

0.35m.x0.95mts., concreto armado de fc=210 kg/cm2, estribo de concreto ciclópeo, con parapetos armado, aleros de concreto ciclópeo, barandas metálicas, sardineles de 0.35x0.30, entre otros. Construcción de 01 puente, de L=25.00 metros, con losa armada de 0.25 mts. de espesor, de concreto armado de fc=210 kg/cm2, vigas de 1.50x0.60 mt., diafragmas de 1.30x0.25, estribos de concreto

armado,

aleros

de

concreto

armado,

barandas

metálicas, sardineles de 0.25x0.15, veredas de 0.75 ml. De ancho. Conformación de cunetas de forma de triangular de 0.75x0.30 mt. en 30,980 ml., ubicado según la necesidad del proyecto. DE LA COMPATIBILIDAD DEL EXPEDIENTE TECNICO: Con fecha del 15 de Mayo del 2008 se realizo el informe de Compactibilidad del Proyecto con observaciones de parte del Supervisión de Obra y Residente de Obra, en el cual hacen saber que el proyecto en mención tiene observaciones con respecto a la dosificación del concreto usado en la Superestructura , Asi

7

mismo que los costos están desactualizados y que los volúmenes considerados en la partida de Explanaciones no están acorde al trazo realizado según el Expediente Técnico , el cual sugieren notificar al Proyectista para su respectivo pronunciamiento y levantamiento de observaciones indicados . DE LA REDUCCION DE METAS DEL EXPEDIENTE TECNICO: Con fecha del 06 de Diciembre del 2008 se Emitió una Resolución de Alcaldía aprobando la Reducción de Metas de Longitud de Kilometraje de 15+500 km a 12+180 , así mismo la realización de Trabajos Adiciones no consideradas en el Expediente y La aprobación de la Ejecución de Obras de Arte sin que se modifique el Presupuesto Base Aprobado ,en merito al Informe N° 062/2008/MDSDA/GDUR/CJLCH-TCRSA emitido por la Gerencia de Desarrollo Urbano Rural – MDSDA y Carta N° 010-JGCB/SECTCRSAA-MDA. En la cual se indican que se está variando el trazo en la mas optima y evitar pasar por terrenos agrícolas (Cañaverales, Maíz, Menestras, Cereales, etc.) y mejorando las pendientes entre 4 % y 7 % sin modificar la meta prevista final ( Ponto de 10 ml , paraje quebrada Huayo) También se indican el incremento de volúmenes en roca suelta y roca dura no consideradas en el Expediente Técnico y es necesario su ejecución para llegar a la meta prevista según el Expediente Técnico Aprobado en esta primera Etapa. b) Presupuesto Base:

8

Se esta considerando un presupuesto base con información del Expediente Técnico Aprobado: Presupuesto Base:

COSTO DIRECTO GASTOS GENERALES 14.00% SUB TOTAL GASTOS DE SUPERVISION 10% COSTO TOTAL PRESUPUESTO

S/. 2,298,018.94 S/. 321,722.65 S/. 2,619,741.59 S/. 261,974.16 S/. 2,881,715.75

Presupuesto Ejecutado:

COSTO DIRECTO GASTOS GENERALES SUB TOTAL GASTOS DE SUPERVISION COSTO TOTAL PRESUPUESTO

3.3.

S/. 2,420,590.89 S/. 302,041.84 S/. 2,722,632.73 S/. 231,212.72 S/. 2,953,845.45

Verificación de los Trabajos efectuados Se verifico in situ la Obra a) Cumplimiento de Metas, Visita a la Obra: Con respecto a las Metas Ejecutadas se han cumplido las metas previstas de la siguiente manera: 1. Metas Previstas según el Expediente Técnico se ejecuto en un 83.79 % 2. Metas Previstas en Mayores Metrados se ejecuto en un 32.20 % en referencia al Presupuesto asignado por el Expediente Técnico Aprobado.

9

3. Metas Previstas no Consideradas se ejecuto en un 2.47 % en referencia al Presupuesto asignado por el Expediente Técnico Aprobado. A lo descrito se consolida que las metas ejecutadas en el presente proyecto ha llegado a ejecutarse

un 118.16 % de los trabajos

previstos según el Expediente Técnico aprobado, así mismo se han ejecutados

trabajos

de

mayores

Metrados

y

partidas

no

consideradas en el Expediente Técnico por ser indispensable su ejecución para llegar a la meta prevista, se adjunta cuadros de las metas previstas indicadas líneas arribas: CUADRO DE METAS PREVISTAS SEGÚN EL EXPEDIENTE TECNICO: METRADOS PARTIDA

DESCRIPCION

01.00.00

OBRAS PROVICIONALES CARTEL DE IDENTIFICACION DE LA OBRA DE 7.20 x 5.4 M. CAMPAMENTO PROVICIONAL DE OBRA MOVILIZACION Y DESMOVILIZACION DE EQUIPOS

01.01.00 01.02.00 01.03.00 02.00.00 02.01.00 02.02.00 03.00.00 03.01.00 03.02.00 03.03.00 03.04.00 03.05.00

TRABAJOS PRELIMINARES TRAZO Y REPLANTEO LIMPIEZA, DEFORESTACION Y DESTRONQUE EXPLANACIONES CORTE DE MATERIAL SUELTO CORTE EN ROCA SUELTA CORTE ROCA FIJA CONFORMACION DE TERRAPLEN EN RELLENO ESCARIFICADO, PERFILADO Y COMPACTADO DE SUB RASANTE

05.00.00

OBRAS DE ARTE Y DRENAJE

05.01.00

ALCANTARILLA TIPO I TRAZO Y REPLANTEO EN OBRAS DE ARTE EXCAVACION P/ ESTRUCTURAS (Manual) RELLENO PARA ESTRUCTURA CON MATERIALDE PRESTAMO

05.01.01 05.01.02 05.01.03

UN

METRADO

METRADO EJECUTADO

% EJECUTADO

%X EJECUTAR

UND

1.00

1.00

100.00

0.00

GLB

1.00

1.00

100.00

0.00

GLB

1.00

0.23

22.64

77.36

KM

15.50

11.78

76.00

0.00

HA

9.60

9.60

100.00

0.00

M3 M3 M3

319,960.16 7,653.66 1,029.79

232,762.95 7,653.66 1,029.79

72.75 100.00 100.00

27.25 0.00 0.00

M3

11,897.33

11,897.33

100.00

0.00

M2

51,957.00

39,608.00

76.23

23.77

M2

309.89

284.26

91.73

8.27

M3

450.41

410.97

91.24

8.76

M3

124.85

124.85

100.00

0.00

10

05.01.04 05.01.05 05.01.06 05.01.07 05.01.08 05.01.09 05.02.00 05.02.01 05.02.02 05.02.03 05.02.04 05.02.05 05.02.06 05.02.09 05.03.00 05.03.01 05.03.02 05.03.03 05.03.04 05.03.05 05.04.00 05.04.01 05.04.02 05.04.03 06.00.00 06.01.00 06.01.01 06.01.02 06.02.00 06.02.01 06.02.02 06.02.03 06.02.04 06.03.00 06.03.01 06.04.00 06.04.01 06.04.02 06.04.03

EMBOQUILLADO CON PIEDRA CONCRETO F´C=100KG/CM2, PARA SOLADO E=4" - SUBESTRUCTURA ENCOFRADO Y DESENCOFRADO CONCRETO F´C= 175 KG/CM2 ACERO Fy=4,200 KG/CM2 ALCANTARILLA TMC D=36" C=12 ALCANTARILLA TIPO II TRAZO Y REPLANTEO EN OBRAS DE ARTE EXCAVACION P/ ESTRUCTURAS (Manual) EMBOQUILLADO CON PIEDRA CONCRETO F´C=100KG/CM2, PARA SOLADO E=4" - SUBESTRUCTURA ENCOFRADO Y DESENCOFRADO CONCRETO F'C=210 KG/CM2. ACERO Fy=4,200 KG/CM2 BADENES TRAZO Y REPLANTEO EN OBRAS DE ARTE EXCAVACION P/ ESTRUCTURAS (Manual) ENCOFRADO Y DESENCOFRADO CONCRETO CICLOPEO F'C=210 KG/CM2. + 30% P.M. EMBOQUILLADO CON PIEDRA CUNETAS CONFORMACION DE CUNETAS EN TIERRA CONFORMACION DE CUNETA EN ROCA SUELTA CONFORMACION DE CUNETA EN ROCA FIJA PUENTE DE C°A° DE 25.00 M. LUZ TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO P/CONSTRUCCION DE PUENTE TRAZO Y REPLANTEO EN OBRAS DE ARTE MOVIMIENTO DE TIERRAS EXCAVACION EN SECO CON MAQUINARIA EXCAVACION EN ROCA FIJA RELLENO PARA ESTRUCTURA CON MATERIALDE PRESTAMO ELIMINACION DE MATERIAL EXCEDENTE OBRAS DE CONCRETO SIMPLE CONCRETO F´C=100KG/CM2, PARA SOLADO E=4" - SUBESTRUCTURA SUB ESTRUCTURA CONCRETO F'C=210 KG/CM2. P/ZAPATAS CONCRETO F'C=210 KG/CM2. P/ CUERPO ESTRIBOS Y ALEROS ENCOFRADO Y DESENCOFRADO

M3

11.47

9.66

84.22

15.78

M2

160.55

135.20

84.21

15.79

M2 M3 KG M

427.96 73.41 1,867.13 83.60

360.39 61.82 1,572.32 83.60

84.21 84.21 84.21 100.00

15.79 15.79 15.79 0.00

M2

89.40

0.00

0.00

100.00

M3

126.92

0.00

0.00

100.00

M3

7.22

0.00

0.00

100.00

M2

28.00

0.00

0.00

100.00

M2 M3 KG

134.28 47.42 1,428.91

0.00 0.00 0.00

0.00 0.00 0.00

100.00 100.00 100.00

M2

150.00

150.00

100.00

0.00

M3

66.89

66.89

100.00

0.00

M2

63.00

63.00

100.00

0.00

M3

66.89

66.89

100.00

0.00

M3

24.00

24.00

100.00

0.00

M

29,740.00

8,610.00

28.95

71.05

M

1,080.00

1,080.00

100.00

0.00

M

160.00

160.00

100.00

0.00

M2

542.50

542.50

100.00

0.00

M2

542.50

542.50

100.00

0.00

M3

729.38

729.38

100.00

0.00

M3

68.63

68.63

100.00

0.00

M3

317.83

317.83

100.00

0.00

M3

1,037.41

1,037.41

100.00

0.00

M2

126.12

126.12

100.00

0.00

M3

171.12

171.12

100.00

0.00

M3

104.04

104.04

100.00

0.00

M2

361.82

361.82

100.00

0.00

11

06.04.04

06.05.00 06.05.01 06.05.02

06.06.00 06.06.01

06.07.00 06.07.01 06.07.02

06.08.00 06.08.01 06.08.02

06.09.00 06.09.01 06.09.02 06.10.00 06.10.01 06.10.02 06.11.00 06.11.01 06.11.02 06.11.03 07.00.00 07.01.00 07.01.01 07.01.02 07.02.00 07.02.01 07.02.02 07.02.03

(ZAPATAS, ESTRIBOS Y ALEROS) ACERO Fy=4,200 KG/CM2. P/SUB ESTRUCTURAS ACCESORIOS DE SUB ESTRUCTURA SUB DREN DE SUB PRESION - SUB ESTRUCTURA RELLENO CON MATERIAL GRANULAR PARA SUB DREN - SUB ESTRUCTURA SUPER ESTRUCTURA FALSO PUENTE DE SUPER ESTRUCTURA VIGAS PRINCIPALES (SUPER ESTRUCTURA) CONCRETO F'C=210 KG/CM2. P/ VIGAS SUPER ESTRUCTURA ACERO Fy=4,200 KG/CM2. P/VIGAS SUPER ESTRUCTURAS DIAFRAGMAS (SUPER ESTRUCTURA) CONCRETO F'C=210 KG/CM2. P/DIAFRAGMAS-SUPER ESTRUCTURA ACERO Fy=4,200 KG/CM2. P/DIAFRAGMAS-SUPER ESTRUCTURAS LOSA (SUPER ESTRUCTURA) CONCRETO F'C=210 KG/CM2. P/ LOSA -SUPER ESTRUCTURA ACERO Fy=4,200 KG/CM2. P/LOSASUPER ESTRUCTURAS APOYOS EN EXTREMOS DE VIGAS APOYO FIJO APOYO MOVIL ACCESORIOS DE SUPER ESTRUCTURA JUNTA DE DILATACION CONTRACCION METALICA - SUPER ESTRUCTURA TUBERIA DE DRENAJE PVC SAP D=3" - SUPER ESTRUCTURA BARANDA DE Fº Gº DE 2 1/2" + PERF. ACERO PONTON L=10.00 M. DE LUZ TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO P/CONSTRUCCION DE PUENTE TRAZO Y REPLANTEO EN OBRAS DE ARTE MOVIMIENTO DE TIERRAS EXCAVACION EN SECO CON MAQUINARIA EXCAVACION DE MATERIAL BAJO AGUA CON MAQUINARIA RELLENO PARA ESTRUCTURA CON MATERIAL DE PRESTAMO

KG

19,083.95

19,083.95

100.00

0.00

UND

2.00

2.00

100.00

0.00

M3

3.23

3.23

100.00

0.00

M

25.00

25.00

100.00

0.00

M3

46.62

46.62

100.00

0.00

KG

1,014.50

1,014.50

100.00

0.00

M3

3.51

3.51

100.00

0.00

KG

698.92

698.92

100.00

0.00

M3

33.98

33.98

100.00

0.00

KG

3,283.76

3,283.76

100.00

0.00

UND UND

2.00 2.00

2.00 2.00

100.00 100.00

0.00 0.00

M

8.00

8.00

100.00

0.00

M

3.00

3.00

100.00

0.00

M

51.80

51.80

100.00

0.00

M2

252.00

252.00

100.00

0.00

M2

252.00

252.00

100.00

0.00

M3

231.59

231.59

100.00

0.00

M3

207.64

207.64

100.00

0.00

M3

122.93

122.93

100.00

0.00

12

07.03.00 07.03.01 07.04.00 07.04.01 07.04.02 07.04.03 07.04.04

07.05.00 07.05.01 07.05.02

07.06.00 07.06.01 07.07.00 07.07.01 07.07.02

07.08.00 07.08.01 07.08.02

07.09.00 07.09.01 07.09.02 07.09.03

OBRAS DE CONCRETO SIMPLE CONCRETO F´C=100KG/CM2, PARA SOLADO E=4" - SUBESTRUCTURA SUB ESTRUCTURA CONCRETO F´C= 175 KG/CM2 + 30 % P.G. - (ZAPATAS, ESTRIBOS Y ALEROS) CONCRETO F'C=210 KG/CM2. PARAPETO ENCOFRADO Y DESENCOFRADO (ZAPATAS, ESTRIBOS Y ALEROS) ACERO Fy=4,200 KG/CM2, PARAPETO ACCESORIOS DE SUB ESTRUCTURA SUB DREN DE SUB PRESION - SUB ESTRUCTURA (PONTON) RELLENO CON MATERIAL GRANULAR PARA SUB DREN - SUB ESTRUCTURA SUPER ESTRUCTURA FALSO PUENTE DE SUPER ESTRUCTURA (PONTON) LOSAS, VIGAS Y SARDINEL CONCRETO F'C=210 KG/CM2. P/ SUPER ESTRUCTURA ACERO Fy=4,200 KG/CM2. P/LOSASUPER ESTRUCTURAS APOYOS EN LOS EXTREMOS DE LA LOSA APOYO FIJO DE NEOPRENE 0.30 CM x 1" APOYO MOVIL DE NEOPRENE 0.30 CM x 1 " ACCESORIOS DE SUPER ESTRUCTURA JUNTA DE DILATACION CONTRACCION METALICA - SUPER ESTRUCTURA (PONTON) TUBERIA DE DRENAJE PVC SAP D=3" - SUPER ESTRUCTURA BARANDA DE Fº Gº DE 2 1/2" + PERF. ACERO

M2

79.86

79.86

100.00

0.00

M3

226.60

226.60

100.00

0.00

M3

16.48

16.48

100.00

0.00

M2

258.72

258.72

100.00

0.00

KG

458.82

458.82

100.00

0.00

UND

2.00

2.00

100.00

0.00

M3

2.74

2.74

100.00

0.00

M

10.00

10.00

100.00

0.00

M3

35.21

35.21

100.00

0.00

KG

3,503.96

3,503.96

100.00

0.00

M

4.70

4.70

100.00

0.00

M

4.70

4.70

100.00

0.00

M

8.00

8.00

100.00

0.00

M

7.50

7.50

100.00

0.00

M

21.20

21.20

100.00

0.00

M3

0.90

0.90

100.00

0.00

M3

0.77

0.77

100.00

0.00

07.10.03 07.10.04

SEÑALIZACION Y SEGURIDAD VIAL EXCAVACION MANUAL (SEÑAL INFORMATIVA) CONCRETO F´C= 140 KG/CM2 + 30 % P.G. - (SEÑAL INFORMATIVA) SEÑAL INFORMATIVA HITOS KILOMETRICOS

UND UND

4.00 36.00

2.00 0.00

50.00 0.00

50.00 100.00

09.00.00 09.01.00

FLETE TERRESTRE FLETE TERRESTRE

GLB

1.00

1.00

100.00

0.00

07.10.00 07.10.01 07.10.02

CUADRO DE METAS DE MAYORES METRADOS: PARTIDA

DESCRIPCION

METRADOS

13

03.00.00 03.02.00 03.03.00 03.04.00

CORTE ROCA SUELTA CORTE ROCA FIJA CONFORMACION DE TERRAPLEN EN RELLENO OBRAS DE ARTE Y DRENAJE ALCANTARILLA TIPO I

05.03.00

BADENES TRAZO Y REPLANTEO EN OBRAS DE ARTE EXCAVACION P/ ESTRUCTURAS (Manual) ENCOFRADO Y DESENCOFRADO CONCRETO CICLOPEO F'C=210 KG/CM2. + 30% P.M. EMBOQUILLADO CON PIEDRA

05.03.02 05.03.03 05.03.04 05.03.05 05.04.00 05.04.02 05.04.03

09.00.00 09.01.00

METRADO

METRADO EJECUTADO

% EJECUTADO

%X EJECUTAR

M3 M3

7,497.64 25,682.93

7,497.64 25,682.93

100.00 100.00

0.00 0.00

M3

2,594.32

2,594.32

100.00

0.00

M

12.40

12.40

100.00

0.00

M2

74.26

74.26

100.00

0.00

M3

29.57

29.57

100.00

0.00

M2

21.70

21.70

100.00

0.00

M3

21.26

21.26

100.00

0.00

M3

5.28

5.28

100.00

0.00

M

460.00

460.00

100.00

0.00

M

1,400.00

1,400.00

100.00

0.00

1.00

1.00

100.00

0.00

EXPLANACIONES

05.00.00 05.01.00 05.01.09

05.03.01

UN

ALCANTARILLA TMC D=36" C=12

CUNETAS CONFORMACION DE CUNETA EN ROCA SUELTA CONFORMACION DE CUNETA EN ROCA FIJA

FLETE TERRESTRE FLETE TERRESTRE

GLB

CUADRO DE METAS DE PARTIDAS NO CONSIDERADAS: METRADOS PARTIDA

DESCRIPCION

10.00.00

OTROS PARTIDAS

10.01.00

MURO SECO

10.01.01

EXCAVACION PARA MURO SECO ACOPIO DE PIEDRA PARA MURO SECO ACOMODO Y ACARREO DE PIEDRA PARA MURO SECO

10.01.02 10.01.03

UN

METRADO

METRADO EJECUTADO

% EJECUTADO

%X EJECUTAR

M3

1,637.76

1,637.76

100.00

0.00

M3

1,290.37

1,290.37

100.00

0.00

M3

1,290.37

1,290.37

100.00

0.00

b) Verificación de Metrados Ejecutados con Metrados Base: Se está cuantificando los Metrados ejecutados con los Metrados base, el cual se puede determinar que en algunas partidas no se

14

han ejecutado al 100 % y en otras partidas se han ejecutado mayores Metrados por ser indispensable su ejecución para llegar a la meta prevista adjunta el cuadro ha cuantificado los Metrados ejecutados con los Metrados bases, Metrados Ejecutados de partidas no consideradas.

METRADOS PARTIDA

DESCRIPCION

01.00.00

OBRAS PROVICIONALES CARTEL DE IDENTIFICACION DE LA OBRA DE 7.20 x 5.4 M. CAMPAMENTO PROVICIONAL DE OBRA MOVILIZACION Y DESMOVILIZACION DE EQUIPOS

01.01.00 01.02.00 01.03.00 02.00.00 02.01.00 02.02.00 03.00.00 03.01.00 03.02.00 03.03.00 03.04.00 03.05.00

TRABAJOS PRELIMINARES TRAZO Y REPLANTEO LIMPIEZA, DEFORESTACION Y DESTRONQUE EXPLANACIONES CORTE DE MATERIAL SUELTO CORTE EN ROCA SUELTA CORTE ROCA FIJA CONFORMACION DE TERRAPLEN EN RELLENO ESCARIFICADO, PERFILADO Y COMPACTADO DE SUB RASANTE

05.00.00

OBRAS DE ARTE Y DRENAJE

05.01.00

ALCANTARILLA TIPO I TRAZO Y REPLANTEO EN OBRAS DE ARTE EXCAVACION P/ ESTRUCTURAS (Manual) RELLENO PARA ESTRUCTURA CON MATERIALDE PRESTAMO EMBOQUILLADO CON PIEDRA CONCRETO F´C=100KG/CM2, PARA SOLADO E=4" - SUBESTRUCTURA ENCOFRADO Y DESENCOFRADO CONCRETO F´C= 175 KG/CM2 ACERO Fy=4,200 KG/CM2 ALCANTARILLA TMC D=36" C=12

05.01.01 05.01.02 05.01.03 05.01.04 05.01.05 05.01.06 05.01.07 05.01.08 05.01.09 05.02.00 05.02.01 05.02.02 05.02.03 05.02.04 05.02.05

ALCANTARILLA TIPO II TRAZO Y REPLANTEO EN OBRAS DE ARTE EXCAVACION P/ ESTRUCTURAS (Manual) EMBOQUILLADO CON PIEDRA CONCRETO F´C=100KG/CM2, PARA SOLADO E=4" - SUBESTRUCTURA ENCOFRADO Y DESENCOFRADO

UN

METRADO BASE

METRADO EJECUTADO

% EJECUTADO

%X EJECUTAR

UND

1.00

1.00

100.00

0.00

GLB

1.00

1.00

100.00

0.00

GLB

1.00

0.23

22.64

77.36

KM

15.50

11.78

76.00

24.00

HA

9.60

9.60

100.00

0.00

M3 M3 M3

319,960.16 7,653.66 1,029.79

232,762.95 15,151.30 26,712.72

72.75 197.96 2,594.00

27.25 0.00 0.00

M3

11,897.33

14,491.65

121.81

0.00

M2

51,957.00

39,608.00

76.23

23.77

M2

309.89

284.26

91.73

8.27

M3

450.41

410.97

91.24

8.76

M3

124.85

124.85

100.00

0.00

M3

11.47

9.66

84.22

15.78

M2

160.55

135.20

84.21

15.79

M2 M3 KG M

427.96 73.41 1,867.13 83.60

360.39 61.82 1,572.32 96.00

84.21 84.21 84.21 114.83

15.79 15.79 15.79 0.00

M2

89.40

0.00

0.00

100.00

M3

126.92

0.00

0.00

100.00

M3

7.22

0.00

0.00

100.00

M2

28.00

0.00

0.00

100.00

M2

134.28

0.00

0.00

100.00

15

05.02.06 05.02.09

CONCRETO F'C=210 KG/CM2. ACERO Fy=4,200 KG/CM2

05.03.00

BADENES TRAZO Y REPLANTEO EN OBRAS DE ARTE EXCAVACION P/ ESTRUCTURAS (Manual) ENCOFRADO Y DESENCOFRADO CONCRETO CICLOPEO F'C=210 KG/CM2. + 30% P.M. EMBOQUILLADO CON PIEDRA

05.03.01 05.03.02 05.03.03 05.03.04 05.03.05 05.04.00 05.04.01 05.04.02 05.04.03 06.00.00 06.01.00 06.01.01 06.01.02 06.02.00 06.02.01 06.02.02 06.02.03 06.02.04 06.03.00 06.03.01 06.04.00 06.04.01 06.04.02 06.04.03 06.04.04 06.05.00 06.05.01 06.05.02

06.06.00 06.06.01

06.07.00 06.07.01

CUNETAS CONFORMACION DE CUNETAS EN TIERRA CONFORMACION DE CUNETA EN ROCA SUELTA CONFORMACION DE CUNETA EN ROCA FIJA PUENTE DE C°A° DE 25.00 M. LUZ TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO P/CONSTRUCCION DE PUENTE TRAZO Y REPLANTEO EN OBRAS DE ARTE MOVIMIENTO DE TIERRAS EXCAVACION EN SECO CON MAQUINARIA EXCAVACION EN ROCA FIJA RELLENO PARA ESTRUCTURA CON MATERIALDE PRESTAMO ELIMINACION DE MATERIAL EXCEDENTE OBRAS DE CONCRETO SIMPLE CONCRETO F´C=100KG/CM2, PARA SOLADO E=4" - SUBESTRUCTURA SUB ESTRUCTURA CONCRETO F'C=210 KG/CM2. P/ZAPATAS CONCRETO F'C=210 KG/CM2. P/ CUERPO ESTRIBOS Y ALEROS ENCOFRADO Y DESENCOFRADO (ZAPATAS, ESTRIBOS Y ALEROS) ACERO Fy=4,200 KG/CM2. P/SUB ESTRUCTURAS ACCESORIOS DE SUB ESTRUCTURA SUB DREN DE SUB PRESION - SUB ESTRUCTURA RELLENO CON MATERIAL GRANULAR PARA SUB DREN - SUB ESTRUCTURA SUPER ESTRUCTURA FALSO PUENTE DE SUPER ESTRUCTURA VIGAS PRINCIPALES (SUPER ESTRUCTURA) CONCRETO F'C=210 KG/CM2. P/ VIGAS SUPER ESTRUCTURA

M3 KG

47.42 1,428.91

0.00 0.00

0.00 0.00

100.00 100.00

M2

150.00

224.26

149.51

0.00

M3

66.89

96.46

144.21

0.00

M2

63.00

84.70

134.44

0.00

M3

66.89

88.15

131.78

0.00

M3

24.00

29.28

122.00

0.00

M

29,740.00

8,610.00

28.95

71.05

M

1,080.00

1,540.00

142.59

0.00

M

160.00

1,560.00

975.00

0.00

M2

542.50

542.50

100.00

0.00

M2

542.50

542.50

100.00

0.00

M3

729.38

729.38

100.00

0.00

M3

68.63

68.63

100.00

0.00

M3

317.83

317.83

100.00

0.00

M3

1,037.41

1,037.41

100.00

0.00

M2

126.12

126.12

100.00

0.00

M3

171.12

171.12

100.00

0.00

M3

104.04

104.04

100.00

0.00

M2

361.82

361.82

100.00

0.00

KG

19,083.95

19,083.95

100.00

0.00

UND

2.00

2.00

100.00

0.00

M3

3.23

3.23

100.00

0.00

M

25.00

25.00

100.00

0.00

M3

46.62

46.62

100.00

0.00

16

06.07.02

06.08.00 06.08.01 06.08.02

06.09.00 06.09.01 06.09.02 06.10.00 06.10.01 06.10.02 06.11.00 06.11.01 06.11.02 06.11.03 07.00.00 07.01.00 07.01.01 07.01.02 07.02.00 07.02.01 07.02.02 07.02.03 07.03.00 07.03.01 07.04.00 07.04.01 07.04.02 07.04.03 07.04.04 07.05.00 07.05.01 07.05.02

ACERO Fy=4,200 KG/CM2. P/VIGAS SUPER ESTRUCTURAS DIAFRAGMAS (SUPER ESTRUCTURA) CONCRETO F'C=210 KG/CM2. P/DIAFRAGMAS-SUPER ESTRUCTURA ACERO Fy=4,200 KG/CM2. P/DIAFRAGMAS-SUPER ESTRUCTURAS LOSA (SUPER ESTRUCTURA) CONCRETO F'C=210 KG/CM2. P/ LOSA -SUPER ESTRUCTURA ACERO Fy=4,200 KG/CM2. P/LOSASUPER ESTRUCTURAS APOYOS EN EXTREMOS DE VIGAS APOYO FIJO APOYO MOVIL ACCESORIOS DE SUPER ESTRUCTURA JUNTA DE DILATACION CONTRACCION METALICA - SUPER ESTRUCTURA TUBERIA DE DRENAJE PVC SAP D=3" - SUPER ESTRUCTURA BARANDA DE Fº Gº DE 2 1/2" + PERF. ACERO PONTON L=10.00 M. DE LUZ TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO P/CONSTRUCCION DE PUENTE TRAZO Y REPLANTEO EN OBRAS DE ARTE MOVIMIENTO DE TIERRAS EXCAVACION EN SECO CON MAQUINARIA EXCAVACION DE MATERIAL BAJO AGUA CON MAQUINARIA RELLENO PARA ESTRUCTURA CON MATERIAL DE PRESTAMO OBRAS DE CONCRETO SIMPLE CONCRETO F´C=100KG/CM2, PARA SOLADO E=4" - SUBESTRUCTURA SUB ESTRUCTURA CONCRETO F´C= 175 KG/CM2 + 30 % P.G. - (ZAPATAS, ESTRIBOS Y ALEROS) CONCRETO F'C=210 KG/CM2. PARAPETO ENCOFRADO Y DESENCOFRADO (ZAPATAS, ESTRIBOS Y ALEROS) ACERO Fy=4,200 KG/CM2, PARAPETO ACCESORIOS DE SUB ESTRUCTURA SUB DREN DE SUB PRESION - SUB ESTRUCTURA (PONTON) RELLENO CON MATERIAL GRANULAR PARA SUB DREN - SUB

KG

1,014.50

1,014.50

100.00

0.00

M3

3.51

3.51

100.00

0.00

KG

698.92

698.92

100.00

0.00

M3

33.98

33.98

100.00

0.00

KG

3,283.76

3,283.76

100.00

0.00

UND UND

2.00 2.00

2.00 2.00

100.00 100.00

0.00 0.00

M

8.00

8.00

100.00

0.00

M

3.00

3.00

100.00

0.00

M

51.80

51.80

100.00

0.00

M2

252.00

252.00

100.00

0.00

M2

252.00

252.00

100.00

0.00

M3

231.59

231.59

100.00

0.00

M3

207.64

207.64

100.00

0.00

M3

122.93

122.93

100.00

0.00

M2

79.86

79.86

100.00

0.00

M3

226.60

226.60

100.00

0.00

M3

16.48

16.48

100.00

0.00

M2

258.72

258.72

100.00

0.00

KG

458.82

458.82

100.00

0.00

UND

2.00

2.00

100.00

0.00

M3

2.74

2.74

100.00

0.00

17

ESTRUCTURA 07.06.00 07.06.01 07.07.00 07.07.01 07.07.02

07.08.00 07.08.01 07.08.02

07.09.00 07.09.01 07.09.02 07.09.03

SUPER ESTRUCTURA FALSO PUENTE DE SUPER ESTRUCTURA (PONTON) LOSAS, VIGAS Y SARDINEL CONCRETO F'C=210 KG/CM2. P/ SUPER ESTRUCTURA ACERO Fy=4,200 KG/CM2. P/LOSASUPER ESTRUCTURAS APOYOS EN LOS EXTREMOS DE LA LOSA APOYO FIJO DE NEOPRENE 0.30 CM x 1" APOYO MOVIL DE NEOPRENE 0.30 CM x 1 " ACCESORIOS DE SUPER ESTRUCTURA JUNTA DE DILATACION CONTRACCION METALICA - SUPER ESTRUCTURA (PONTON) TUBERIA DE DRENAJE PVC SAP D=3" - SUPER ESTRUCTURA BARANDA DE Fº Gº DE 2 1/2" + PERF. ACERO

M

10.00

10.00

100.00

0.00

M3

35.21

35.21

100.00

0.00

KG

3,503.96

3,503.96

100.00

0.00

M

4.70

4.70

100.00

0.00

M

4.70

4.70

100.00

0.00

M

8.00

8.00

100.00

0.00

M

7.50

7.50

100.00

0.00

M

21.20

21.20

100.00

0.00

M3

0.90

0.90

100.00

0.00

M3

0.77

0.77

100.00

0.00

07.10.03 07.10.04

SEÑALIZACION Y SEGURIDAD VIAL EXCAVACION MANUAL (SEÑAL INFORMATIVA) CONCRETO F´C= 140 KG/CM2 + 30 % P.G. - (SEÑAL INFORMATIVA) SEÑAL INFORMATIVA HITOS KILOMETRICOS

UND UND

4.00 36.00

2.00 0.00

50.00 0.00

50.00 100.00

09.00.00 09.01.00

FLETE TERRESTRE FLETE TERRESTRE

GLB

1.00

2.50

249.54

0.00

07.10.00 07.10.01 07.10.02

Metrados Ejecutados no Previstos en el Expediente Técnico: METRADOS PARTIDA

10.00.00 10.01.00 10.01.01 10.01.02 10.01.03

3.4

DESCRIPCION

OTROS PARTIDAS MURO SECO EXCAVACION PARA MURO SECO ACOPIO DE PIEDRA PARA MURO SECO ACOMODO Y ACARREO DE PIEDRA PARA MURO SECO

UN

METRADO BASE

METRADO EJECUTADO

% EJECUTADO

%X EJECUTAR

M3

0.00

1,637.76

100.00

0.00

M3

0.00

1,290.37

100.00

0.00

M3

0.00

1,290.37

1,000.00

0.00

Revisión del Cuaderno de Obra:

18

Se ha aperturado el 1er cuaderno de obra con fecha del 10 de Abril del 2008, según legalización del Juzgado de Paz de Primera Instancia de Santo Domingo de Acobamba Paz. Con fecha del 14 de Mayo del 2008 según folio nro. 02, 03 del Cuaderno de Obra se suscribió el Acta de Disponibilidad de Terreno de Obra , conjuntamente con el Sr. Alcalde del Distrito señor Isaías Grabel Cano y su plano de regidores , funcionarios de la Municipalidad , Supervisor de Obra , Residente de la obra y autoridades de los anexos a beneficiarse por la construcción de la Trocha Carrozable Rosas Pampa – San Antonio de Alegría en su I Etapa. Con fecha 15 de Mayo del 2008 según folio nro. 04,05 del Cuaderno de Obra se Suscribió el Acta de Inicio de Obra con la presencia del Alcalde del Distrito Sr. Isaías Grabel Cano, Plana de regidores y las Autoridades de los Anexos a Beneficiarse. Se han realizado la utilización de 628 folios de anotaciones del Cuaderno de Obra, de parte del Residente de Obra se realizo 495 asientos en el Cuaderno de Obra, por parte del superviso de obra se realizo 132 asientos en el Cuaderno de Obra. 3.5

Verificación de Valorizaciones Se ha presentado por parte de la Supervisión de Obra y Residencia de Obra la presentación de Valorizaciones Mensuales reportando los avances ejecutados en los periodos mensuales ejecutados la cual detallamos en el cuadro adjunto:

19

DESCRIPCION DE VALORIZACION

CORRESPONDIENT E AL MES

MONTO VALORIZADO

% VALORIZADO

VALORIZACION NRO 01 VALORIZACION NRO 02 VALORIZACION NRO 03 VALORIZACION NRO 04 VALORIZACION NRO 05 VALORIZACION NRO 06 VALORIZACION NRO 07 VALORIZACION NRO 08 VALORIZACION NRO 09 VALORIZACION NRO 10 VALORIZACION NRO 11 VALORIZACION NRO 12 VALORIZACION NRO 13 VALORIZACION NRO 14 VALORIZACION NRO 15 VALORIZACION NRO 16 VALORIZACION NRO 17 VALORIZACION NRO 18 VALORIZACION NRO 19 VALORIZACION NRO 20

MAYO JUNIO JULIO AGOSTO SEPTIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO SEPTIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE

S/. 130,729.04 S/. 258,096.90 S/. 240,228.75 S/. 351,227.28 S/. 46,800.24 S/. 76,246.35 S/. 84,723.81 S/. 70,118.18 S/. 45,533.18 S/. 88,069.72 S/. 108,421.15 S/. 45,165.37 S/. 66,177.46 S/. 224,085.35 S/. 115,434.39 S/. 125,287.84 S/. 151,716.37 S/. 4,593.47 S/. 45,143.38 S/. 437,561.27

5.69% 11.23% 10.45% 15.28% 2.04% 3.32% 3.69% 3.05% 1.94% 3.83% 4.76% 1.97% 2.88% 9.75% 5.02% 5.45% 6.60% 0.20% 1.96% 19.04%

S/. 2,715,359.50

118.16%

COSTO DIRECTO

En

total

se

han

presentado

20

valorizaciones

mensuales,

acumulando un avance físico en la obra del las cuales hacen su 118.16 % y con duración de plazo de 20 meses según los reportes en las respectivas valorizaciones que se adjuntan en el Anexo nro 01. 3.6

Verificación de los pagos efectuados Los pagos Ejecutados han sido efectuadas por el Área de Abastecimiento, la cual han sido pagados con el visto de conformidad del Alcalde de la Municipalidad Distrital de Santa Bárbara de Carhuacayan, Jefe de la Oficina de Obras MDSBC

20

,Supervisor de obra , Residente de Obra ; en los rublos de Planillas, Servicios y Bienes que se adquirieron para la Obra. a) Pago de Materiales y Equipos Los materiales se adquirieron mediante la siguiente forma: A través de la Dirección de Abastecimientos mediante la emisión de órdenes de compra a proveedores y pagadas por la Dirección de Tesorería con Fondo asignado a Obra. b) Pago de Mano de Obra Este rubro se Ejecuto con pago de Planillas a los Trabajadores de la obra en mayor incidencia en Mano de obra No calificada de la Zona con los respectivos beneficios. Así mismo se tuvo la contratación de Mano de Obra por Terceros en trabajos especiales como (Construcción de obras de arte, captación, cámaras de rompe presión, reservorio y buzones) 3.7

Análisis de Costos y Gastos Realizados a) Relación de Materiales que ingresaron a Obra. Se han llevado con sus respectivas PECOSA y manejo de Cardex o movimiento de almacén llevado en Obra. (Ver Anexo Nro 02)

21

b) Materiales previsto vs adquiridos real. Se está reportando los materiales adquiridos comprobantes de pagos. ( Ver Anexo Nro 03)

según los

c) Cuadro de gastos pagados por la Municipalidad. AÑO 2,008: Gastos en Ejecución: ITEM 6.5.11.10 6.5.11.11 6.5.11.13 6.5.11.20 6.5.11.22 6.5.11.23 6.5.11.24 6.5.11.26 6.5.11.27 6.5.11.29 6.5.11.30 6.5.11.32 6.5.11.33 6.5.11.39 6.5.11.49 6.5.11.50 6.5.11.57 6.5.11.60 6.5.11.65

DESCRIPCION Retrib. Y Comple. - Contrato a Plazo Indefinido Obligaciones del empleador Gastos Variables y Ocacionales Viàticos y Asignaciones Vestuario Combustibles y Lubricantes Alimento de Personas Materiales Explosivos y Municiones Servicios No Personales Materiales de Construcciòn Bienes de Consumo Pasajes y Gastos de Transporte Servicios de Consultorìa Otros Servicios de Terceros Materiales de Escritorio Servicios de terceros - Obras por Contrato Servicios de Telefonia Movil y Fija Adquisiciòn de Inmuebles Alquiler de Bienes Inmuebles TOTAL EJECUTADO

TOTAL 480.00 839.12 79.96 20.00 0.00 1,356.25 0.00 0.00 4,100.00 164,540.72 0.00 5,016.00 15,600.00 9,098.99 5.00 32,971.00 35.00 0.00 30,423.80 264,565.84

AÑO 2,009: Gastos en Ejecución:

22

6.5.11.10 6.5.11.11 6.5.11.13 6.5.11.20 6.5.11.22 6.5.11.23 6.5.11.24 6.5.11.26 6.5.11.27 6.5.11.29 6.5.11.30 6.5.11.32 6.5.11.33 6.5.11.36 6.5.11.37 6.5.11.39 6.5.11.49 6.5.11.50 6.5.11.51

Retrib. Y Comple. - Contrato a Plazo Indefinido Obligaciones del empleador Gastos Variables y Ocacionales Viàticos y Asignaciones Vestuario Combustibles y Lubricantes Alimento de Personas Materiales Explosivos y Municiones Servicios No Personales Materiales de Construcciòn Bienes de Consumo Pasajes y Gastos de Transporte Servicios de Consultorìa Tarifas de Servicios Bàsicos Alquiler de Bienes Otros Servicios de Terceros Materiales de Escritorio Servicios de terceros - Obras por Contrato Equipamiento y Bienes Duraderos TOTAL EJECUTADO

15.84 24.79 1.32 0.00 0.00 152.85 0.00 0.00 0.00 16,440.80 87.60 0.00 3,200.00 0.00 0.00 5,378.90 0.00 0.00 0.00 25,302.10

AÑO 2,010: Gastos en Ejecución: ITEM 6.5.11.10 6.5.11.11 6.5.11.13 6.5.11.20 6.5.11.22 6.5.11.23 6.5.11.24 6.5.11.26 6.5.11.27 6.5.11.29 6.5.11.30 6.5.11.32 6.5.11.33 6.5.11.36 6.5.11.37 6.5.11.39 6.5.11.49 6.5.11.50 6.5.11.51

3.8

DESCRIPCION Retrib. Y Comple. - Contrato a Plazo Indefinido Obligaciones del empleador Gastos Variables y Ocacionales Viàticos y Asignaciones Vestuario Combustibles y Lubricantes Alimento de Personas Materiales Explosivos y Municiones Servicios No Personales Materiales de Construcciòn Bienes de Consumo Pasajes y Gastos de Transporte Servicios de Consultorìa Tarifas de Servicios Bàsicos Alquiler de Bienes Otros Servicios de Terceros Materiales de Escritorio Servicios de terceros - Obras por Contrato Equipamiento y Bienes Duraderos TOTAL EJECUTADO

TOTAL 15.84 24.79 1.32 0.00 0.00 152.85 0.00 0.00 0.00 16,440.80 87.60 0.00 3,200.00 0.00 0.00 5,378.90 0.00 0.00 0.00 25,302.10

Cuadro Comparativo del Presupuesto Analítico de Obra Vs Ejecutado por la Municipalidad.

23

Según información contable se ha ejecutado Gastos de Capital en la subprograma de inversiones en aplicaciones directas en los rubros de Servicios por terceros y equipamiento , Materiales Duraderos. ITEM 6.5.11.10 6.5.11.11 6.5.11.13 6.5.11.20 6.5.11.22 6.5.11.23 6.5.11.24 6.5.11.26 6.5.11.27 6.5.11.29 6.5.11.30 6.5.11.32 6.5.11.33 6.5.11.36 6.5.11.37 6.5.11.39 6.5.11.49 6.5.11.50 6.5.11.51 6.5.11.52 6.5.11.53 6.5.11.57 6.5.11.60 6.5.11.65 6.5.11.71 6.5.11.72

3.9

Retrib. Y Comple. - Contrato a Plazo Indefinido Obligaciones del empleador Gastos Variables y Ocacionales Viàticos y Asignaciones Vestuario Combustibles y Lubricantes Alimento de Personas Materiales Explosivos y Municiones Servicios No Personales Materiales de Construcciòn Bienes de Consumo Pasajes y Gastos de Transporte Servicios de Consultorìa Tarifas de Servicios Bàsicos Alquiler de Bienes Otros Servicios de Terceros Materiales de Escritorio Servicios de terceros - Obras por Contrato Equipamiento y Bienes Duraderos Alquiler de Bienes Muebles Materiales de Instalación Electrica y Electrónica Servicios de Telefonia Movil y Fija Adquisiciòn de Inmuebles Alquiler de Bienes Inmuebles Gastos de Servicios Anteriores Indenmizaciones y Compensaciones TOTAL EJECUTADO

PRESUPUEST PRESUPUES O PREVISTO TO REAL

0.00

495.84 863.91 81.28 20.00 0.00 1,509.10 0.00 0.00 4,100.00 180,981.52 87.60 5,016.00 18,800.00 0.00 0.00 14,477.89 5.00 32,971.00 0.00 0.00 0.00 35.00 0.00 30,423.80 0.00 0.00 289,867.94

Los Cuadros Comparativos me permiten dar las Siguientes Apreciaciones: • • •

3.10

DESCRIPCION

Se pude apreciar en el cuadro nro 02 , se han ejecutado mayores Metrados en la partida 4.03.00 de Veredas en las sub partidas 4.03.01 y 4.03.02. Así mismo al respecto de los materiales adquiridos con lo presupuestado no se pude dar una apreciación por la falta del Expediente Técnico. Concerniente a los Gastos Ejecutados en la presente obra están por debajo de su presupuesto asignado según Pre liquidación de Obra.

Comentario Técnico.

24

Era necesario que en el Expediente Técnico se considere una partida de mantenimiento de la infraestructura ya que se ha podido observar que falta limpieza y mantenimiento de los drenajes pluviales y alcantarillas

INFORME FINAL DE LIQUIDACION TECNICA DE OBRA 1. ANTECEDENTES Mediante Convenio para la Ejecución de Obra , Bajo la modalidad de Ejecución de Transferencia financiera , entre el Gobierno Central FONIPREL y la Municipalidad Distrital de Santa Bárbara de carhuacayan N° 027-2008-GR-JUNIN-GGR. De fecha del 27 de Octubre del 2007 se suscribió para la ejecución de la Obra Mejoramiento y Ampliación del Sistema de Agua Potable y Alcantarillado Santa Bárbara de Carhuacayan. Mediante Adjudicación de Menor cuantía , se suscribió el Contrato de servicio de Liquidación de Obra dentro de las cuales se encuentra la obra materia del presente informe, cuyos procedimientos se rigen por la propuesta presentada, las Especificaciones Técnicas entregadas y en lo general por el Texto Único Ordenado del D.S. No. 083-2004-PCM, de la Ley 28267 "Ley de Contrataciones y Adquisiciones del Estado", su reglamento D.S. No. 084-2004-PCM, y su modificación D.S. No. 063-2006-EF , D.S. No. 148-2006, la Ley 28827 Ley de Gestión Presupuestaria y la Ley de Presupuesto para el Sector Público correspondiente al ejercicio 2007. La Obra: "MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO SANTA BARBARA DE CARHUACAYAN ”, ha sido ejecutada en el marco del Plan de Acción Presupuestas para el Ejercicio 2009, 2010 y 2,011 dentro del Programa de obras de Servicios Públicos Locales , bajo la modalidad de Administración Directa. 2. DEL EXPEDIENTE TECNICO: No se tiene información del Consultor que realizo el Expediente Técnico, se esta considerando como Presupuesto Base lo informado en la Pre Liquidación de Obra presentada por el Residente de Obra. ITEM

DESCRIPCIÓN

Unidad

Metrado

Precio

Subtotal

Total

25

01,00,00 TRABAJOS PROVISIONALES 01,01,00 CARTEL DE IDENTIFICACIÓN DE OBRA 01,02,00 A LMACEN Y OTROS MOVILIZACIÓN Y DESMOVILIZACIÓN CON 01,03,00 MAQUINARIA

1900 GLB GLB

1 1

200 200

200 200

GLB

1

1500

1500

02,00,00 OBRAS PRELIMINARES 02,01,00 LIMPIEZA DE TERRENO MANUAL M2 02,02,00 TRAZO, NIVELACIÓN Y REPLANTEO INICIAL M2 TRAZO Y REPLANTEO CON TOPÓGRAFO 02,03,00 DURANTE LA OBRA M2 03,00,00 MOVIMIENTO DE TIERRAS 03,01,00 PICADO DE CUNETA EXISTENTE CORTE DE TERRENO NATURAL CON 03,02,00 MAQUINARIA 03,03,00 CORTE DE TERRENO MANUAL 03.04.00 DEMOLICIONES 03.04.1 DEMOLICIÓN DE CUNETA EXISTENTE 03.04.2 DEMOLICIÓN DE ALCANTARILLA PERFILADO Y COMPACTADO DE TERRENO 03.04.3 NATURAL BASE DE MATERIAL AFIRMADO 03.04.4 COMPACTADO 03.05.00 SUB BASE 03.05.1 SUB-BASE DE MATERIAL AFIRMADO AFIRMADO Y COMPACTADO DE BASE PARA VEREDA CON MATERIAL DE CANTERA 10 03.05.2 CM. ELIMINACIÓN DE MAT. EXCED. CON 03.05.3 TRANSPORTE VOLQUETE 4,5 M3 04,00,00 OBRAS DE CONCRETO SIMPLE 04.01.0 CUNETAS 04.01.1 CONCRETO FC = 175 KG/CM2 04.01.2 ENCOFRADO Y DESENCOFRADO NORMAL 04.02.00 SARDINELES CONCRETO FC -175 KG/CM2, EN 04.02.1 SARDINELES CONCRETO FC =140 KG/CM2, CIMIENTO DE 04.02.2 SARDINEL 04.02.3 ENCOFRADO Y DESENCOFRADO NORMAL 04.03.0 VEREDAS VEREDA CONCRETO FC =140 KG/CM2 8,5 04.03.1 CM + ACABADO 1:2 (1,5CM)E=4" 04.03.2 ENCOFRADO Y DESENCOFRADO NORMAL 04.04.0 04.04.1 04.04.2 05,00,00 05.01.0 05.01.1 05.01.2

GRADERÍAS CONCRETO FC= 140 KG/CM2 ENCOFRADO Y DESENCOFRADO NORMAL OBRAS DE CONCRETO ARMADO ALCANTARILLAS PRINCIPAL CONCRETO FC= 210 KG/CM2 ENCOFRADO Y DESENCOFRADO NORMAL

4776,8432 3.142,66 3.142,66

0,22 0,38

691,3852 1194,211

3.142,66

0,92

2891,247

M3

100,66

2,50

251,65

M2 M3

1.477,33 86,78

5,60 15,83

8273,048 1373,727

9898,4254

35703,995 M3 M3

10,95 2,84

47,07 18,08

515,4165 51,3472

M2

3.142,66

0,35

1099,931

M2

2.934,25

11,60

34037,3

M3

532,55

53,65

28571,31

M2

55,13

12,13

668,7269

M3

1.894,15

12,95

24529,24

53769,277

12411,272 M3 M2

27,22 395,00

250,19 14,18

6810,172 5601,1 4222,1789

M3

10,10

245,19

2476,419

M3 M2

0,51 120,31

219,51 13,58

111,9501 1633,81 1815,6225

M2 M2

55,13 6,31

30,99 16,98

1708,479 107,1438

M3 M2

2,70 13,40

219,51 16,98

592,677 227,532

M M2

4,18 30,59

279,75 14,18

1169,355 433,7662

820,209

2805,7228

26

05.01.3 05.02.0 05.02.1 05.02.2 05.02.3 05.03.0 05.03.1 05.03.2 05.03.3 06,00,00 06,01,00 07,00,00 07.01.0 07.01.1 07.01.2 07.01.3 08,00,00 08,01,00 09,00,00 09,01,00 09,02,00 09,03,00 10,00,00 10,01,00 11,00,00 11,01,00 11,02,00 11,03,00

ACERO FY =4200 KG/CM2 GRADO 60 CANALES CONCRETO FC= 175 KG/CM2 ENCOFRADO Y DESENCOFRADO NORMAL ACERO FY =4200 KG/CM2 GRADO 60 TECHO DE CUNETAS CONCRETO FC= 175 KG/CM2 ENCOFRADO Y DESENCOFRADO NORMAL ACERO FY =4200 KG/CM2 GRADO 60 REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO FROTACHADO PISOS Y PAVIMENTOS TARRAJEO FROTACHADO CONCRETO FC= 210 KG/CM2 ENCOFRADO Y DESENCOFRADO NORMAL CONEXIÓN DE LOSAS JUNTAS DE DILATACIÓN RELLENO DE JUNTAS CON MEZCLA ASFÁLTICA JARDINERÍA SEMBRÍO DE GRAS RELLENO CON TIERRA AGRÍCOLA RIEGO PERMANETE DE ÁREAS VERDES INSTALACIÓN SANITARIA REPARACIÓN DE INSTALACIONES SANITARIAS PRUEBAS Y ENSAYOS ENSAYO RESISTENCIA A LA COMPRENSIÓN - PROBETAS DISEÑO DE MEZCLAS DE CONCRETO PRUEBA DE COMPACTACION DE SUELO

KG

267,84

4,49

1202,602 239,6967

M3 M2 KG

0,42 4,38 14,01

245,19 16,98 4,45

102,9798 74,3724 62,3445 423,7274

M3 M2 KG

0,56 7,90 34,22

245,19 16,98 4,45

137,3064 134,142 152,279 4057,0611

M2

426,61

9,51

4057,061 178797,22

M3 M2 M2

586,85 315,64 2.934,25

279,44 16,98 3,22

163989,4 5359,567 9448,285 5013,6694

M

1.596,71

3,14

5013,669

57,23 8,58 171,69

4,68 46,81 0,14

267,8364 401,6298 24,0366

693,5028 M2 M3 M2

1200 GLB

1,00

1.200,00

1200 900

UND UND UND

2,00 2,00 2,00

20,00 280,00 150,00

40 560 300

COSTO DIRECTO GASTOS GENERALES TOTAL PRESUPUESTO

3.

319.448,42 38.333,81 357.782,23

DE LA LIQUIDACION: a)

DOCUMENTACION LEGAL La presente Obra No Cuenta con los siguientes documentos legales: •

No cuenta con Resolución de aprobando del Expediente Técnico de la Obra “MEJORAMIENTO Y AMPLIACION DEL SISTEMA

27

DE AGUA POTABLE Y ALCANTARILLADO SANTA BARBARA DE CARHUACAYAN”. •

No cuenta con Resolución de Alcaldía aprobando el Presupuesto para la Ejecución de la Obra “MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO SANTA BARBARA DE CARHUACAYAN”.

La presente Obra No Cuenta con las siguientes Actas: o o o b)

Acta de Entrega de terreno. Acta de Terminación de Obra. Acta de Recepción de Obra.

CRITERIOS GENERALES La presente Liquidación Final de Obra, se ha elaborado tomando como referencia los Normas que Regulan la Ejecución de Obras Públicas por Administración Directa y Normas de Control interno para el Área de Obras Publicas. Así mismo, para la determinación de los montos cifrados en la Liquidación Técnica y las cantidades establecidas en la Liquidación Financiera, se tomó en cuenta la verificación física de la Obra y en los documentos proporcionados por la Dirección de Obras de la Municipalidad y Dirección de Tesorería.

c)

DEL CONTROL DE CALIDAD EN OBRA. No se encontró pruebas de control de calidad técnicas realizadas en la Obra.

f)

DEL PRESUPUESTO ESTABLECIDO CON METRADOS REALES EJECUTADOS El presupuesto establecido con los Metrados reales ejecutados en obra asciende a S/. 365,912.07. físicamente en obra ejecutado.

4. DEL COSTO DE LA OBRA Como resultado de la liquidación Final de Obra, expuestos en la Liquidación Técnica y Liquidación Financiera, la liquidación final de obra de la Obra “MEJORAMIENTO Y AMPLICACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO SANTA BARBARA DE CARHUACAYAN”, el costo final de obra pagado por la Municipalidad de Santa Bárbara de Carhuacayan, asciende a S/. 289,867.94 5. CONCLUSIONES

28

La obra MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO-SANTA BARBARA DE CARHUACAYAN, se ejecuto en su momento y solo se ha podido determinar los trabajos realizados con la información de los pagos realizados con los comprobantes de pagos (CPS); lo que se demuestra que no se ha tenido un manejo administrativo en obra y así mismo al no contar con el Expediente Técnico alguno y/o información relevante de la obra . Según la valorización final física de la obra se alcanzó en un 102.27 % valorizándose en 365,912.07 el cual se cumplió las metas establecidas en el Expediente Técnico. Se ejecuto un gasto contable financiero a la Obra por un monto de S/. 289,867.94 el cual se cumplió con el objetivo de la norma que regula la ejecución de obra publicas por administración directa (Resolución de Contraloría N°195-88-CG) donde de se especifica que el costo total de la obra a ejecutarse por la modalidad de administración directa resulte igual o menor al presupuesto base deducida la utilidad. 6. RECOMENDACIONES Todo proyecto antes de su ejecución debe contar con su respectivo Expediente Técnico y debe ser analizadas por un profesional de la rama, a fin de realizar las evaluaciones pertinentes para una reformulación y/o mejoramiento del proyecto, a fin de evitar adicionales o deductivos de obra. Para luego ser ratificadas por una Resolución de Alcaldía. De acuerdo al tipo de Obra se debe considerar en los Estudios del Proyecto lo siguiente estudios de suelos y de canteras, estudio geológico, Impacto ambiental, ensayos de rotura de probetas de concreto a compresión, grado de compactación, etc., con la finalidad de garantizar la buena Ejecución de la Obra. Las obras deben tener un Residente de Obras permanente para llevar un mejor control técnico – administrativo y constructivo de las partidas confortantes de la obra a ejecutarse además se le debe exigir que presente un Informe Final, Pre-liquidación Técnica – Financiera en forma detallada incluyendo los Kardex. Los Proyectos a ejecutarse por la Modalidad de Administración deben ceñirse a las normas que regulan la Resolución de Contraloría N° 195-88CG. Se recomienda emitir una Liquidación de la Obra

Resolución de Alcaldía Aprobando la

29

30

31

32

33

34

35

36

Related Documents


More Documents from "Ing Mario Tepox Estrada"

February 2021 0
Solfeo Ruso
February 2021 0
Hoja De Procesos
January 2021 3
Club179
March 2021 0