2. Perancach Dan Berkisting 014 Method Statement Pier Head Cast Insitu

  • Uploaded by: Naufal Sadil
  • 0
  • 0
  • February 2021
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View 2. Perancach Dan Berkisting 014 Method Statement Pier Head Cast Insitu as PDF for free.

More details

  • Words: 13,812
  • Pages: 107
Loading documents preview...
PT. JAKARTA TOLLROAD DEVELOPMENT PEMBANGUN AN 6 (ENAM) RUASJALAN TOL DALAM KOTAJAKARTA TAHAP 1 RUAS SEMANAN ·SUNTER- PULO GEBANG CONSULTANT :

PT. JAVA CM· PT. VIRAMA KARYA · PT.OPTA STRADA, KSO

CONTRACTOR : PT.JAYA KOSTRUKSI· PT,ADHI KARYA. KS0

DOCUMENT TRANSMITIAL To

KSO, JAKON ·ADHI

Date

27-Dec-17

Attn

General Superintendent

No. Tra nsmittal

417/TRS/T6RD/JVC/X II/2017

Bapak Didi Rustadi

Subject

: Request Of Work

CONSULTANT'S REMARKS: NO

Contractor Document No.

Consultant Document No.

1

Submitted by Consultant,

Description/Title

Keterangan

Metode Kerja Pier Head

Dikemballkan untuk dl revisl

Received by Contractor ,

Nama

Rini Nur Sh I Doc & Control

Nama

Date

27-Dec-17

Date

Signature

Signature

liiU

JAKARTA TOUROAD DEVELOPMENT

PT. JAKARTA TOLLROAD DEVELOPME NT PEMBANGUNAN 6 (ENAM) RUAS JALAN TOL DALAM KOTA JAKARTA TAHAP 1RUAS SEMANAN-SUNTER-PULO GEBANG SEKSI Al (STA 23+500 S/D 24+436)

CONSULTANT

CONTRACTOR PT.JAVA CM ·PT.VlRAMA KAAYA - PT. CIPTA STRADA. KSO

KSOJAYA KONSTRUKSI-AOHI

SUBMITTAL/ TRANSMITTA L RECORD

No.

: 6R JO/MST/032/17

Date: December 15, 2017

: lr. M. Zah ir Siregar, MM : Submit Metode Pier Head

Item

Item No.

1

Document Number

Metode Kerja Pier Head

CONTRACTOR'S REMARKS ATIACHMENT

FOR YOUR

D SAMPLE/RESULT

D SCHEDULE @METHOD STATEME NT D REPORT : APPROVAL D INFORMATION D ACTION 0 COMMENTS

:

Submitted by,

arn

No. 6RJ/KSOJA/MST/014

D

DRAWING/PLAN

D OTHERS D AS REQUESTED D OTHERS Received by,

@I7@170Bllf?i

( lr. Didi Rustadi) KSO JAVA KONSTRUKSI-ADHI Date : Dece mber 15, 2017

Consultant Date

: :

JL:J

ut!1t\ L:Jt.:

Date: ......-:>..............

METODE KERJA PIERHEAD

No. Dokumen: 6RJ/KSOJA/MST /014

CM . - ...

DOCUMENT

PEMBANGUNAN 8 RUAS JALA N TOt.

APPROVAL

OA LAM KOTA JAKARTA

PROVED PROVED AS NOTED T APPRO VEO fORMATION ONLY CONSUlTAN T 9

Doc . No.

J(

T l 0,L::[£1Is 12:I -Is I -I' !QJ - 1 t 1 - ID_j J. 11 1 I / I I I I I_!_j Ooto

I

Pembangunan 6 (enam) Ruas Jalan Tol Dalam Kota Jakarta Tabap

m Ruas Semanan-

Sunter Dan Sunter- Pulo Gebang

Seksi A Kelapa Gading - Pulo Gebang (Sta. 21+881 - Sta. 31+168)

Diperiksa Rev.

Oleh/tanggal Manager Technic

Diperiksa oleh/tanggal

Diperiksa oleh/tanggal

Manager Quality

ManagerHSE

Diperiksa

Disetujui Oleh/tanggal

oleh/tanggal

GENERAL

Manager Konstruksi

SUPERINTENDENT

Diperiksa Oleh, Konsultan Supervisi PT. Jaya CM, PT.Virama Karya, PT. Cipta Strada, KSO

Tahap IB Ruas Serna nan - Sunter Dan Sunter- Pulo Gebang, Seksi A Kelapa Gading - Pulo Gebang . (Sta. 21+881 - Sta. 31+168) KSO JAYA KONSTRUKSI- ADHI

Revisi :

Tanggal :

Metode Kerja Pier Head 6RJ/K SOJNMST/014

I

P. I /20

Daftar Isi 1. Umum ............................................................................................................................................. 5 2. Spesifikasi ....................................................................................................................................... 5 3. Shop Drawing ................................................................................................................................. 5 4. Alat, Pekerja dan Material............................................................................................................... 5 4.1

Pekerja..................................................................................................................................... 5

4.2

Material & Accesoris .............................................................................................................. 6

4.2.1

Roro Shoring ................................................................................................................... 6

4.2.2

Climbing ......................................................................................................................... 6

4.2.3

Shoring PD8 .................................................................................................................... 7

4.2.4

Bottom Form Shoring PD8 ............................................................................................. 8

4.2.5

Material (JOB MIX) ........................................................................................................ 8

4.2.6

PC Strand, Sheathing/Duct, Anchorage and Grout Material ........................................... 9

4.3

Alat.......................................................................................................................................... 9

1

Crane Service 150 T 2 buah ............................................................................................................ 9

2

Concrete Pump 2 Buah.................................................................................................................... 9

3

Concrete Vibrator ............................................................................................................................ 9

4

Truck Mixer .................................................................................................................................... 9

5

Concrete Vibrator ............................................................................................................................ 9

6

Penerangan ...................................................................................................................................... 9

7

Air Compressor ............................................................................................................................... 9

8

Genset ............................................................................................................................................. 9

9

Pompa submersible 4”..................................................................................................................... 9

5. Detail/ Tahapan Pekerjaan Pier Head.............................................................................................. 9 5.1

Persiapan ................................................................................................................................. 9

5.2

Perancah (Scafolding) ........................................................................................................... 10

5.3

Fabrication and Installation of Re-Bar .................................................................................. 12

5.4

Persiapan Sebelum Pekerjaan Stressing ................................................................................ 12

5.5

Bekisting ............................................................................................................................... 13

5.6

Penuangan Beton/ Pengecoran .............................................................................................. 13

5.7

Pembongkaran Bekisting dan Scafolding.............................................................................. 14

5.8

Masa Pemeliharaan Beton ..................................................................................................... 15

5.9

Pre-Stressing Works .............................................................................................................. 15

Tahap IB Ruas Semanan - Sunter Dan Sunter - Pulo Gebang, Revisi: A Seksi A Kelapa Gading - Pulo Gebang. (Sta. 21+881 - Sta. 31+168) KSO JAYA KONSTRUKSI - ADHI Tanggal : 8 Jan 18

Metode Kerja Pier Head 6RJ/KSOJA/MST/014

P. 2 / 20

5.10 6.

Lain- Lain.............................................................................................................................. 16

Analisa Keselamatan Kerja ........................................................................................................... 16 6.1

Rencana Pengamanan/Pengendalian Lokasi Kerja................................................................ 16

6.2

Rencana Pengamanan/Pengendalian Alat Berat .................................................................... 16

6.3

Rencana Pengamanan/Pengendalian Selama Pekerjaan ........................................................ 16

Analisis keselamatan kerja harus dilaksanakan berdasarkan metodologi yang ditetapkan dalam Rencana Pengelolaan Keselamatan Proyek .......................................................................................... 18

Tahap IB Ruas Semanan - Sunter Dan Sunter - Pulo Gebang, Revisi: A Seksi A Kelapa Gading - Pulo Gebang. (Sta. 21+881 - Sta. 31+168) KSO JAYA KONSTRUKSI - ADHI Tanggal : 8 Jan 18

Metode Kerja Pier Head 6RJ/KSOJA/MST/014

P. 3 / 20

LAMPIRAN

Lampiran 1

: Perhitungan Statik Pier Head

Lampiran 2

: Detail Gambar Pier Head

Lampiran 3

: Sequence Pengecoran & Denah Concrete Mixer, Service Crane

Lampiran 4

: Detail Pemasangan Shoring

Lampiran 5

: Detail Pemasangan PD8

Lampiran 6

: Material Compound Curing

Lampiran 7

: Form Check List

Lampiran 8

: JSA (Job Safety Analysis) & JSE (Job Safety Environment)

Lampiran 9

: Matrix Pembagian Tugas Pekerjaan Pier Head

Tahap IB Ruas Semanan - Sunter Dan Sunter - Pulo Gebang, Revisi: A Seksi A Kelapa Gading - Pulo Gebang. (Sta. 21+881 - Sta. 31+168) KSO JAYA KONSTRUKSI - ADHI Tanggal : 8 Jan 18

Metode Kerja Pier Head 6RJ/KSOJA/MST/014

P. 4 / 20

1. Umum Metode Kerja ini menjelaskan konsep, prosedur dan detail mengenai metode pelaksanaan pekerjaan Pier Head di proyek Ruas Jalan Tol Dalam Kota Jakarta, Tahap IB Ruas Semanan Sunter Dan Sunter - Pulo Gebang, Seksi A Kelapa Gading - Pulo Gebang, (Sta. 21+881 - Sta. 31+168). Terdapat Dua Jenis Pier Head yang akan digunakan di lokasi proyek ini, yaitu type Precast dan Cast in Situ. Metode Kerja ini akan terbatas asampai dengan pelaksanaan pekerjaan pier head Cast in Situ. 2. Spesifikasi Spesifikasi untuk metode kerja ini mengacu kepada Spesifikasi Umum Divisi 10.01(17) Beton Struktur Kelas A-2 (FC'40 Mpa) (Kepala Pier Beton Pratekan). S10.02 Reinforcing Steel S10.03 Prestressed Concrete

3. Shop Drawing Shop Drawing dan detail untuk Bekisting, pembesian Pier Head, dimensi Pier Head, Scafolding, aksesoris lainnya dapat dilihat di setiap lampiran request pekerjaan kolom yang diajukan.

4. Alat, Pekerja dan Material 4.1 Pekerja Tim pada pekerjaan Pier Head terdiri dari : 1. Construction Manager

1 orang

2. Engineer Structure

1 orang

3. Quality Control

1 orang

4. Supervisor

2 orang

5. Operator

2 orang

6. K3/ Traffic

3 orang

7. Pekerja/ helper

3 orang

8. Tenaga pada saat pengecoran

7 orang

9. Tenaga Finishing

4 orang

Tahap IB Ruas Semanan - Sunter Dan Sunter - Pulo Gebang, Revisi: A Seksi A Kelapa Gading - Pulo Gebang. (Sta. 21+881 - Sta. 31+168) KSO JAYA KONSTRUKSI - ADHI Tanggal : 8 Jan 18

Metode Kerja Pier Head 6RJ/KSOJA/MST/014

P. 5 / 20

4.2 Material & Accesoris 4.2.1 Roro Shoring

4.2.2 Climbing

Tahap IB Ruas Semanan - Sunter Dan Sunter - Pulo Gebang, Revisi: A Seksi A Kelapa Gading - Pulo Gebang. (Sta. 21+881 - Sta. 31+168) KSO JAYA KONSTRUKSI - ADHI Tanggal : 8 Jan 18

Metode Kerja Pier Head 6RJ/KSOJA/MST/014

P. 6 / 20

4.2.3 Shoring PD8

Tahap IB Ruas Semanan - Sunter Dan Sunter - Pulo Gebang, Revisi: A Seksi A Kelapa Gading - Pulo Gebang. (Sta. 21+881 - Sta. 31+168) KSO JAYA KONSTRUKSI - ADHI Tanggal : 8 Jan 18

Metode Kerja Pier Head 6RJ/KSOJA/MST/014

P. 7 / 20

4.2.4 Bottom Form Shoring PD8

4.2.5 Material (JOB MIX)

Tahap IB Ruas Semanan - Sunter Dan Sunter - Pulo Gebang, Revisi: A Seksi A Kelapa Gading - Pulo Gebang. (Sta. 21+881 - Sta. 31+168) KSO JAYA KONSTRUKSI - ADHI Tanggal : 8 Jan 18

Metode Kerja Pier Head 6RJ/KSOJA/MST/014

P. 8 / 20

4.2.6 PC Strand, Sheathing/Duct, Anchorage and Grout Material Detail material yang digunakan akan dijelaskan di Metode Pelaksanaan Stressing Pier head.

4.3 Alat 1. Crane Service 150 T

2 buah

2. Concrete Pump

2 Buah

3. Concrete Vibrator 4. Truck Mixer 5. Concrete Vibrator 6. Penerangan 7. Air Compressor 8. Genset 9. Pompa submersible 4”

5. Detail/ Tahapan Pekerjaan Pier Head 5.1

Persiapan

Sebelum dimulainya pekerjaan, ada beberapa hal yang harus dikonfirmasi terlebih dahulu, yaitu : Shop drawing Approve Approval Material yang akan digunakan di pekerjaan pierhead (rebar, PC Strand, Duct, Groting, PD 8 Roro Shoring, dll) Approval Job Mix Desain Concrete yang digunakan di pekerjaan pierhead Approval Metode + Sequence stressing Pier Head. Design calculations Statik Pier Head Perrmanent embedded material (Anchor bolt for PC U-Girder/Steel Box Girder, Anchorage etc.) Metode Curing dan Durasi setelah Pengecoran

Tahap IB Ruas Semanan - Sunter Dan Sunter - Pulo Gebang, Revisi: A Seksi A Kelapa Gading - Pulo Gebang. (Sta. 21+881 - Sta. 31+168) KSO JAYA KONSTRUKSI - ADHI Tanggal : 8 Jan 18

Metode Kerja Pier Head 6RJ/KSOJA/MST/014

P. 9 / 20

5.2

Perancah (Scafolding) Perancah yang digunakan berupa sytem Shoring Peri UP PD 8/ RORO S40 Perancah harus dibagun diatas landasan yang cukup kuat untuk menahan beban dari pekerjaan pier head tersebut. Untuk di proyek ini dibuatkan dua alternative untuk landasan dari system shoring tersebut. Alternative pertama dilakukan penggalian sampai pilecap, dan sytem roro shoring tersebut berdiri di atas pile cap ini. Alternative ke dua akan dibuatkan pedestal dengan mutu beton f’c = 30, setinggi 1,5 meter dari permukaan Pile Cap. Pedestal ini berfungsi mencegah material scaffolding dan accesoris terendam. Sebelum di pasang pedestal tersebut, dilakukan penggalian sampai permukaan footing, saat penggalian berlangsung akan dipasang dolken pada pinggiran tanah dan pile cap tersebut untuk mencegah terjadinya longsor saat jalan local tetap open traffic saat penggalian tersebut. Semua tahapan pekerjaan ini dilakukan dari kiri ke kanan. Langkah selanjutnya pemasangan Roro Shoring S40 (Detail terlampir di Lampiran 4) Kemudian pemasangan Hbeam 300 x 400 dan cross beam 800 x 300 dipasang diatas Support frame. Ketinggian main beams harus disesuaikan dengan Head Spindel yang dilengkapi pada bagian atas Suport frame untuk kestabilan gradien longitudinal atau melintang di bagian bawah struktur Pier Head. Kemudian Pemasangan span Beam double 800 x 300 sepajang 24 m Ketinggian Clearance span Beams harus berjarak minimal 5.5 m untuk traffic jalan local. Selanjutnya pemasangan Angkur starnd untuk keseimbangan spam beam menahan bebas diatasnya. Pemasangan H beam dilanjutkan diatas spambeam Pemasangan PD 8 sebagai landasan/ base form Selanjutnya Pemasangan Wall Climbing, dan dapat dilanjutkan ke tahapan pembesian Bekisting Setiap pinggiran menara shoring harus dilengkapi dengan safety Nett untuk menghindari material atau peralatan jatuh ke area konstruksi. Posisi Beam yang melintang dengan main beam dikaitkan dengan baut agar lebih rigid Untuk main beam dibuat chamber 3.6 cm untuk mengatasi lendutan maksimal beban pengecoran. Petugas safety harus selalu mengawasi setiap pemasangan scaffolding untuk menghindari kecelakaan atau ketidak stabilan scaffolding tersebut.

Tahap IB Ruas Semanan - Sunter Dan Sunter - Pulo Gebang, Revisi: A Seksi A Kelapa Gading - Pulo Gebang. (Sta. 21+881 - Sta. 31+168) KSO JAYA KONSTRUKSI - ADHI Tanggal : 8 Jan 18

Metode Kerja Pier Head 6RJ/KSOJA/MST/014

P. 10 / 20

Gambar 1 Tahapan pemasangan Pedestal, Roro Shoring, Span Beam, PD8, dan Base Form Pekerjaan Pier Head

Gambar 2 Alternative tampa penggunaan Pedestal Tahap IB Ruas Semanan - Sunter Dan Sunter - Pulo Gebang, Revisi: A Seksi A Kelapa Gading - Pulo Gebang. (Sta. 21+881 - Sta. 31+168) KSO JAYA KONSTRUKSI - ADHI Tanggal : 8 Jan 18

Metode Kerja Pier Head 6RJ/KSOJA/MST/014

P. 11 / 20

Gambar 3 Detail Baut antar Beam

5.3

Fabrication and Installation of Re-Bar Semua Rebar di install di atas base form pier head. Mobilisasi Rebar ke atas panel pier head menggunakan crane dengan titik angkat yang telah di tentukan. (Metode No. 6RJ/KSOJA/MST/010 Pembesian Baja Tulangan). Pengangkatan Rebar harus di kaitkan dan dikencangkan di titik angkat mengunakan kawat bendrait φ0.9mm atau lebih. Penulangan serta jarak rebar harus sesuai dengan shop drawing, yang kemudian akan di inspeksi dan chek list dengan pihak konsultan sebelum dilakukan pengecoran pier head. (Form Cheklist Terlampir).

5.4

Persiapan Sebelum Pekerjaan Stressing Selubung / Duct dengan angkur harus dipasang pada posisi yang sesuai desain/ Shop Drawing. selama atau setelah pemasangan rebar Pier Head. PC strand juga harus dipasang terlebih dahulu di selongsong/ Duct melewati anchorages sebelum dilakukan pengecoran pierhead. Untuk Detail Pekerjaan dan Pemasangan Pre Stresssing Pier Head diajukan terpisah dari Metode Pier Head (Dapat di lihat di Metode Pekerjaan Pre Stressing Pier Head).

Tahap IB Ruas Semanan - Sunter Dan Sunter - Pulo Gebang, Revisi: A Seksi A Kelapa Gading - Pulo Gebang. (Sta. 21+881 - Sta. 31+168) KSO JAYA KONSTRUKSI - ADHI Tanggal : 8 Jan 18

Metode Kerja Pier Head 6RJ/KSOJA/MST/014

P. 12 / 20

5.5

Bekisting Setelah pekerjaan Pembesian dan joint survey pembesian telah dilakukan dapat dilanjutkan dengan tahapan pemasangan side form dan end form bekisting Sebelum Pemasangan Bekisting Pier Head, Kotoran, debu, minyak dan lubang dari Tie rod sebaiknya dihindari sebelum dilakukan install bekisting agar permukaan finishing beton akan menjadi halus dan dapat di terima dari tampilan estetikanya. Releasing agent harus diletakan di permukaan form sebelum pemasangan bekisting untuk memudahkan pembongkaran bekisting dari permukaan concrete. Horinzontal atau vertical joint panel bekisting harus dipasang dengan kuat dan ketat dengan joint pint untuk mempertahankan bentuk dan dimensi bekisting selama masa penuangan concrete. Tie rod ,support bagian luar bekisting, dan overhang parts, harus dipasang mengikuti desain drawing Bentuk baja khusus dengan kayu akan digunakan untuk bagian ancor pada pekerjaan pre stressing, Posisi dan kemiringan permukaan angkur harus disesuaikan dengan approved shop drawing, yang kemudian akan dimampatkan/ di rapatkan dari luar. Proses akhir sebelum dilakukan pengecoran yaitu pengencangan bekisting, tie rod, dan support lainnya. Setiap rongga dari bagian- bagian bekisting harus terjepit dengan sempurna dan kuat, sehingga perubahan bentuk selama pengecoran dapat dihindari/ diminimal kan. Bekisting dan support lainnya (PD8, Roro Shoring, etc) dapat dilepas setelah masa perawatan awal (Curing), kurang lebih selama 2-3 hari. Tetapi Support vertical harus tetap diperhatikkan dan dipertahankan selama 7 hari masa perawatan.

5.6

Penuangan Beton/ Pengecoran Sebelum dilakukan pengecoran, agar diperhatikan kembali kebersihan permukaan bekisting, agar terhindar dari karat atau kotoran lainnya. Jika ada karat, sebaiknya dibersihkan terlebih dahulu dengan kawat sikat. Kemudian inspeksi sekali lagi kondisi Joint – joint horizontal sesuai shop drawing untuk mempertahankan ketahanan dari struktur konstruksi tersebut. Posisi tulangan, selubung, angkur, harus ter confirm sesuai dengan Shop drawing (Form Cheklist Terlampir). Jika ada permukaan yang terbuat dari kayu terkena proses pengecoran sebaiknya segera disiram dengan air. Sebelum ditempatkan di beton tersebut. Setelah truk mixer datang, kelas beton diperiksa terlebih dahulu, Kelas yang digunakan yaitu F’c 40, kemudian segera dilakukan test slump untuk 5 truk mixer awal, dan selanjutnya

Tahap IB Ruas Semanan - Sunter Dan Sunter - Pulo Gebang, Revisi: A Seksi A Kelapa Gading - Pulo Gebang. (Sta. 21+881 - Sta. 31+168) KSO JAYA KONSTRUKSI - ADHI Tanggal : 8 Jan 18

Metode Kerja Pier Head 6RJ/KSOJA/MST/014

P. 13 / 20

setiap 30 m3. Nilai slump yang ditentukan yaitu 16 ± 2 cm Beton uji diambil setiap minimal 8 pasang untuk setiap 60 M3. SAtu benda uji untuk uji kuat tekan 7 hari dan 7 benda uji lainnya untuk kuat tekan 28 hari. Concrete Pump yang akan digunakan berjumlah 2 Buah. Untuk mencegah proses segregasi, ketinggian hidung/ belalai concrete pump tersebut

salah

minimal berjarak 1.5 m. Kecepatan pengecoran beton tidak lebih dari 30 m3/ jam. Untuk Tahapan/ lapisan pengecoran dilakukan dalam satu lap. bawah

stage sebayak 3 layer, per layernya 40 cm (Detail layer benar

lihat lampiran 3) Gunakan vibrator dengan frekuensi tinggi (φ60mm) dan vibrator type stick (φ30/40mm) untuk memadatkan di area angkur).

lap. bawah

Vibrators harus tertanam di beton segar tersebut dengan kedalaman 10 cm setiap 10 detik, dengan jarak perpindahan setiap 50 cm.

Vibrator harus dimasukkan ke dalam lapisan beton bawahnya sedalam 10 s/d 15 cm.

Gambar 4 Detail Penggunaan Vibrator

Untuk menyambung lapisan bawah dengan lapisan diatasnya, vibrator harus dimasukkan sebagian (kira-kira 10 s/d 15 cm) ke dalam lapisan di bawahnya agar tercipta lekatan yang monolik, padat dan menyatu. Bekisting dan Support lainya harus decontrol selama pengecoran, pihak survey harus mengontrol setiap elevasi permukaan pier head tersebut. Pengecoran antara lapisan harus dilakukan dalam kurung waktu kurang dari 1 jam untuk menghindari cold joint concrete. Untuk finishing beton pier head, dilakukan perataan dengan ruskam sampai dengan elevasi sesuai desain. (Control final check oleh tim survey). Sediakan terpal dan semen untuk persiapan ketika hujan lebat terjadi saat pengecoran. Terpal tersebut membantu untuk mencegah masuknya air hujan ke area pengecoran, dan semen digunakan untuk kompensasi kekuatan untuk mempertahankan rasio air semen agar sesuai dengan job mix asli jika ada air hujan/air yang tak terduga masuk ke area pengecoran.

5.7

Pembongkaran Bekisting dan Scafolding Setelah pengecoran selesai, hari esok nya akan dilakukan pengendoran bekisting tersebut. Untuk pelepasan material bekisting secara keseluran dilakukan pada hari ke 2 s/d 3 hari dengan mutu beton telah mencapai 40% dari mutu beton yang direncanakan. Bekisting harus dibongkar perlahan tanpa adanya goyangan atau goncangan, setelah beton cukup mampu menahan beban

Tahap IB Ruas Semanan - Sunter Dan Sunter - Pulo Gebang, Revisi: A Seksi A Kelapa Gading - Pulo Gebang. (Sta. 21+881 - Sta. 31+168) KSO JAYA KONSTRUKSI - ADHI Tanggal : 8 Jan 18

Metode Kerja Pier Head 6RJ/KSOJA/MST/014

P. 14 / 20

selama pembongkaran tidak merusak beton. Pembongkaran harus dilakukan dengan hati-hati dan beton telah mencapai umurnya dan harus mendapatkan persetujuan dari konsultan. Pembongkaran menggunakan crane,dengan titik angkat yang telah di tentukan terlebih dahulu. Untuk tahapan pembongkaran sebagagai berikut : Turunkan spindle pada table, lalu bongkar pada base form dan PD 8. Untuk Pembongkaran PD8 membutuhkan ruang bebas kurang lebih 4.5 m dari Pier head. Angkat H- Beam dan lepaskan angkur pengaman keseimbangan Angkat spam beam, cross beam dan H beam 400 x 300 Selanjutnya untuk pelepasan roro shoring tidak di bongkar seperti awal, tapi cukup per tower (4 Set) yang kemudian di kaitkan dengan spindle sehingga proses perakitan roro shoring selanjutnya dapat lebih cepat. Miringkan roro shoring sebelumnya, kurang lebih 450 selanjutnya dapat langsung diangkat ke lokasi Pier head selanjutnya. 5.8

Masa Pemeliharaan Beton Untuk menjaga agar proses hidrasi beton dapat berlangsung dengan sempurna maka diperlukan curing untuk menjaga kelembabannya. Lamanya curing sekitar 7 hari berturut-turut mulai hari kedua setelah pengecoran. Curing dapat dilakukan dengan berbagai macam cara antara lain : Menyemprotkan dengan lapisan khusus/ curing compound pada permukaan beton. Lihat lampiran 6 Setelah bekisting di lepas (kurang lebih 2-3 hari setelah pengecoran) segera dilakukan penyiraman pada permukaan beton tersebut. Kemudian dilakukan pembungkusan dengan plastic wrapping dan plastic cor. Hal tersebut akan membantu menjaga perbedaan suhu antara permukaan dalam dan permukaan beton yang tinggi, yang dapat mengakibatkan terjadinya retakan pada permukaan struktur beton. Untuk vertikal support frame harus tetap dipertahankan hingga 7 hari atau sampai kekuatan beton mencapai 80% dari keuatan desain rencana yaitu 40 MPa, dan setelah stressing selesai di lakukan. Untuk selanjutnya dapat dilakukan pekerjaan Pre-stressing Pier Head.

5.9

Pre-Stressing Works Pekerjaan Pre Stressing Pier Head akan dilakukan setelah umur beton mencapai 80% atau 8 s/d 14 hari setelah pengecoran. Untuk Detail Pekerjaan Pier head akan diajukan terpisah.

Tahap IB Ruas Semanan - Sunter Dan Sunter - Pulo Gebang, Revisi: A Seksi A Kelapa Gading - Pulo Gebang. (Sta. 21+881 - Sta. 31+168) KSO JAYA KONSTRUKSI - ADHI Tanggal : 8 Jan 18

Metode Kerja Pier Head 6RJ/KSOJA/MST/014

P. 15 / 20

5.10 Lain- Lain Setelah masa pembongkaran bekisting pierhead, laukan inspeksi jika ada kerusakan kecil, seperti tidak ratanya permukaan, honeycomb atau sand streak. Diperbaiki menggunakan kertas minyak yang digosokan di permukaan yang mengalami sand streak tersebut, dan dilakukan chipping, dan terakhir menutup permukaan yang mengalami kerusakan kecil tersebut dengan mortar sement/ Sika hingga warnanya sesuai dengan warna asli beton pierhead tersebut. Untuk semua lubang tie rod harus ditutup dengan adukan semen atau sika grouting yang warnanya sesuai dengan warna asli beton pierhead.

6. Analisa Keselamatan Kerja 6.1

Rencana Pengamanan/Pengendalian Lokasi Kerja. 1. Lokasi pekerjaan timbunan harus bersih 2. Menyiapkan ruang kerja yang sesuai agar mobilitas alat dan tenaga kerja pada saat pekerjaan Pier Head tidak terganggu.

6.2

Rencana Pengamanan/Pengendalian Alat Berat. 1. Mengecek kelayakan alat berat oleh personil terkait (personil alat-alat berat proyek) sebelum alat di kirirn ke proyek. 2. Melakukan inspeksi rutin untuk mengecek kelengkapan device dan kelayakan operasi selama alat berada dilokasi proyek. 3. Membuat jadwal dan melakukan maintenance alat secara periodik selama alat berada di proyek oleh personil alat-alat berat.

6.3

Rencana Pengamanan/Pengendalian Selama Pekerjaan. 1. Personil Dalam proses pekerjaan timbunan, melibatkan personil seperti tabel berikut, untuk itu harus menggunakan alat pelindung diri sbb:

Tahap IB Ruas Semanan - Sunter Dan Sunter - Pulo Gebang, Revisi: A Seksi A Kelapa Gading - Pulo Gebang. (Sta. 21+881 - Sta. 31+168) KSO JAYA KONSTRUKSI - ADHI Tanggal : 8 Jan 18

Metode Kerja Pier Head 6RJ/KSOJA/MST/014

P. 16 / 20

No

Personil

Jumlah (org) 1

1

Mandor

2

Operator Alat Berat

4

3

Surveyor

2

Kelengkapan Helm Safety Glass Safety Shoes Masker Helm Safety Glass Safety Shoes Masker Helm Safety Glass Safety Shoes Masker

Jumlah (Bh) 1 1 1 1 4 4 4 4 2 2 2 2

2. Pekerjaan Pier Head Selama proses pekerjaan Pier Head pilihan berlangsung, dilokasi tersebut dipasang rambu-rambu a ; l : a. Rambu Area “Wajib Helm & Wajib Safety Shoes”. Digunakan/dipasang di pagar masuk lokasi kerja, dan seluruh area kerja di lapangan.

b. Rambu Area “Dilarang merokok”. Digunakan/dipasang di pagar masuk lokasi kerja, dan seluruh area kerja di lapangan.

c. Rambu Area “Wajib menggunakan Safety Harnest”. Digunakan/dipasang di pinggir setiap roro shoring/ tangga/ catwalk roro shoring Pier Head.

Tahap IB Ruas Semanan - Sunter Dan Sunter - Pulo Gebang, Revisi: A Seksi A Kelapa Gading - Pulo Gebang. (Sta. 21+881 - Sta. 31+168) KSO JAYA KONSTRUKSI - ADHI Tanggal : 8 Jan 18

Metode Kerja Pier Head 6RJ/KSOJA/MST/014

P. 17 / 20

Analisis keselamatan kerja harus dilaksanakan berdasarkan metodologi yang ditetapkan dalam Rencana Pengelolaan Keselamatan Proyek. 1. Mengidentifikasi Bahaya 2. List Daftar Bahaya 3. Menghitung faktor resiko dengan cara . “Probality ×Severity”. 4. Tentukan langkah-langkah pengendalian yang akan diambil 5. Penilaian risiko setelah mengambil langkah-langkah pengendalian 6. Mengevaluasi penerimaan risiko.

Klasifikasi probabilitas dan tingkat keparahan harus mengacu pada : Probabilitas Probability

Description

Level Almost Impossible (AI)

Rare or never heard of in the industry

Very Low (VL)

Heard of in the industry

Low (L)

Has occurred on Jaya Konstruksi / Adhi Karya up to once in 100 years Has occurred on Jaya Konstruksi / Adhi Karya during its lifetime up to once per

Medium (M)

year OR conditions may allow the event to occur on Jaya Konstruksi / Adhi Karya during its lifetime up to once per year Has occurred more than once per year on Jaya Konstruksi / Adhi Karya OR event

High (H)

can reasonably be expected to occur more than once per year on Jaya Konstruksi / Adhi Karya

Tahap IB Ruas Semanan - Sunter Dan Sunter - Pulo Gebang, Revisi: A Seksi A Kelapa Gading - Pulo Gebang. (Sta. 21+881 - Sta. 31+168) KSO JAYA KONSTRUKSI - ADHI Tanggal : 8 Jan 18

Metode Kerja Pier Head 6RJ/KSOJA/MST/014

P. 18 / 20

Severity Severity

Health & Safety

Level

A

Fatalities

Equipment Damage and Business Value Extensive/Massive Effect

Environmental Damage Extensive/Massive Damage

Accident/illness resulting in fatality Major Injury or Health Effect B

Major Effect

Major Damage

Moderate Effect

Moderate Damage

Minor Effect

Minor Damage

Slight Effect

Slight Damage

Extensive LTI Accident/ illness resulting permanent disability Moderate Injury or Health Effect

C

Prolonged LTI Hospitalizations Minor Injury or Health Effect Medical treatment case

D Restricted Work Case LTI (a few days) Slight Injury or Health Effect First aid E No effect on work performance LTI (a few days)

Tahap IB Ruas Semanan - Sunter Dan Sunter - Pulo Gebang, Revisi: A Seksi A Kelapa Gading - Pulo Gebang. (Sta. 21+881 - Sta. 31+168) KSO JAYA KONSTRUKSI - ADHI Tanggal : 8 Jan 18

Metode Kerja Pier Head 6RJ/KSOJA/MST/014

P. 19 / 20

Kemudian, Risk Priority akan dievaluasi berdasarkan Risk Factor Matrix berikut. Probabi lity Al most Impossible

Very Low

Low

Medium

High

A. Catastrophic

5

6

7

8

9

B. Major

4

5

6

7

8

C.

3

4

5

6

7

D. Minor

2

3

4

5

6

E. Slight

1

2

3

4

5

Consequence

Moderate

Terlepas dari adanya analisis keselamatan dan kontra tindakan yang harus diambil, tindakan pencegahan keselamatan umum akan berada di lokasi sebagai berikut, -

Meeting sebelum dilaksanakannya pekerjaan harus melibatkan semua pekerja yang terlibat

-

APD harus selalu digunakan.

-

Alat yang digunakan harus diinspeksi terlebih dahulu.

-

Tidak ada orang yang diperbolehkan melintas di bawah material yang tergantung oleh crane, dan wilayah sekitarnya

-

Menyediakan pencahayaan yang tepat untuk pekerjaan di malam hari.

-

Setiap alat yang digunakan di lapangan, harus dilakukan inspeksi secara berkala

Untuk JSA dan JSE pekerjaan Kolom ini dapat dilihat di lampiran 8.

Tahap IB Ruas Semanan - Sunter Dan Sunter - Pulo Gebang, Revisi: A Seksi A Kelapa Gading - Pulo Gebang. (Sta. 21+881 - Sta. 31+168) KSO JAYA KONSTRUKSI - ADHI Tanggal : 8 Jan 18

Metode Kerja Pier Head 6RJ/KSOJA/MST/014

P. 20 / 20

LAMPIRAN 1 Perhitungan Statik Pier Head

.

.

'

Gma il- Bls: Statik 6 Ruas Tol Dalam KOta_Edisi Terkahir.

1/18/2018

M Gmail

Moch lchsan

Bls: Statik 6 Ruas Tol Dalam KOta_Edisi Terkahir. panca atmajatama <[email protected]> Fril Dec 81 2017 at 5:19PM To: Moch lchsan Cc: Prasetyo Enggar Wibisono <wibisono.jakon@gmai l.com> citra boonastria sesde asrul <sesde.asrul@gma il.com>l DHL_EXPRESS l Alfa lka Putra l Struktur Dina l Dina l Bpk Jodi Firmansjah toldalamko ta jkt I

I

I

Dengan hormatl Terkait dengan perhitungan yang disampaikan sudah dapat diterima. Terima Kasih

Panea Atmajatama Engineer

nI CIPTA GRAHA ABADI

frl...

Engineering Consultant

JALAN TUBAGUS ISMAILVI NO.14 BANDUNG 40 134 TELP.(022) 250 0720 FAX :(022) 253 5844 E·mail :cga@ci ptagrahaabadl.com

l

[email protected],

[Quoted text hidden)

'FR_01_BEKISTING_ H_01_20171208.pdf B54K

., •'

I https:// mail.google.c m/m il/u/O/?ui=2& k=83ad74b407&js r=dSZRinUJdWo.en.&view=pt&msq=16035a2b5ee5690 d&o=stat&search=ouerv&sim... 1/ 1

1/8/2018

Gmail - Fwd: Statik 6 Ruas Tol Dalam KOta_Edisi Terkahir.

Prasetyo Enggar Wibisono <[email protected]>

Fwd: Statik 6 Ruas Tol Dalam KOta_Edisi Terkahir. Moch Ichsan 8 Desember 2017 15.00 Kepada: [email protected] Cc: Prasetyo Enggar Wibisono <[email protected]>, citra boonastria , sesde asrul <[email protected]>, DHL_EXPRESS , Alfa Ika Putra Kepada Yth: PT CGA Up. P'Panca di tempat Perihal : Lanjutan tanggapan mengenai lokasi dan ketinggian chamber Dengan hormat, Bersama ini kami kirimkan, tanggapan dari Beton Perkasa W.

terkait hasil analisis struktur material

Formwork/bekisting, yaitu sebagai berikut: 1. hal 2 ---> sdh direvisi 2. hal 4 ---> a. Ok....sudah ditambahkan. b. pemodelan seperti "SPRING" pada titik yg ditinjau sudah memperhitungkan hanya beban vertikal saja karena ada joint baut. c. plywood dianggap tegak lurus dan menahan beban merata karena struktur analisis properties plywood dihitung permeter. 3. hal 5 ---> Ok...sudah ditambahkan. 4. hal 6 ---> a. Ok...sudah ditambahkan. b. q2 : 6.349 kg/m' ----> analisis concrete load dg H = 2,862 m pada posisi ujung steelwale yg kita tinjau utk beban max. (terlampir) 5. hal 7 ----> a. Ok...sudah ditambahkan. b. Rasio 0,99 % utk PD8 ---> kami hanya meninjau dititik-titik yang terjadi beban maksimal (terlampir). 6. hal 8 ----> Ok....sudah ditambahkan. 7. hal 9 ----> Ok....sudah ditambahkan. 8. hal 13 ----> Ok...sudah ditambahkan. 9. hal 14 ----> Ok...sudah ditambahkan. 10.hal 16 ----> Rasio 0,99% utk RORO ----> Satuan yg ditinjau diganti menjadi (Kg)...utk rasio tersebut, kami sudah memperhitungkan dengan > SF, sehingga seharusnya di beban Max 39,55 Kg masih aman. 11. Catatan : a. pemodelan perletakan sebagai " SPRING" pada titik yg ditinjau sudah memperhitungkan hanya beban vertikal saja karena ada joint baut. b. Defleksi pada Beam 800/300-24000 (Box) yang secara langsung berpengaruh terhadap kekakuan PD8, memang sudah sepakat sesuai Kick Of Meeting ke 2 bahwa rencana ada perlakuan "CHAMBER", posisi yang akan di Chamber adalah pada Head Spindel PD 8 penambahan setinggi 4,3 cm. c.untuk gambar sudah ditambahkan. d. Analisis ijin lendutan untuk semua Beam Normal seharusnya nya L/400, dikarenakan kondisinya beam kantilever yang seharusnya digunakan ijin 2L/360 ( buku Daftar Konstruksi Baja PT.Pradnya Paramita ) tapi kami menggunakan 2L/400 dikarenakan untuk menambah safety factor. https://mail.google.com/mail/u/0/?ui=2&ik=de7f2a5e58&jsver=4iaUdNHwFzk.id.&view=pt&msg=160352393eaa611e&q=beton%20perkasa&qs=tru… 1/3

1/8/2018

Gmail - Fwd: Statik 6 Ruas Tol Dalam KOta_Edisi Terkahir.

Terimakasih.

Dari: Eko Supriyanto Walidi Dikirim: 06 Desember 2017 14:19:17 Kepada: [email protected] Cc: Shandy Prabowo; Edy Daryaka; Tri Yono; Faizah Nurbaiti; Didin A. Dharma; Yudi Purnomo Subjek: Statik 6 Ruas Tol Dalam KOta

Dear. Pak. Ichsan

Terimakasih sudah kasih masukan ke PT.BPW terkait hasil analisis struktur material Formwork/bekisting. Berikut ini kami sampaikan beberapa feed back dari PT.BPW, antara lain : 1. hal 2 ---> sdh direvisi 2.hal 4 ---> a. Ok....sudah ditambahkan. b. pemodelan seperti "SPRING" pada titik yg ditinjau sudah memperhitungkan hanya beban vertikal saja karena ada joint baut. c. plywood dianggap tegak lurus dan menahan beban merata karena struktur analisis properties plywood dihitung permeter. 3. hal 5 ---> Ok...sudah ditambahkan. 4.hal 6 ---> a. Ok...sudah ditambahkan. b. q2 : 6.349 kg/m' ----> analisis concrete load dg H = 2,862 m pada posisi ujung steelwale yg kita tinjau utk beban max. (terlampir) 5. hal 7 ----> a. Ok...sudah ditambahkan. b. Rasio 0,99 % utk PD8 ---> kami hanya meninjau dititik-titik yang terjadi beban maksimal (terlampir). 6. hal 8 ----> Ok....sudah ditambahkan. 7.hal 9 ----> Ok....sudah ditambahkan. 8.hal 13 ----> Ok...sudah ditambahkan. 9.hal 14 ----> Ok...sudah ditambahkan. 10.hal 16 ----> Rasio 0,99% utk RORO ----> Satuan yg ditinjau diganti menjadi (Kg)...utk rasio tersebut, kami sudah memperhitungkan dengan > SF, sehingga seharusnya di beban Max 39,55 Kg masih aman. 11. Catatan : a. pemodelan perletakan sebagai " SPRING" pada titik yg ditinjau sudah memperhitungkan hanya beban vertikal saja karena ada joint baut. b. Defleksi pada Beam 800/300-24000 (Box) yg secara langsung berpengaruh terhadap kekakuan PD8, memang sudah sepakat sesuai Kick Of Meeting ke 2 bahwa rencana ada perlakuan "CHAMBER" c.untuk gambar sudah ditambahkan.

Demikian hasil reportase team PT.BPW, Salam, EKO https://mail.google.com/mail/u/0/?ui=2&ik=de7f2a5e58&jsver=4iaUdNHwFzk.id.&view=pt&msg=160352393eaa611e&q=beton%20perkasa&qs=tru… 2/3

1/8/2018

Gmail - Fwd: Statik 6 Ruas Tol Dalam KOta_Edisi Terkahir.

STATIK 6 RUAS TOL DALAM KOTA (faizah) (review comments).docx 1425K

https://mail.google.com/mail/u/0/?ui=2&ik=de7f2a5e58&jsver=4iaUdNHwFzk.id.&view=pt&msg=160352393eaa611e&q=beton%20perkasa&qs=tru… 3/3

Review Bekisting Pier Head

PROJECT

Doc No.

IFR_01_BEKISTING_PH

PREP

Date

08 Desember 2017

APVD

DALAM KOTA PAN

REV - 01

REVIEW SHEET Document Title :

Pierhead static calculation

Document Reference/Date :

STATIK 6 RUAS TOL DALAM KOTA (review comments)

Submitted by/Date :

BETON PERKASA/06 – 12 - 2017

Review Comments

No

Reference

1

Halaman 2

2

Halaman 4

Review Comments Agar dicantumkan mutu/spesifikasi material properties yang digunakan - Harap mencantumkan gambar shoring beserta posisi yang dianalisis, sehingga konsep perhitungan lebih jelas - Asumsi analisis perletakan seharusnya dimodelkan sebagai spring yang memiliki kekakuan vertikal dari shoring sehingga jika diasumsikan sebagai sendi kurang tepat - Berdasarkan pemasangan plywood tidak tegak lurus tetapi sesuai dengan kemiringan terhadap penampang pier head sehingga beban merata yang dimasukkan apakah sudah dimasukkan sesuai tegak lurus terhadap penampang pier head

Review Status O k OK

O k

O k

3

Halaman 5

Harap mencantumkan gambar shoring beserta posisi yang dianalisis, sehingga konsep perhitungan lebih jelas

O k

4

Halaman 6

- Harap mencantumkan gambar shoring beserta posisi yang dianalisis, sehingga konsep perhitungan lebih jelas

O k

Pembangunan Tol Dalam Kota DKI Jakarta

1

Review Bekisting Pier Head

PROJECT

Doc No.

IFR_01_BEKISTING_PH

PREP

Date

08 Desember 2017

APVD

No

5

Reference

Halaman 7

6

Halaman 8

7

Halaman 9

8

Halaman 13

9

Halaman 14

10 Halaman 16

Pembangunan Tol Dalam Kota DKI Jakarta

DALAM KOTA PAN

Review Comments - q2 = 6.349 kg/m’ agar diberi keterangan akibat beban apa - Harap mencantumkan gambar shoring beserta posisi yang dianalisis, sehingga konsep perhitungan lebih jelas - Kontrol shoring PD8 : Rasio 0.99 !!! → rasio mendekati 1, tambah shoring dengan desain rasio sekitar 0.7 agar direview ulang terkait dengan desain shoring Harap mencantumkan gambar shoring beserta posisi yang dianalisis, sehingga konsep perhitungan lebih jelas Harap mencantumkan gambar shoring beserta posisi yang dianalisis, sehingga konsep perhitungan lebih jelas Harap mencantumkan gambar shoring beserta posisi yang dianalisis, sehingga konsep perhitungan lebih jelas Harap mencantumkan gambar shoring beserta posisi yang dianalisis, sehingga konsep perhitungan lebih jelas Satuan apakah betul kg/cm2 Rasio 0.99 !!! → rasio mendekati 1, tambah shoring dengan desain rasio sekitar 0.7

REV - 01

Review Status

O k

O k O (Analisis dengan load k factor) O k O k O k O k (Analisis dengan load factor)

2

Project :

No Offer :

-

6 RUAS TOL DALAM KOTA Subject :

Sheet no :

Pierhead Static Calculation Area :

Date :

Pier Head I.

1 of 20 Desember 8, 2017

Rev :

0

TECHNICAL DATA

Concrete Forms Specialist in Indonesia since 1985

Project :

No Offer :

-

6 RUAS TOL DALAM KOTA Subject :

Sheet no :

Pierhead Static Calculation Area :

2 of 20 Date :

Pier Head

Desember 8, 2017

Rev :

0

II. MATERIAL PROPERTIES

PLYWOOD 18 mm :

100 18

b Ax Ix Wx Sx Δ max E σ ijin τ ijin

100 180 48.60 54.00 40.50 L/400 100,000 161 12

cm cm2 cm4 cm3 cm3 kg/cm2 kg/cm2 kg/cm2

GIRDER GT 24 : b Ax Ix Wx Sx Δ max E σ ijin τ ijin

8 24 8000 700 525 L/500 100,000 100 12

DOUBLE STEELWALE : b Ax Ix Wx Sx Δ max E σ ijin τ ijin

15.2 46

1893.92 189.39 115 L/400 2,100,000 1,600 928

cm cm2 cm4 cm3 cm3 kg/cm2 kg/cm2 kg/cm2

cm cm2 cm4 cm3 cm3 kg/cm2 kg/cm2 kg/cm2

CROSS BEAM 400x400x13x21 : b Ax Ix Wx Sx Δmax E σ ijin τ ijin

1.3 214.54 65,361.58 3,268.079 2,178.72 L/400 2,100,000 1,600 928

cm cm2 cm4 cm3 cm3 kg/cm2 kg/cm2 kg/cm2

Concrete Forms Specialist in Indonesia since 1985

Project :

No Offer :

-

6 RUAS TOL DALAM KOTA Subject :

Sheet no :

Pierhead Static Calculation

3 of 20

Area :

Date :

Desember 8, 2017

Pier Head

Rev :

0

LONG BEAM 800 x 300 x 14 x 26 – box 12 mm (Tumpuk) :

b Ax Ix Wx Sx Δ max E σ ijin τ ijin

3.8 886 2,157,067.63 17,975.56 6526 L/400 2,100,000 1,600 928

cm cm2 cm4 cm3 cm3 kg/cm2 kg/cm2 kg/cm2

LONG BEAM 800 x 300 x 14 x 26 – box 12 mm : b Ax Ix Wx Sx Δ max E σ ijin τ ijin

3.8 443.02 369701.788 9,242.544 6,161.70 L/400 2,100,000 1,600 928

cm cm2 cm4 cm3 cm3 kg/cm2 kg/cm2 kg/cm2

III. CONCRETE LOAD

CONCRETE LOAD q1 Concrete + ML Live Load Formwork

: : : :

2400 kg/m3 100 kg/m2 200 kg/m2

x

3.5

Total

m

= = = =

8,400 100 200 8,700

kg/m2 kg/m2 kg/m2 + kg/m2

COMBINATION LOAD = 1.2 DL + 1.6 LL = 10,480 kg/m

Concrete Forms Specialist in Indonesia since 1985

Project :

No Offer :

-

6 RUAS TOL DALAM KOTA Subject :

Sheet no :

Pierhead Static Calculation Area :

4 of 20 Date :

Pier Head

Desember 8, 2017

Rev :

0

IV. STRUCTURE ANALYSIS

FRONT VIEW

SECTION VIEW

KONTROL PLYWOOD: Properties : q = 10,480 kg/m2 x 1 m = 10,480 kg/m’ Based on STAAD.Pro 2004 calculation :

Concrete Forms Specialist in Indonesia since 1985

Project :

No Offer :

-

6 RUAS TOL DALAM KOTA Subject :

Sheet no :

Pierhead Static Calculation Area :

5 of 20 Date :

Pier Head

Desember 8, 2017

Rev :

0

LOAD & SUPP. REACTION

BENDING MOMENT

SHEAR FORCE

DISPLACEMENT Nb : Jarak antar tumpuan (girder) diubah menjadi 0.2 m Concrete Forms Specialist in Indonesia since 1985

Project :

No Offer :

-

6 RUAS TOL DALAM KOTA Subject :

Sheet no :

Pierhead Static Calculation Area :

6 of 20 Date :

Pier Head

Desember 8, 2017

Rev :

0

KONTROL GIRDER:

Properties of Girder, q = 10,480 kg/m2 x 0.2 m = 2,096 kg/m’ Based on STAAD.Pro 2004 calculation :

LOAD & SUPP. REACTION

BENDING MOMENT

Concrete Forms Specialist in Indonesia since 1985

Project :

No Offer :

-

6 RUAS TOL DALAM KOTA Subject :

Sheet no :

Pierhead Static Calculation

7 of 20

Area :

Date :

Desember 8, 2017

Pier Head

Rev :

0

SHEAR FORCE

DISPLACEMENT KONTROLSTEELWALE :

q1

:

Concrete + ML Live Load Formwork

: : :

2400 kg/m3 100 kg/m2 200 kg/m2

x

3.5

m

= = = =

8,400 100 200 8,700

kg/m2 kg/m2 kg/m2 + kg/m2

m

= = = =

6,720 100 200 7,020

kg/m2 kg/m2 kg/m2 + kg/m2

Total COMBINATION LOAD = 1.2 DL + 1.6 LL = 10,480 kg/m

q2

:

Concrete + ML Live Load Formwork

: : :

2400 kg/m3 100 kg/m2 200 kg/m2

x

2.8

Total COMBINATION LOAD = 1.2 DL + 1.6 LL = 8,465 kg/m q1 = 10,480 kg/m2 x 0.75 m = 8,725 kg/m’ q2 = 8,465 kg/m2 x 0.75 m = 6,349 kg/m’ Based on STAAD.Pro 2004 calculation :

Concrete Forms Specialist in Indonesia since 1985

Project :

No Offer :

-

6 RUAS TOL DALAM KOTA Subject :

Sheet no :

Pierhead Static Calculation Area :

8 of 20 Date :

Pier Head

Desember 8, 2017

Rev :

0

LOAD & SUPP. REACTION

BENDING MOMENT

SHEAR FORCE

DISPLACEMENT Concrete Forms Specialist in Indonesia since 1985

Project :

No Offer :

-

6 RUAS TOL DALAM KOTA Subject :

Sheet no :

Pierhead Static Calculation Area :

9 of 20 Date :

Pier Head

Desember 8, 2017

Rev :

0

KONTROLSHORINGPD-8 4992 kg

6606 kg

7954 kg

5934 kg

Properties : Reaction Steel Wale = 7,954.53 kg

KONTROL CROSSBEAM (400 x 400 x 13 x 21)

Properties : q = 10,480 kg/m2 x 1 m = 10,480 kg/m’ Based on STAAD.Pro 2004 calculation : Concrete Forms Specialist in Indonesia since 1985

Project :

No Offer :

-

6 RUAS TOL DALAM KOTA Subject :

Sheet no :

Pierhead Static Calculation Area :

10 of 20 Date :

Pier Head

Desember 8, 2017

Rev :

0

LOAD & SUPP. REACTION

BENDING MOMENT

Concrete Forms Specialist in Indonesia since 1985

Project :

No Offer :

-

6 RUAS TOL DALAM KOTA Subject :

Sheet no :

Pierhead Static Calculation Area :

11 of 20 Date :

Pier Head

Desember 8, 2017

Rev :

0

SHEAR FORCE

DISPLACEMENT

KONTROL LONG BEAM 800x300x14x26 mm (Tumpuk)

FRONT VIEW

SECTION VIEW Concrete Forms Specialist in Indonesia since 1985

Project :

No Offer :

-

6 RUAS TOL DALAM KOTA Subject :

Sheet no :

Pierhead Static Calculation Area :

12 of 20 Date :

Pier Head

Desember 8, 2017

Rev :

0

Properties : IWF 800x300x14x26 - Box 12 mm (Tumpuk) q

= 10,480 kg/m2 x 1.9 m = 19,912 kg/m

Based on STAAD.Pro 2004 calculation (Double Long Beam) :

Based on STAAD.Pro 2004 calculation (Single Long Beam) :

Concrete Forms Specialist in Indonesia since 1985

Project :

No Offer :

-

6 RUAS TOL DALAM KOTA Subject :

Sheet no :

Pierhead Static Calculation Area :

13 of 20 Date :

Pier Head

Desember 8, 2017

Rev :

0

LOAD & SUPP. REACTION

BENDING MOMENT

SHEAR FORCE

DISPLACEMENT

Concrete Forms Specialist in Indonesia since 1985

Project :

No Offer :

-

6 RUAS TOL DALAM KOTA Subject :

Sheet no :

Pierhead Static Calculation Area :

14 of 20 Date :

Pier Head

Desember 8, 2017

Rev :

0

Untuk menghindari lendutan yang terlalu besar, maka sebaiknya di champer setingi nilai displacementnya 43 mm

DETAIL “A”

KONTROL SAMBUNGAN IWF 800X300X14X26 BOX 12 MM

Gaya yang bekerja pada sambungan: Mmax

= 11,201,150.38 kg.cm

Dmax

= 58,429.669 kg

Sambungan menggunakan baut Pelat penyambung tebal 20 mm Dipakai baut Ø24 mm Grade 8.8 Proof Stress

= 600 N/mm2 = 6000 kg/cm2

Jarak baut: Tengah 2.5 d ≤ u ≤ 7 d 2.5 (24) ≤ u ≤ 7 (24) 60 ≤ u ≤ 168

dipakai jarak u = 125 mm Concrete Forms Specialist in Indonesia since 1985

Project :

No Offer :

-

6 RUAS TOL DALAM KOTA Subject :

Sheet no :

Pierhead Static Calculation Area :

15 of 20 Date :

Desember 8, 2017

Pier Head

Rev :

0

Tepi 1.5 d ≤ S1 ≤ 3 d 1.5 (24) ≤ u ≤ 3 (24) 36 ≤ u ≤ 72

dipakai jarak S1 = 62 mm

Perhitungan terhadap titik puncak N1 = 8.82

= 77.44 cm2

N2 = 21.32 = 453.69 cm2 N3 = 33.82 = 1142.44 cm2 N4 = 46.32 = 2143.69 cm2 N5 = 58.82 = 3457.44 cm2 N6 = 71.32 = 5083.69 cm2 N7 = 88.52 = 7832.25 cm2 N8 = 101.32 = 10261.69 cm2 N9 = 113.82 = 12950.44 cm2 N10= 126.32 = 15951.69 cm2 N11= 138.82 = 19265.44 cm2 N12= 151.32 = 22891.69 cm2 Σy2

= 101,434.15 cm2

Tegangan Tarik maksimum untuk 1 baut N

= (M x Y1)/ Σy2 = (11,201,150.38 kg.cm x 151.3 cm) / 101,434.15 cm2 = 16,707.73 kg

Untuk 1 baut

= 0.5 x 16,707.73 kg = 8,353.87 kg

σ Tarik baut

= 8,353.87 kg / (1/4 x π x d2) = 8,353.87 kg / (1/4 x π x 2.42) = 1,846.55 kg/cm2 < 0.7 x 6,000 kg/cm2 = 4,200 kg/cm2

Concrete Forms Specialist in Indonesia since 1985

Project :

No Offer :

-

6 RUAS TOL DALAM KOTA Subject :

Sheet no :

Pierhead Static Calculation Area :

16 of 20 Date :

Desember 8, 2017

Pier Head

Rev :

0

Akibat gaya Lintang Sambungan iris tunggal 0.393d = 0.393 x 2.4 = 0.94 < δ = 1.0 Geser menentukan τ

= D/F = 58,429.669 kg / (24 x 1/4 x 3.14 x 2.42) = 538.430 kg/cm2 < 0.58 x 6,000 kg/cm2 = 3,480 kg/cm2 𝜎𝜎= I𝜎I + 1.56𝜎I 𝜎𝜎= I1,846.55 I + 1.56(538.430 )I = 1,965.20 kg/cm2 ≤ Proof Stress = 6,000 kg/cm2 ……………………………. OK

KONTROL LONG BEAM 800 x 300 x 14 x 26 – box 12 mm Properties : P = 144,850 kg/m Based on STAAD.Pro 2004 calculation :

Concrete Forms Specialist in Indonesia since 1985

Project :

No Offer :

-

6 RUAS TOL DALAM KOTA Subject :

Sheet no :

Pierhead Static Calculation Area :

17 of 20 Date :

Pier Head

Desember 8, 2017

Rev :

0

LOAD & SUPP. REACTION

BENDING MOMENT

SHEAR FORCE

DISPLACEMENT KONTROLCROSSBEAM (400x400x13x21box10mm) Properties : q = 79, 091 kg/m Based on STAAD.Pro 2004 calculation :

Concrete Forms Specialist in Indonesia since 1985

Project :

No Offer :

-

6 RUAS TOL DALAM KOTA Subject :

Sheet no :

Pierhead Static Calculation Area :

18 of 20 Date :

Pier Head

Desember 8, 2017

Rev :

0

LOAD & SUPP. REACTION

BENDING MOMENT

SHEAR FORCE Concrete Forms Specialist in Indonesia since 1985

Project :

No Offer :

-

6 RUAS TOL DALAM KOTA Subject :

Sheet no :

Pierhead Static Calculation Area :

19 of 20 Date :

Desember 8, 2017

Pier Head

Rev :

0

DISPLACEMENT KONTROL RORO SHORING

Reaction dari Cross Beam : 39,545 kg

Allowable Load : Allowable Load (Reaksi) = 39,545 kg < Load Capacity = 40,000 kg ......................... OK

Concrete Forms Specialist in Indonesia since 1985

Project :

No Offer :

-

6 RUAS TOL DALAM KOTA Subject :

Sheet no :

Pierhead Static Calculation Area :

20 of 20 Date :

Pier Head

Signature : Name : Date :

Rev :

Desember 8, 2017

Approved By :

Check By :

Made By :

YUP Des 08, 2017

MIZ Des 08, 2017

FN Des 08, 2017

0

Concrete Forms Specialist in Indonesia since 1985

LAMPIRAN 2 Detail Gambar Pier Head

ex

f I

I,

II

I t I'

J

'

0

'

! I

I•

I

t

l

•I £

Si i! i

s .... 0

I

j

• I

II

"--'' < .... Cl

:1 r

l H ii

-

I l

Ill

I

J

l 1I

-

.&.

_).

A

z 0

:c

,

,

<;)

""'"q"

<;) q

q

,

,

, ,

<;) ,q

I>

q

q

""'

_ ; ; 1 :.'\,..

....,!?"'

0

q

<;)

co

I>

,

q

0 o_

q

,

LL <;} I>

0

q

q

3 -

I>

q

""

0

<;)

"l,

-

,

q

q

,

l/)

q

<;)

w

'

> o_

-

_;;1:.'\,..

""

It""

I0

============== ======]1=========------------------------- --------

- -- ·-

jr

I

--

I

I

KUPING

893

- ••••..

r ..... I 1scr1

-'1 750

I

---

L

I

'---.

7:iO

LAT KUPINGAN

.-o-:

Fv F/ .!....

I I

--

7:iO

.lOOO

TAMPAKATAS "l

r-

200

1295

200

-

873

IFTING POINT

\

/IFTING POINT

a •o• o

PLAT KUPINGAN

645

Bl

1305

813

101

1<1

1

PlJ KUPINGAN

\

!0\

BEAM 400x300x13x15 T210

I

655

Jltrl 4

.....

4

,.J

Bj

LAT 10 MM (STIFFENER)

TAMPAK DEPAN ENTRALING LOAD DIA. 50 MM

HEX NUTIA 12 D il.AS •LUIIANG 0 14

H'TB

I

- f--.!

§ Sol M 16x100W h ,._ul 1.416

·

1-

/

..2!L_

IFTING POINT

{i oor;

LAT 10 MM (STIFFENER ) I

l

B-8

I

JUML.AH KEBVTUHA N :4 PCS

P8.55

--'I

-'1

.....

BERAT SEKITAR :516 KG I UNIT NON BOX

-·· -· -•0

. ' I

1--...-...._

-

PTBETON PERKAI.\v,JJAK SANA

I

LEVEL 1 CROSS BEAM 400x300, L:3M (NON BOX)

I

Ct'«HA'G RUAS TOl'M611tPf'IO

.

R .- ,. a.

iw.1

t

.7

- T 1111t

t ALIAS Tot. TAHW 1

I

QTY: 80 Pes

eot.<'AH't PAOJECT

K80J4Yiw\0Ht

.,_

.".". ...

f - -- f-!S

.._..., ,

" ''"

SUBJECT

I

BEAM 400X..OO L3M

....

f11111101

.._...,, f'ortl./201

:tlllt/Zot I

SYSTEM AIOAO SttOfUNOSY8T£M

. - - ......

.• .

·--

..... I""".... I""'"""' IOioo"'l""':::"" -:. ;;..;;.!:': ;.:· :..;:.:; I 160 101 1 ....., --...-• .... - --

I

I

I

O\SN.LinDfF"ER\2017\BP001'01t -JN
l

I

I

PlAT SI(U TEBAL 5 ltoi..M 0LAS • lUBNfG OVAL 9 t4

PLAT S1
UBANGBOI..T024

-

ru

jf

I

I

(LAHMM

l.BANG DOl.T 0 2"

(KU NGAN)I

.IJDN4G 001.10 2<4

I

-:t:::: :

:

I

I

it

I

:

I

:

703 •



3500

I•

3602

I'

'

I

2m

I er:z-.::::

T5MM(KUANGAN)

I.

UBN«ii DOLT 0 24

I

3500

I

I•

l£d 735 • I

TAMPAKATAS t-

I-

....

·C

r

,:," =======r======

70

cro



I

r===

I

I

'ftL.AT KUPIHGAH LA8RANG.AN,..,

r"r;f::

I

====

=======r======

.

1,

"""

.---

====

==

.,...,

I

"""

I )... \

\_

TAMPAK DEPAN

-

=======T=======r

111ol\

2111\1)

\00

LJ.,

A.AT SIKU 70X 70 • Ll.IBA.'IG OVAL 0 14

=======T======

100

I

JOO

rc

'1JJJ1

I

"'

PLAT KUPINCAN LABRAHG..trN J 2m Jill

PlAT $loW 70X 70 •LUBNfC OVN.. 0 14

300

V'

GPONT

,.3-00--

,-l!!L LATTfB"'-12MM(UfBOX)

TEB"'-

12 ....(UfBOX)

8

KUPINGAH)

-- ----\.

LUBAHG OVAl 0

r--- 1 II -,.

Iii

LAT

t WBAMJ C71N.. 0 14

L

4o.f"'.,.. rf--L-L.J-

-

£

\

1.-- 1-L-...!!!....

JUM..A H KEBUTUHAN ·4 PCS

P8.55

MM (BAAQHG) PlAT $ MM

7'0X TO

L...l!!L

IOOJOCIOxMx21S

•L.......,«l0W•..0u

P!..ATSti(U1QX70

IOOJOOOxMQG



Pl.ATSII(lJ7QX70

PLAT SIOJ ·LtJBAHG OVAL"

.....

L-. !! !....

t

1

A-A

TSW1QX70

Iii

BERAT SEKJTAR :4540 KG I UNIT

!':!'.

SPAN BEAM ATAS+BAWAH DIRANGKAI01 W OOOX rel="nofollow">00oi4X20

...._.a

...... R fl tt io " C

OPCKP•

LEVEL 3 SPAN BEAM BAWAH 800x300 L:12 M, BOX SPEC. QTY : 20 Pes

I

Re..onA

I>"""""Rt.MS TOI..._,...,

I

I .o...,. :..'!!! .:: .: AKSANA So-.. Ka 11.7

ca..-.T...-.g

t l71t

KSO JAYA..NJH I FaJAS TtX. TAHAP 1

I

"' ";:;;-n;;;o;...-tl· ::-;,...-..

:avsrr.. ."""" - a .· _, tt60

I

I

IG f(A'\2017'o1PoolOlO-.JN(J.iffA

DWDAO 101

,-...,o-..1"":""

..NERR»ttAOAO'OWOPilRHUON-OWO

.;- . --- --b ·:;_-•-::!. .

.

I

=

("''t""'KU"Ht:)l

LUBAHO IJHTUK K'l.I
nr

I

I I

I

-

I

I

LUBANG UNT\JK

k\JKU MACAN CJIO

I

I

I .UBAHG DOlT O&A..lC

...,

I

1100

I

440

I

I



JJBAl
j..UilAN
.UONfG DOlT CIA.2'

.lJBANG BOlT OIA.2'

110 J

:

dl1

I

4<0

u



I

.

I

- --

I

:

""'

I

I

I

1100

I

I

I

..,

[

........

3500

I•

...,

F :::=u

T 5 MM (KUPINGAH)

703 •

I

110J



3602

I



3500

I

I •

735 •

TAMPAKATAS

c

4

"""'

"""'

11140

c

20110

1140

12000

l.o ...,.

'-Al.o

...

·

r-!1

¥"''"-

L. AT 20 MM

J !il t-:

"""'

-.:;e

20

l-<:

TAMPAK DEPAN HEXNUTM12 OLAS •LL.eAH00 14 NTRHJHG LOAD CIA.50MM

NTRJrUNG llli'O

NTftJIUNG la-.D

Nl'RAl.ING LOAD OtA 50 MM

CIA 50 ....

OIA.!O MM

·T-.QPQHT

!I

r<'

2lJ7

"""'

FTING PONT

T 5 MM (KUPI:NGAN)

- ·..

......

r"r;C

r"-

-·· 7000

VT

,J!!ILATTEBH..12Woi(UIBOX)

TEBH.. 12 MM (Uti!IOX)

J..-J-w'F

1001000x14x2'G

....

PLAT 5 ...,. KUPIHOAH)x

!i! !II

LAT

!I

!i!

lAM (BRJONO)

800J000x t-41lle

IDOJOOOxMJC215

P8.55 JUMLAH KEBUTUHAN :4 PCS

L-...,!!!!._

IIOChaOOx,..,.

IJ!!..... &II

c.c

IJ!!..... l>
BERAT SEKITAR :4540 KG I UNIT

-·..

- SPAN BEAM ATAS+BAWAH DIRANGKAI 01WQ>Js

......... LEVEL 3 SPAN BEAM ATAS 800x300 L:12 M, BOX

._

OPCKP.

I

I !'. ! .!:.

SPEC.

AKSANA I>'IOIA RUA5 TOI...........

I

QTY: 20 Pes

Jl ......................... 10 .1

CA ·T I,7'11 KSOJAYJ,..NJH tQOr

S RUAI TCl TNiNJ I 1 .1

I· &YO T E M

I

I

........

O·\I.AUI'OfFERUOt7'18P00705 • JNCARTA INN(RRJfO PON:IOWOPI[RHUO M,.fiNO

'-'-"

1'-UBANG BOLT DIA.24

1000

20

If)

r--

g,....,

ta

II

I If)

r--

TAMPAKATAS ...

I-

LUBANG BOLT DIA.24

1000 ;OPENING

20 ftLAT 20 MM

.--11 MM ttl9-------. 0 0

0

,....,

88 1 "

co,

,...., , If)

.... < 0

ol

800

20

l

WF 800x300x14x26 8-8

TAMPAK DEPAN I

TAMPAK SAMPING

..... P8.55 JUMLAH KEBUTUHAN :4 PCS BERAT SEKJTAR :2.270 KG I UNIT SPAN BEAM ATAS+BAWAH DIRANGKAI 01 ()SHOP CKP R"'-GnO

LEVEL 3 SPAN BEAM BAWAH 800x300 L:1 M, BOX SPEC.

......,.c A""*"' I Re-MbnA

Qty: 40 Pes

I,

I

I·- ·..· ....-......

PT BETON PEJ\1\u W JAKSANA

RUAS TOl png

A R.-,. S.JWtQ Km. 'IJ

c ...,. ·T....-v Ut CONI'NfY I ICSOJAY.a...ADHI PROJECT I s fiJAS Ta. TAHAP 1

.,_

1 ----.:!!.

""""

SP» BE.AMIOOCbOOO L.e M. eox_SPEC

IULECT

2 \tr

120111/lOI

low"

21111Q01 11111001

T

I

I

LUBANG UNTUK KUKU MACAN 010

UBANG BOLT DIA.24

1545

I !

UBANG BOLT DIA.24

4 40

1060

1300

l

440

455

1060

'-t.l TING POINT I

f.+-

2(XX)

II

I

'!.IF NG POINT

Y'

'

I )!2

20()(

2(XX)

i

1145

2(XX)

-

I

,...-i.IF1 NG POINT •

I 40

--

1000

20 )!2

I

f

A lnlNG POINT •

440

l

jY F 800xjx14x26

1

UBANG BOLT D A.24

UBANG BOLT DIA.24

440

r-

5000

TAMPAKATAS

I I

Al

Al

1565

1500

440

1300

I .. n

·

440

456

1060

440

UT M 8 DILAS DALAM BO

POINT

/W F800x3C x14x26

-L--
.

T20MM

r-

PLATT:10 T BMM(BRACING)

...8 .

:;!

:5:

W

PLATT'10 MM-._

16 TB MM (BRACING)

-

J

I

I -·

w PLATT. 0MM-, 1

440 IJOO

·

PLAT 20 MI.+-..,

B

...8

Y

_,.A-U BANG BOLT DIA.2
!--+------, I-t-:6 iii!

r xr uBANGBOLTDIA.24 80

""'ENING

1

2(XX)

I

1000

l4a

:roocJ

I

2000

A+'

H li!! l•

I I>Q/

D!>r-UBANGBOLTDIA.24

n

I

2<XXl

6""

20

I

I

845

A+'

B

5000

TAMPAK DEPAN '

HEX NUT M12 DILAS + LUBANG 014

NTRALING LOAD

.... rtNTRALING LOAD

60

'

I

!ill

_....::: 8



---;;_

VT

JUMLAH KEBUTUHAN :4 PCS

.60

_.......-{.IFTING POINT

If

J..

TEBAL 12 MM (UI BOX )

LATBMM (BRACING)

V"- --wF 800x300x14x28

...

SPAN BEAM ATAS+BAWAH DIRANGKAI DIV!) KSHOP CKP•

-t-7t-::::::

:2

r=

n

o-

N

o . - ..lQ!L-

JOO

A·A

8-8

BERAT SEKITAR :2.270 KG I UNIT

MM T 20 MM

i5l ;:

V S:

i!! •

I-wF t 800x300x14x26

R.-no Revt.onC 1 ._ +------------------j .-

t-._ ,+------------------------------ 1 -

I

I

,PT

0"'\KHA'e RUAS TOl png

............W BET,a OcN•.p,..... UoAKSANA .,.n

Jl A..,. s._,.,K.._.\1

c .T-. COWAHY

,

LEVEL 3 SPAN BEAM ATAS 800x300 L:6 M, BOX SPEC.

PROJECT

::::::,..,._ aox_am:

:::::

O.d.d --;;-_,......

SUBJECT

Qty: 40 Pes



ICSOJAYA..ADHI

SYSTEM

ROAO!HORfoiGSYSTEM

-- 1.

.....

1111401

""""'

---

,1 .,_... 1 -:: : .. -":""'".;':.::'

1 160

I

--- ------ ---- -

_l

J G>\SALES'DffER\Zo11\8POO - -

101

I

I

oo

TAHN£RRf!IORCW)'OWGPIERHEAD66 G

-4l· :S..

----

,

(

[

1363

I

1500

2420

m

o=..ou
V

PlAT10M

1500 I

T10MM

! ...-

r-

,h eoo

I

49rl

I

:;;;h

H , -'1 l EI

j;!

I

I

I

··-··

1217

I

,...+ ,rt

I

lJJ

·····- - ··--·····--·························· ········ El

----,

J,

r::f

-"1 11!:!1

eoo

1-"1

l<; l 490

8000

TAMPAKATAS HEX NUT M12 OILAS + LUBANG 0 14

I

\

NUT M12 DlLAS. LUBANG 014

I-

f-

c..,

c.., 1m

A.

470

ll5o BOO

580

750 190

19'o

C.., I

r800x300x14x26

1\

I

750

I

7501

iFTING POINT

1290 800

.

470

I fLAT10MM

I

TKL 1NGAN

B+

A.,

750

PlAT 10M

HEX

Kl.PINGAN

:

'

'

1217

J



/J

?J .

1500

\

1\

PLATSIKU70X70HUBANGOV1.1.014

1l

l

/

I

1500

\'o..-J

T 10 MM(STIFFENER)

I

C..-J

\

I

11000

1363

a+

'PlAT 10 MM(STIFFENER)

/

B

TIOMM(STIFFENER)

TAMPAK DEPAN DJA.50MM

.

NTRALING LCWl

FTING POINT

...

CROSSBEAML•BM

JA.50MM

050MM CENTRAUNG LOAD P8.55

j;TRALJNG LCWl

JUMLAH KEBUTUHAN .2 PCS

!

L

Rr 'I

-t--l£ _.

!

L

/v 1

_.RLAT12 MM (80X)

/v 1

r TSII
l

J= =t =l 300 "e' N

_.RLAT 12MM(BOX )

r TSIJ
li:r

,.. ..:H-lf-+v-i'{ATKUPINGAN

K

\

I

.l.J::i!-1-

·rr

Ill

r

-c

)-.......,_o-+ ------------------------------------------- 1

1----"+ ----------------------------------- 1 .........

X 300

BERAT SEKJTAR: 1680 KG I UNIT ( BOX )

T 12MM( BOX)

300

"'

N

-

X PlAT SIJ
O'tCHA'eAUM ra........-..P'O

,__.,.......

.,.,....t,.

.aRa-yll•...-.o.:....-.,

c.._.. .t.....,.*" cx:»>PNfY

LEVEL 2 CROSS BEAM 800x300 , L:8M (BOX) QTY : 20 Pes

I

lr==:::!::======;-o:TRrnv:i'i PT BETON P_.A WIJAKSAHA

X-X -

PRQIECT

ICSO JAYA.-NH

:;:.:::.l...._IO(C

SUBJECT

.YO"'" RORDOHORI
--

::P!!+::::li!J•d

0.

..........r;;r;-_-,.r, O.c:t.d

?' -

1..1

10'01

l0/1

2VI HIOt

=::

1

I _

_ _. 1

I

.......... 1'1_1_ , 1.....- ':;o. "::"...:,.:-....-.: :. 101 I - , .. , --

1150

I

O\IALEIIOrF"ER\2o17\BPOOJ'020 ·.JN
PROJECT

·f(!OINIII J#IILNIIT'OU.Ootol.AN ifDT AJI!oP/CIA T#IW#'tiiii.MI OHI.....TIJitM.O ..,., KICII A M£lN>A OOC:

laT.lo.21••fi·I TA. l1•1

S H OP DRAWING

®

©

®

""

;..

L

I.

I

'

·

'

\!)

.

I

.

/

\ I V I if

.

I • I•

5600

P--

. -

/l L

I

I•



:'

co

?10.

D-

t-

--=:

"' - ·

Top Poor H U d · 16 268 1

/

mm

N

P8.53 MAIN ROAD

j

2036( ll0(0Jl

; L2 -,..

SUPPORT PLAN FOR PIER HEAD

L

'

u

l a >---•O M

1-

-· r+l-

r-::

V(:v :V(

"=f- ."

.I


1 KN O W N

BY

@ Shorcng

H-B u m 400/J00-8000

.

;n

Tc

1--POB

Bottom Cro1 ·1l26!8

"'" DATE

Jl


Span Beam 800/J00-24000 !BOX)

""' 7105

-

..._-;: OWN ER

I•

1-9 I

4500

[/

r-0- · -

STA.24 + 136.508

Bolt t120x100 W'ith Nu t 1'120 H T B 1PH 6 oHt, ;N ut 1'11 1 TB t-"tle•d Piece Splrde

v

!'----

Huvy Duty RORO Shor11g SSO

...._ - T lbe Sectcon 2 0 1'1 0

"'-.,

f-

1--Webong sl

- Tlbe Section J 0 1'1

/

""

/ DATE

v

"'

liiii ..JAVA ,J 242

0 0

·- · I

I/ :! 1500

OM

l 7'i0

loL. . J.o

- · - · -· - ·

I I

k:::)._ . .b

--

I

I

k::::L

PROPOS E D IY

Top Pie Ca. p ol742 .._-;;

1500

-

I I

bo;o

- -

..._-;:

A

11!!1 KOH&TitUK&I •

.

lc:::::

Lb

Bottom P e Cap -0758

.._-;;

OA T E O&U/20H

"EYISIOH I

I:Mtt

I

HOTf.

lf FRONT VIEW PIER

:8.53 1

_ ..,...•c.o 1C1L1

I

t

-

..

..--

PROJECT

f""'®

r-
f""'®

.,.,..,

-

""

l2 :1 (2)

,

[ T· \.!}

[.,iii .

I

II · "-...II I · -!=-:1

SJ.t.JtS,r.(WSITSIIl

!

Xr(

jiin

z

r



........

7

SHOP DRA W ING

STAIRS ACCESS

J "

PIERHEAD MAIN ROAD

wo

STA.24., 136.508

>!!..

=

hft•Cre•

-

;/

' X wr{ ::::: l v -·,.,_,

/, "''I

IUDat:...,..O

-r ol$hxf1!1

"

A

.............. TOU.DIILAIIII
IITA.l'1'4ti•ST.... JJ•IM'I

( Lli:::,:::

OW NER

._.!!!.

·I

Jl

S..,&u•IIW)IO..!I.OOOIBOX)

Q)

/

IIIIUAS

SEIQIA .t.QAOINO.fiU.OQ!.-.....cl

iii ?

· I IIll f.:t.:- f::-.,1

r-h

IIENNI I TNW

K NOW N BY

"'"'' ·-

,/

'

..... ""

.."' ·ll•

. ------= ,.,

DATE

oi._U;

"'--- · - ·

.....

e.tt.... . .

-· -

c

"·"' ltMOA ...... DATE

liiii ..JAVA

A

11!1KONSTJtUQI •


P ROPOSED BY

J D!Q!.!:! DATE OMZ'20t7

REo,nSK)N J

1 150

-=-a

I

DATE

tHID

- - ·-

i01¥1NHG HUIIII!Ot

P R OJ E CT

.------COLUMN 1H"""I £

.IIOI.AN10U.OolriiJrlliKO; A ..wwtlA THW" I_,....XMN W- 0\ DNIIUI'iTQ!:M.OCKaNfG KXI! AICD.APA OAtiiNO-"AO G(:IIIJr>'l(;, (tTA.21...1 ·nA.:n•IN)

S H O P DRA W IN G

DETAIL ARRANGEMENT FOR PIERHEA D MAIN ROAD P8.53 STA.24 + 136.508

®

OW N ER

J

!

JAIIAirD,

J
DA TE

.. ..DETAIL ARRAGEMENT SECTION 1 'r

SHO RING PO

I

SCAlf 1:100

STEEL WALLER SRZ 239

a--,

lr.k ZAHHt.stW'fGAJI _ Iol

X X X X . .. . ..

DA TE

.;_:: ·-

.• . " t '

I!

I! I!

"-/ XX XX

"'

·... .

PLATFC RMWORK

·.

®

.:.· - ...':·_.: - .-::· "'-./ X X /·. . . ·.,. · ......,....·.. XX XX XX XX .>/. ;-.;·_:·_ 1:: ·.. ·.: -·

"'-./ XX

X X /""-. /""-.

liiii .JAVA

;

>< >< · - .

:

J

-

""

11!!1 KONSTltUKSI • PROPOSED

BY

/ ""-. / ""-. .:·-· .: ·:::.-\ ::: :··- - --z ··.: ""'

-- -

I

DATE 05 113'2017

SECTION 2 !TOP VIEW OF P08 SHORING & BASE FORM)

REVISIOH I

rROWN

.. ..DETAIL ARRAGEMENT SECTION 2 'r

A

SCAlf 1:100

L

TE

r,IROFR 1QO

.".."..".'........,.

.....

........._

...

··-v.M

PR O JE C T

JAI..NilQ.L.(UIIUIII,MII(JTA..,p#f. fA

fNW' 1N.IM trnTJt0Nt alf(ttfltMQO(:SM'ti)

r 011 Pl•HtM

Top PIB' Hud

·1'-261

u.s

1:: 1 !

1

.nus

01 Sflorirt

;

bZ

•sill•• 8011)00..1000 HIIPPt,ttHBt•

: :::

=

r::.

r; •lZ4Z

.. sa

I

f\

I







.

.. .

;

oss.bt• toollH-1000

rL----a-..

Pt•• H8u•

-

Bait K16xt00 W".th w ,r t116 KT8

vI X

1\

I

\

::=

1I\

/ 1\

X

Ht.avy Duf RORO Shcn SSI

\

'/

H:

hbo Soctooo U H

I

DATE

I·\ - Tubt Stctlon lO H

\

ri04.1nd l4

,_ ,

...

·1 242

...

Top Ph Co il •\l 42

: '.. :!$: .0.0.. - • .... :. .. . ..

:-

KNOWN BY

t tt20x100 ....,th N t t121 HTB

z-

-"S!i • .-

lm.'?

1'-

.

· ':

OWNER

.,...,

.nzu

H-&aa 1.00/ )ot -1000

'i -

SoU• Pilehp

>< - · - ·

' r·:·,..·. .. . ·. -., 'J s · '

Top Ph tap •\.142

_ .,.

•12.161

Btfto.Cr"

=

Cnund lt'ftl

STA.24 + 136.508

hp Ctwn

s....,

-

aU H2ht00 WUh Nl.lt tUO HT8

PIERHEAD MAIN ROAD

· I

[Z

.....400/300-8000

SHO P DRAWING

\

7

8ott•Crwn

\ITA.l1...1·ST4.,1•1Mt

il

SECTION SUPPORT

J

r.,erwn

.........

•1

·-·

KIQI .t, CL.APAO

.

,· •..... ?41 · ' ·

· - ·

'i.sdr_· -

:.·-<<·::.:_\· :·i:.:.- . :·.:

..

'1-

· -·

._.,.

...,_ pq '"'

..u_s.a,.

tf lroL W.JtM:GA - """

DATE

SECTION VIE

SECTION VIE

::OA

: 08

SECTION VIEW CC

.>:>UJ

SCAli 1:120

t 7171

1SOO

f. _f_.f.-f7"1lf

t SOO I

1717

C:OH TIU.Ct 0

lii11.JAVA

A

11!!1 KONSTIIUIUI •

PNO,OSlD IY

lL2IU!!I1!!Il DATE OISI'I2'2017 REVtS«)HI

-

TE

ICN.I

I

t

UD

1-...........-

..-

LAMPIRAN 3 Sequence Concrete Mixer

Sequence Pengecoran Pier Head

fi4l

032-100

\

.---I

032-100

I

24 19

'------1!t o..n N

I jtj

34 29

N

(Hi;)o32-100

I

J ';1

C> C> C>

r

---- ----

33 28 23 .. 18 13

9 6

11 j

31 26 21 16

10

11 8 5

1

4

1

}_---

Ill

.ll . D. ll.

.,_,[

6i4) 032-100

J

\

[jb

30 25 20 15

4500

\

1

IU

)1

2

27 22

---- ----

11

J.Z------'

1 0 0 0

I

.... .. 0 0

0 0 0

.. 0 0

.. 0

Q

.. Q

C> ' C>'

I

Perhitungan Cycle Time Pengecoran Pier Head

1. Lama perja la n da ri Botching Plant menuju lokasi pekerjaan 2. Waktu ya ng dibutuhkan untuk t uang beton tiap mobil Truck Mixer 3. La ma perjala n kembali menuju Botching Plant 4. Proses Loading beton di Botching Plant Jumlah waktu yang dibutuhkan 1Mobil TM (PP) adalah

30 20 30 10 90

menit menit menit menit menit

Uraian Kebutuha n volume beton per layer (tiap ketinggian 40 em) Ka pasitas Mobil Truck Mixer Jumlah armada yang dibutuhkan untuk cor beton per layer sebanyak 3 Jika waktu curah beton tia p mobil TM adala h Maka waktu yang dibutuhkan untuk cor beton per layer adalah Sehingga waktu total yang dibutuhkan pengecoran Pier Head dengan ketinggian 3.5 m adalah

Volume 31.59872 7 4.514103 25 112.8526 1015.673 16.92789

Satuan m3 m3 MobiiTM menit/mobil TM menit menit jam

No. 1 2

Disimpulkan Waktu cor Pier Head sd selesa i Jumlah armada yang dib utuhka n per layer

jam MobiiTM

Jika 1Mobil TM dapat 2 x PP. maka : Wa ktu co r Pier Head sd selesa i Jumlah armada ya ng dibutuhkan minima l

jam Mobii TM

Keterangan 20.36x3.88x0.4 m

4.514 Mobil TM x 25 Menit/Mobil TM 50.625 menit x 9 layer 506.25/60

t

}

,

' '-

'

._- ...

' ..5·

'-

)'""

J

'

")

CYCLE TIME PIER HEAD \

-

No

PIER

-

8 Pekerjaan Pier Head

I

Menggunakan Sis/em bekis/ing cash in situ

·-

r

-

Pasang System Bekisting

- - - --

-

Pembesian Pier Head

'

1 -- .

-

------ ----

Pek.Curing (Concrete .bongkar shoring dan slipper compound) Pek.Stressing

--

- - -

--- -I---

--

2,00

L,-· -

I

=

--

--

-- -

::_

8,00

74

75

76 77

78 79

80 81

--------

82 83 84 85 86 871 88

-: . --

89

90 91

l -. . --

-- - --

.=._ =.. _- _·

-_ '

,_

---

--

1

c

-

-·'"-= -==- = = -- .

-

I

1

--

r------- ·---.

--

.

-



-

.

-- -·

97 98 99 100

- .. - ---- - .

I

1 -

i_

.

92 93 94 95 96

-

--·

-- -- - ,: , . = ==

2,00

-

7,00 7,00 2, 00 2,00

- - - ..-- ----------------- -- -- w - -- ---

--- -- - -- ---- -- --- 1 --- -·

,_

1-

1 -

f-

25,00

I I

73

2,00

--

- -·

--

72

---

-

::.:-=

Total waktu (hari)

64 65 66 67 68 69 70 71

1 ,00

Pek.bongkar bekisting TEPI

-·--

·-..-- - .

-.

-

Pek.pengecoran

--- -

-

--

... ------;- ;, --

Pasang Side form dan End form

·-------....

Waktu Kerja (Jam)

Hari

Pasang Base form



.......

)

r Waktu

Item Pekerjaa n

I

'

J

'-_)

-

fl

' . ,\ '

..,

-- -- - -- -- -

r----= --....;,:

--r

--

.-

--W.

- ...... r--

'---,

---- - ---·---·------·----

'---, --

1-

1-

J

"'

)

)

"

7

4

) '-

4



' )

t

)

Ill

JAKARTA TOLLROAO DIYILOrMIM T

45000

45000

45000

45000

24+200

12000

12000

l ....

C CKEDrf

LAMPIRAN 4 Detail Pemasangan Roro Shoring

INSTRUKSI KERJA

PEKERJMN RORO SHORING SSG A. Pekerjaan Persiapan 1. Persiapan material Roro Shoring - Cek list material - Cek shop drawing - Cek aktual pengiriman material di lokasi I surat jalan 2. Persiapan alat kerja bantu - Kunci 24 : kunci untuk bolt & nut M16x70 HTB - Kunci 161Impact.W : kunci untuk bolt & nut pada swivel+fix clamp - Meteran - Benang & unting : untuk vertikaliti & cek kelurusan pemasangan tube section pada pabrikasi - Waterpass : untuk cek kelurusan antar pasangan Roro - Palu :untuk memutar base & head piece 3. Persiapan alat angkat - Alat angkat I alat berat dengan kapasitas angkat minimal45 ton 4. Persiapan pekerja - Jumlah pekerja untuk pekerjaan pabrikasi Roro shoring minimal 4 orang

'---- ----- ===:::::._

Head Piece

----- ., ----- Mounting Flange "+------ Bolted Flange (for RORO SSD)

\

\

/

I

I

Heavy Duty RORO Shoring SSD - Tube Section 2.0 t1

'\ I

I

\' .1- - -Bolted Flange (for RORO SSD)

----- rt-o

---- Bue Piece Mechanical ----- Base Plate

1500

Roro Shoring Dua Titik

1

INSTRUKSI KERJA

PEKERJAAN RORO SHORJNG SSG B. Pekerjaan Pabrikasi

.---------[lr.gDNt BrBCe fi00K500

I

I

I

\

\

f

i

I

I I

" 'D

i

I

!

I

I

I I

I

I \

I

I

\ \

I

I

I

i

\

I

I

I

\

i

I

\

I

I

I

II

a a

'l II

\ I

y I \I I II

i ...

II II

i \

I

I

i

!

J i

I

I I I I a a

j

I

j

!

I

II

\I

I

I

\ /

II

I

i I

I

II

a

I

\I

/

- Tube Sedlon 3.0 H

I

I

I I I I

- Tu S@ction 0.5 11

J

I

I

:.

I

I

!

1

I

I

,I i

\

Heavy Duty RMO Shl:ring SSO

I

i

D

I

I

I

r

I

I

i

i

I

\

I

I

I

\

I

\

\

I

I

\

I

I

\

\

I

I

I

,

I

I I I I

I

\

\

I \

I

·'to---+-+----Cbgooa( Brace 1500x3000

/

/

a a

I

I

I

I

I

I

I

I 1------Base Piece Mechanical & Base Plate S40

2

INSTRUKSI KERJA

PEKERJAAN RORO SHORING S50 B. Pekerjaan Pabrikasi

1. Pasang Tube section 3 m

Tube section 3 m

2. Pasang Tube section berikutnya 0.5 m 3. Pasang Bolted Flange di kedua ujung Tube section 4. Pada bagian bawah Roro shoring dipasang Base piece (mechanical) dan pada bagian atas Roro shoring di pasang Mounting flange + Head piece.

'

I

\\

I

\

I

I

\\ /I )\

I \

/ I I

I

\

\

\

\ \

3

INSTRUKSI KERJA

PEKERJAAN RORO SHORING SSG 5. Tahapan pemasangan bolt & nut M16 pada sambungan tube section - Pasang benang dari ujung bawah sampai ujung atas Roro shoring dua sisi - Kencangkan bolt & nut secara silang dan perlahan mengikuti jarak antara tube section dengan benang. - Dua bolt & nut bagian atas bila di kencangkan akan mendorong tube section ke arah bawah, dan sebaliknya. Begitu juga dua bolt & nut sebelah kiri bila dikencangkan akan mendorong tube section ke kanan dan sebaliknya.

6. Ulangi langkah pabrikasi dari 1-5 untuk merakit susunan Roro shoring yang kedua. 7.Atur leveling antar Roro shoring dengan memutar jack nut base jack lalu pastikan dengan waterpass bahwa kedua pasang Roro shoring sudah level. 8.Atur jarak antar Roro shoring sesuai shop drawing.

".. .'*. · "'

4



.4

. ..

A •

:

.

. ;

....'.

INSTRUKSI KERJA

PEKERJAAN RORO SHORING SSG C. Pekerjaan Pemasangan 1. Memasang Beton Sleeper sesuai elevasi dan axis yang telah ditentukan

FOOTING

2. Mengangkat Roro Shoring dengan alat Bantu Crane

5

INSTRUKSI KERJA

PEKERJAAN RORO SHORING SSO 3. Meletakkan Roro Shoring sesuai dengn posisi yang telah ditentukan.

4. Memasang pipa-pipa bracing pengaman sekaligus memenksa elevasi dan verticality Roro Shoring, dilanjutkan memasang Head piece atau Attachment piece

.------SCAFOLD TUBE 048

t==r=r:l:==!

6

INSTRUKSI KERJA

PEKERJAAN . RORO SHORING SSO 5. Memasang Cross Beam 400/300 diatas Roro Shoring berikut perkuatannya

6. Memasang Long Beam 800/300 diatas Cross Beam 400/300 berikut perkuatannya

7

LAMPIRAN 5 Detail Pemasangan PDS

ATURAN /PERINTAHKERJA PEKERJAAN SHORING FRAME PD 8

A. PABRIKASI DAN PEMASANGAN 1. Memasang Base Plate PD 8 berikut spindle dan Quick Jack Nut diatas Span Beam 800/300 (BOX) dan H-Beam 400/300

,.....uttJt&.f lt"ll

2. Memasang Frame PD 8 diatas Base Plate PD 8 lalu pasang DIAGONAL BRACE DK DK sebagai pengikat antar Frame PD 8.

ATURAN I PERINTAH KERJA PEKERJAAN SHORING FRAME PD 8

3. Memasang Frame PD 8 berikutnya sesuai dengan gambar kerja.

4. Memasang Spindle PD 8 dan Quick Jack Nut diatas Frame PD 8. 5. Pasang Head Plate PD 8 diatas Spindle PD 8.

ATURAN /PERINTAHKERJA PEKERJAAN SHORING FRAME PD 8

6. Mengngkat Bottom Form lalu pasang diatas Head Plate PD 8. 7. Mengatur Elevasi Bottom Form dengan menaikan/menurunkan Spindle PD 8 atas.

i

I I · II I

I

I

j

r

I I

.. -

..

I

.

1 "

·-

"'

. J";. :. ..

\

·. ·;:i<::·

I

-- --· ·--- =- _:

n

1

a- - I I

I

.. I 1/ T

.. I

T

I II I·-

iI

8. Memasang Side Form dan End Form. 9. Memasang perkuatan-perkuatan pada Side/End Form

L

r

I

: tl

[Z [Z

f-f-

f-

-...-;;

I

LS: r\

ts

--..

[]

....

.

.

' .... .

I

"

I



I

.. I

m

I

I

..

.

.

... .. .•

.....

'

.... -

• I

..

A '•



I 4

.. -.{-

. ;

r;)

... ·. :

01 I

-

n. 1-:b-llo

·-

--

.

..

.

Iii

rz

\ ....•. . ..-> ·.

u

..

[7

.· I

I"'

II

f

I



. I

.. . ·-·

. ."

.

Ill

L



Ill

I

m

.

- .·

'

. .... If

..... "·.... ·.. --·---t ---=

m

l

ATURAN I PERINTAH KERJA PEKERJAAN SHORING FRAME PD 8

B. PEMBONGKARAN 1. Membongkar perkuatan kemudian Side Form dan End Form

ts:

rs: ts K: \ ·, :r/7 tz rz rz '

2.

.

Menurunkan Spindle atas kemudian membongkar Bottom form.

-

-

ATURAN I PERINTAH KERJA PEKERJAAN SHORING FRAME PD 8

3. Membongkar Head Plate PD 8 berikut Spindle atas dan Quick Jack Nut dilanjutkan dengan pembongkaran

4. Membongkar seluruh Frame PD 8 berikut Frame Connector With Washer. 5. Membongkar Spindle bawah berikut Quick Jack Nut dan Base Plate PD 8.



.

•"llo..

-:. .. ;;: .; ..:·, .. ··. .:...

• • .... • • "-4··.·

.

J • ••

;-

....

* )j



-·.· •: ... . .. .- ' -. .:

LAMPIRAN 6 Material Compound Curing

IJLTRICIEMe CURE WB Penghambat Penguapan Air dari Beton Segar

KETERANGAN Ultrachem• Cure WB adalah bahan penghambat proses penguapan air (evaporasi) pada beton basah. Bahan ini berbentuk cairan yang jika terkena udara akan mengering dalam waktu singkat dan selanjutnya membentuk lapisan tipis yang relatif kedap air. Didesain khusus untuk melindungi beton selama proses pengikatan (terutama pada masa pengikatan awal) dari kehilangan air akibat panas dari sinar matahari maupun angin dari udara bebas.

KOMPOSISI BAHAN Ultrachem• Cure WB mengandung bahan utama acrylic yang ditambahkan pelarut dan beberapa material pengisi lainnya hingga mencapai 100 %.

KEUNGGULAN • Mengering dalam waktu singkat dan aman terhadap kemungkinan rusak akibat hujan. • Efektif untuk menghambat evaporas i proses pengikatan beton. • Dapat dilanjutkan dengan plesteran atau pembetonan lanjutan tanpa harus melakukan pengikisan lapisan curing compound.

PEMASANGAN PRODUK I. DASAR • Dasar adalah beton atau plesteran yang baru dituang atau diaplikasikan. • Biarkan air yang terlepas (bleeding) menguap terlebih dahulu. Pembuangan air dapat dibantu dengan menggunakan vacuum pump, selang plastik ataupun karet pendorong.

II. APLIKASI Ultrachem• Cure WB dilapiskan diatas permukaan beton atau plesteran dengan berbagai cara misalnya : • Disemprot dengan menggunakan pampa penyemprot (biasa digunakan untuk keperluan penyemprotan insektisida di perkebunan atau persawahan). • Dilapiskan dengan gulungan (roller} biasa digunakan dalam pengecatan. • Dituang dan diratakan dengan karet pendorong. • Konsumsi yang disarankan adalah 5 m2 setiap kg Ultrachem• Cure WB, digunakan langsung tanpa campuran air ataupun bahan lainnya .

Ill. PEKERJAAN LANJUTAN • Beton atau plesteran dapat dilanjutkan tanpa harus mengikis atau membuang lapisan Ultrachem• Cure WB. • Akan tetapi, pada daerah sambungan yang kritis dimana dibutuhkan rekatan yang baik, sebaiknya permukaan beton lama atau plesteran dibobok dan dikasarkan untuk meningkatkan kekuatan sambungan secara mekanis (mechanical key). • Lapisan Ultrachem• Cure WB dapat diinjak dan dilewati orang setelah 2 jam dan tahan akan siraman air setelah 3 jam.

KEMASAN Ultrachem• Cure WB dikemas dalam 2 ukuran : • Kemasan besar: 200 kg/drum. • Kemasan kecil : 20 kg/jerigen.

PENYIMPANAN Ultrachem• Cure WB dapat disimpan hingga 12 bulan selama disimpan pada lokasi yang kering dan sejuk dalam kondisi utuh tidak rusak atau terbuka.

KESEHATAN DAN KEAMANAN Ultrachem• Cure WB tidak berbahaya bagi kesehatan dan kulit. Akan tetapi selalu disarankan penggunaan sarung tangan berhubung kepekaan kulit setiap orang berbeda-beda. Tumpahan atau tetesan Ultrachem• Cure WB dibersihkan sesegera mungkin dengan air. Uhat lembaran data keamanan bahan untuk informasi lebih lanjut.

LAMPIRAN 7 Inspection and Test Plan

fiill JAKARTA TOLLROAD II!!J DEVELOPMENT 'U.l1 . .. Ma10 Act1v1ty

A ct R ef

PEMBA ,."••' · N GUN A N 6 R UA S J A LAN TOL

1.1 1.2 2

·

"",::,';:. : ! ::, :::.;.: '0.,....

liiU

. cat1on . and Speslfi Other Reference

Accepta nce 't . Cn ena

lnsspection by J k Adh' a on 1 Sub con

J A:-_:_ _,_,..,....,_-<""_ .,.,J'_-_..,...:o.,.,.

l(YII;:_!

Inspection and Test Plan: RC Pier Head Construction

Document

1

D A L A M KO T A D K I

F

. Superv1sor

QC

Constructio n Manager

Consultan

(-(.-1§1 ..-•... .

requency

ve ·ty· g Do ume

n 1n c n (SeIf Cert"1fi1cat'10n)

., .-..

t

Requirement before Construction Preparation for Methode Statement a nd IT P Preparation Shop Drawing

Spec. 10.07 & 10.02

Approva l/ Acce table

H

H

R

S

H

Prior to Comment

Consultan Letter for Approva l

Spec. 10.07 & 10.02

Approval/ Acce table

H

H

R

S

H

Prior to Comment

Consultan Letter for Approval

Material Approval

2.1

Concrete Mix Design

Spec. 10.01

Approval/ Acce table

H

H

R

S

H

Prior to Comment

Consultan Letter for Approval

2.2

Reinforcement Bar

Spec. 10.02

Approval/ Acce table

H

H

R

S

H

Prior to Comment

Consultan Letter for Approval

Acceptable

H

s

W

On ce Prior to comment

Visual Inspection w ith size and Pitch · Measunn

Acceptable

H

H

-

w

On CcoemPmrieonrtto

consuItan Letter for A pprova1

Approval/ Acce table

H

H

S/R

W

S/R

Prior to Comment

Test Report

Prosedure Concrete Tr ial Mix

F'c 40

H

H

S/R

W

S/R

Every Truck

Delivery Ducket

Prosedure Concrete

16±2.5 em S/R

·101't1' 1 5 T k& a rue afterward every 30

. Check List

3 3.1

Form Inspection Advance Check for Falsework & Formwork Spec. 10.01

3.2

Support and Form Calculation

4

Material Receiving & Testing

4.1 4.1.1 4.2 4.2.1 4.2.2 Date :

Spee. . 1001

Reinforcement Tensile/ Bending Strength Test

Spec. 10.02

Concrete Job Mix SlumpI Concrete Temperature

Tria l Mix

Ts35oC

H

H

S/R

w

H : Hold Point W :Whitness point S : Surveillance R : Document Review

Page 1of 2

Remark

lmi JAKARTA TOLLROAD @ DEVELOPMENT Act Ref

Main Activity

5.1

Spesification and Other Reference

Reinforcing Bar

lnsspection by Acceptance Criteria

Jakon- Adhi

Sub Con

Supervisor

QC

Construction Manager

.

Approval/

Fabrication

Shop Drawing

5.1.2

Grade, Size, Number and Position of Rebar

Shop Drawing Accej)table

5.1.3

Cover ing/Spacing of rebar

Shop Drawing

5.1.4

Splicing Joint

Shop Drawing

5.2

-

.

Each Pier Head

Check list

Consultan

Surface Condition

Spec 10.02

H

S/R

H

s

w

.

S/R

Each Pier Head

Check list

A pproval/ A cceptable Approval/

H

s

w

.

S/R

Each Pier Head

Check list

H

s

w

.

S/ R

Each Pier Head

Check list

Acc eptable Approval/ Acceptable

H

s

w

.

S/ R

Each Pier Head

Check list

S/R

Concreting

5.2.1

Placing Concreting

Methode Statement

Approval

.

w

S/R

Each pile

Check list

VisualInspection

Methode Statement

S1/100

H

s w

R

5.2.2

R

.

S/R

Each pile

Check list

Methode Statement

A pproval

H

s

R

.

S/R

Each pile

Check list

Methode Statement

cr28
.

H

S/R

w

S/R

16

Test Report

5.3

Curing

5.3.1 Curing Concrete

6 6.1 f--

Laboratory Test Compressive Concrete Strength

Speciment/60cm3 foro7 & a28

Date:

H : Hold Point W : Whitness point S : Surveillance R : Document Review

-

t ...-.···-r ·

Verifying Document {Self Certification)

H

Accepta ble Approval/

<-'!' §•

Frequency

Pier Head/ Abutment Constrution

5.1.1

5.1.5

e--Y" I ru l-e----- .-:-.-. ,

Inspection and Test Plan: RC Pier Head Construction

Document 5

JAVA CM

PEMBANGUNAN 6 RUAS JALAN TOL DALAM KOTA DKI

TAHAP I,RUAS SEMANAN • SUNTER DAN SUNTER • PULO GEBANG SEKSI A1,KELAPA GADING- PULO GEBANG

Page 2 of 2

Remark

LAMPIRAN 8 JSA & JSE

rmJ :L · KSO JAYA KONSTRUKS I- AOHI

Job Safety and Environmental Analysis (JSEA} JenisPekerja an

Kolom I Pier,Crown dan Pier Head

Aktivitas

Pemasangan scaffolding, pemasanganbesibeton, pemasanganlpembongkaranbekisting,

NamaPa ket

Seksi A

I Kontraktor

PT. Jaya Konstruksi -AdhiKarya, KSO

Lokasi No.Kegiatan Owner Th.Anggaran Nama Jabatan

KelapaGading- PuloGebang

I Konsultan MK

PT. Jaya CM- PT. ViramaKarya- PT. OptaStrada (KSO)

PT. Jakarta Tollroad Development I 2017-2018 I I Diperiksa Disiapkan HSE HSE .?anager

u

TandaTangan

I I

Disetujui KonsultanSpv.

No. Tgl Rev. Hal. Asli

PIC l\lrfi{!l A pengecoran,perawatanbeton Lokasi All Zona Tanggal APD yang Digunakan Helm Safety,RompiReflektor, Sepatu Boot Safety, SarungTangan,Full Body Harness with Double-Hook Peralatan yang Digunakan Service Crane,Excavator,Concrete Pump,Scaffolding,Hand Drill No.

PotensiBahaya I

TahapanPekerjaan Persiapanperalatan

Peralatanmengala mimasalah

r-t

ResikoBahaya

PIC Kerusakanlingkungan 1



Pembangunan 6 RuasJalanToiDalam Kota Ja karta Tahap 18 RuasSemana n-SunterdanSunter - PuloGebang Seksi A PuloGebang- KelapaGading (Sta. 21+881- Sta. 31+168)

'-

004IJK-ADHIIJSAIXI/2017 27 November 2017 0 114 Revisi

PenilaianResiko p s R

RekomendasiT indakan

Kerusakanpadaalat

Lakukanpemeriksaanrutinhariansebelumdigunakan

Gangguanpublik

Lakukanpemeriksaa nrutinbuIanan

angkatang kutdenganalatmenga lamimasalah

Cede raberat, kecelakaa nbagipihakum u m

Laksanakan Pre-Lifting Checklist seca rabenar

Area kerjagelapsaatmalamhari

Cidera

L

B

6

Operator Operator,

Proses

Mekanikdan HSE

M

c

M

c

Supervisor, Operator

Lakukanpemasanga npenerangan yang cukupdanses uai

Pemasangan scaffolding

I perancah

Scaffolding tidakmam pumenahanbeban

Supervisor,

Gunakan materialscaffolding yang Cideraberat sesuaidenganstandar yang diakui Scafolder (rubuh) Lakukanpemasangan scaffolding sesuaidenganstandardesain yang ditetapkan Lakukanpemeriksaanawalsetelah scaffolding

I

L

A

L

A

Lakukanpemeriksaanrutinmingguanscafolding Cidera berat

Supervisor, Scafolder Supervisor, HSE

terpasang

Pekerj aterjat uhketikamemasan g scaffolding

Supervisor, Mekanik Pekerja

Housekeeping harusrutindilakukan 2

6

Supervisor, HSE

Pastikanaksesoriskeselamatanpada scaffolding terpasangbenar

M

Lakukanpemer iksaanrutinmingguanscafolding ------

-----

B

Supe.,;so•, Scafolder Supervisor, HSE

--

I I

Lakukantekni ktigatitiktumpusaatnai kdanturun Gunakan full body harness

Pekerja Pekerja

secarabenarsaatbekerjaataumenaikiscafolding

3

Pemasanganbesibeton

Tanganpekerjaterjepitbesiketik

Luka jepit

Perhatikandenganbenarpos isititikjepit

Ciderakulit

Gunakansarungtangan Pengikatbesidililitkankebagiandalambesi,

L

apemasangan Gesekankulitdenganbesidanpe ngikatbesi

tidakmenonjolkeluar Gunakanbajulenganpanjangdancelanapanjang

Pekerjaan di

Pastikanaksesoriskeselamatanpada

ketinggianmenyebabkanjatu h

Pekerjaterkena swing material olehalatberat

Cideraberat

Cideraberat

c

5

Pekerja M

D

5

Pekerja

terpasangbenar

M

B

Supervisor,Pekerja

Lakukanpemeriksaanrutinmingguanscafo lding

Supervisor, HSE

La kukantekniktigatitiktumpusaatnai kdanturun

Pekerja

Gunakan full body harness secarabenarsaatbekerjaataumenaikiscafolding Lakukanpemeriksaanawalperalatan (ecxa} sebelumdioperasikan Saatalatmasukbergerak di bawah area galian, pekerja yang ada di dalamharusmenyingkirkedinding pile cap Lakukanpengawasanintensifterhadapperge rakanalata pabiladilakukanpekerjaanbersamaanantara manual danalat

Pekerj a L

B

6

Supervisor Supervisor,

Kecelakaanpihakumum

Laksanakan Pre-Lifting Checklist secarabenar,

Oderapekerja

Menaik-turunkan material denganmenggunakanta li bantu yang dipasangkatrol Housekeeping rutinharusdilakukan

M

A

L

B

Pekerjatertimpa panel bekisting

Oderaberat

Lakukan pre-lifting checklist denganbena r

Operator

6

Pekerja Pekerja Pekerja Supervisor,Pekerja

Lakukanpemeriksaanrutinmingguan scafolding Pemasanganbekisting

Operator Pekerja

Janganmeletakkan material di ketinggianapdakondisitidakstabil Pastikanaksesoriskeselamatanpadascaffolding terpasangbenar

4

Pekerja

scaffolding

Swing material hinggakeja lanumum Material jatuhdariketinggian

Pekerja

Supervisor, HSE M

B

Superv isor,HSE

Pengawasanterhadappekerjaand ilakukanbenar

Supervisor

Pekerjamenja uhsesaatsaatbekistingditu runkan

Pekerja

Swing material hinggakejalanumum Panel bekistingterjatuh

Pekerjaan di ketinggianmenyebabkanjatuh

5

Pengecoran

M

Supervisor, Operator

A

Kecelakaanpihakumum

Laksanakan Pre-Lifting Checklist secarabenar,

Kerusakan material I aset

Pastikan panel terikatkuatpada crane sebelumdiangkat

Pekerja

Laksanakan Pre-Lifting Checklist secarabenar ,

Supervisor

Cideraberat

Pastikanaksesori skeselamatanpada scaffolding terpasangbenar

M

B

Supervisor, Pekerja

Lakukanpemeriksaanrutinmingguanscafolding

Supervisor, HSE

Lakukantekniktigatitiktumpusaatnai kdanturun

Pekerja

Gunakan full body harness secara benarsaatbekerja ataumenaikiscaffolding

Pekerja

Keterbatasanudara di dalambekisting

Sesaknapas, taksadarkandiri

Lakukanpembatasan jam (gilirkerja)

L

c

6

Supervisor

Pekerjatertimpa material cor

Ciderakepala

Lakukankomunikasi yang baik

L

c

6

Pekerja Pekerja

Gunakanselalu safety helm Kaki terjatuh di antaracelahcelahbesi

Cidera kaki

Perhatikanposisipijakan kaki

M

c

5

Pekerja

Gunakansepatukeselamatandan full b Pekerja denganbenar Pekerjaterjatuhsaatnaik atautur unkedalam area pengecoran

6

Pembongkaranbekisti

Pekerjatertimpa panel

ng

bekisting

Cideraberat

Sediakanaksestangga yang sesuai

Cideraberat

Gunakansepatukeselamatandan full body harness denganbenar Lakukan pre-lifting checklist denganbenar

L

c

M

B

Panel bekistingterjatuh

Pekerjaan di ketinggi anmenyebabkanjatuh

Supervisor,HSE Supervisor

Pekerja menja uhsesaatsaatbekisti ngditurun kan

hinggakejalanumum

Pekerja Pekerja

Pengawasanterhadappekerjaandilakukanbenar

Swing material

6

Pekerja Supervisor , Operator

Kecelakaanpihakumum

Laksanakan Pre-Lifting Checklist secarabenar,

Kerusakan material I aset

Pastikan panel terikatkuatpada crane sebelumdiangkat

Pekerja

Laksanakan Pre-Lifting Checklist secarabenar ,

Superv isor

Cideraberat

-

·-

Pastikanaksesoriskeselamatanpada scaffolding terpasangbenar

M

M

A

B

Supervisor ,Pekerja

Lakukanpemeri ksaanrutinmingguanscafolding

Supervisor,HSE

Lakukantekniktigatitiktumpusaatnaikdanturun

Pekerja

.. ·...... Gunakan full body harness secarabenarsaatbekerjaataumenai ki scaffolding 7

8

Perawatanbeton

Kebersihan area kerja

Penyemprotanvaselinetumpah ketanah

I Pengaturan material yang berserakan

Dapatmerusakkondi sitana h

Cidera kaki

Penyemprotanvaselinedilakukandenganhatihatisehinggatidakmengenaitanah , bilaoerlue:unakan

Pekerja

M

E

Supervisor,Pekerja

L

c

Pekerja

LAMPIRAN 9

PROYEK 6 (enam) RUAS JALAN TOLL DALAM KOTA JAKARTA PEMBERI TUGAS

KONSULTAN PENGAWAS KONSTRUKSI

FORM NO. REVISI :

KONTRAKTOR

PAKET

8,9 &10

TANGGAL : STANDARD OPERATION PROCEDURE PEMASANGAN SHORING & FORMWORK, PEMBESIAN, SHEET DUCTING, COR BETON, STRESSING, PEMBONGKARAN FORMWORK & SHORING UNTUK KONSTRUKSI PIER HEAD CAST INSITU

Beton

NO.

URAIAN

KONSULTAN PENGAWAS

KONTRAKTOR Perkasa

1.

Design, Perhitungan Statik & Sistem Formwork

Design, Perhitungan Statik & Sistem Formwork Pembuatan Job Safety Analysis (JSA)



Pembuatan JSA

Shop drawing



Shop drawing

Survey & Marking utk Base Roro Shoring



Fabrikasi Modul

3

Pemasangan Modul oleh Aplicator (MCE/AJ)

4

Pemasangan Shoring (Tahap 1)

5

Pemasangan Tangga/ Scafolding & Safety Net

6

Inspeksi & cheklist Tahap I (termasuk pengukuran)

VSL

LRB

DUR.

AKUM

1

1





Survey Marking utk Base Roro Shoring Traffic Management

Traffic Management (koordinasi dengan pihak terkait) 2

MCE/AJ

Persiapan

Persiapan

WAKTU

Aplicator LEMO



Fabrikasi Modul





Pasang Modul oleh Aplicator





Pasang Shoring (Tahap 1)





Tangga/ Scafolding & Safety Net



Inspeksi & cheklist Tahap I

2

3



1

4



1

5



1

6



1

7

√ √

Tidak Diterima ? Ya

7

Erection Span Double Beam L=24m



Erection Span Double Beam L=24m



8

Inspeksi & cheklist Tahap II (termasuk pengukuran)



Inspeksi & cheklist Tahap II





Tidak Diterima ? Ya

9

Erection Soffit dan Bottom Form



Erection Soffit dan Bottom Form

10

Inspeksi & cheklist Tahap III (termasuk pengukuran)



Inspeksi & cheklist Tahap III









1

8





4

12





1

13





1

14

1

15

1

16

1

17

3

20

Tidak Diterima ? Ya

11

Pekerjaan Pembesian berikut Ducting, Angkur dan Strand

12

Inspeksi dan Checklist Tahap IV (Pembesian, Ducting & Strand)

Pembesian berikut Ducting, Angkur dan Strand



Inspeksi & cheklist Tahap IV



Tidak Diterima?

Ya 13

Pemasangan Side Form+ End Form

14

Pemasangan Blockout Pierhead untuk LRB

15

Pengecoran Pier Head

16

Curing

17

Pembongkaran Formwork (End Form + Side Form)

18

Monitoring Hasil Uji Kuat Tekan Beton

19

Stressing & Grouting (Comp. Strength Min 32 Mpa )

Pemasangan Side Form+ End Form





Pas.Blockout Pierhead untuk LRB



Pengecoran Pier Head



Curing



Bongkar Formwork (End Form +











Monitoring Hasil Uji Kuat



Stressing Tahap I Inspeksi & cheklist







1

21

Bongkar Span Double Beam







1

22

Pembongkaran Shoring







1

23



1

24

3

27

1

28

20

Pembongkaran Bottom Formwork dan Soffit (Penutupan Traffic)

Bongkar Bottom Formwork dan Soffit

21

Pembongkaran Span Double Beam L = 24 m (Penutupan Traffic)

22

Pembongkaran Shoring

23

Mobilisasi Material Shoring, Span Double Beam,Formwork dll ke lokasi berikutnya.

Mobilisasi Material shoring, Formwork dll

24

Stressing & Grouting (Comp. Strength Min 32 Mpa )

Stressing Tahap II & Grouting

25

Pembongkaran Scafolding dan tangga

Bongkar Scafolding

√ √

Related Documents


More Documents from "ahYing120"