Adnoc Offshore (zadco): Debottlenecking & Enhancement Of Zirku Oil Handling Facility (zr/s/1169) - E&i Works

  • Uploaded by: ramchandargct
  • 0
  • 0
  • January 2021
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Adnoc Offshore (zadco): Debottlenecking & Enhancement Of Zirku Oil Handling Facility (zr/s/1169) - E&i Works as PDF for free.

More details

  • Words: 2,345
  • Pages: 19
Loading documents preview...
ADNOC OFFSHORE (ZADCO) DEBOTTLENECKING & ENHANCEMENT OF ZIRKU OIL HANDLING FACILITY (ZR/S/1169) - E&I WORKS CONTRACT NO. CTCMS170810

SITE ACCEPTANCE TEST PROCEDURE FOR MODIFICATION SWGR AT ZR/S/1169

ZADCO Doc no. TBA

Cegelec P0058.01-DOC-032 Doc no. Elmec EM408-010 Doc no. Rev. A1 Page:

1 of 19

SITE ACCEPTANCE TEST PROCEDURE FOR MODIFICATION SWGR AT ZR/S/1169

A1

19.02.18

ISSUED FOR REVIEW AND COMMENTS

SR

MSK

RS

CGP

Rev.

Date

Reason For Issue

PRPD

CHKD

APPD

ZADCO

ADNOC OFFSHORE (ZADCO) DEBOTTLENECKING & ENHANCEMENT OF ZIRKU OIL HANDLING FACILITY (ZR/S/1169) - E&I WORKS CONTRACT NO. CTCMS170810

SITE ACCEPTANCE TEST PROCEDURE FOR MODIFICATION SWGR AT ZR/S/1169

ZADCO Doc no. TBA

Cegelec P0058.01-DOC-032 Doc no. Elmec EM408-010 Doc no. Rev. A1 Page:

2 of 19

TABLE OF CONTENTS 1.0

PURPOSE ......................................................................................................................................................................... 3 

2.0  

SCOPE OF WORK ............................................................................................................................................................. 3 

3.0  

REFERENCE DOCUMENT/DRAWING ................................................................................................................................ 3 

4.0  

DEFINITIONS .................................................................................................................................................................... 3 

5.0  

RESPONSIBILITIES ............................................................................................................................................................ 4 

6.0  

PERSONAL PROTECTIVE EQUIPMENTS ............................................................................................................................ 4 

7.0  

TESTING PROCEDURE ...................................................................................................................................................... 5  7.1 

IR & HIGH VOLTAGE TEST ................................................................................................................................ 6   

7.2 

TORQUE TIGHTNESS TEST ............................................................................................................................... 7   

8.0  

7.3 

CONTACT RESISTANCE TEST ............................................................................................................................ 8 

7.4 

DOL STARTER FUNCTIONAL TEST .................................................................................................................... 9 

7.5 

ELR WITH CBCT FUNCTIONAL TEST ............................................................................................................... 10 

7.6 

PRE‐COMMISSIONING PROCEDURE FOR NEW CUBICLE ............................................................................... 11 

TEST REPORT ................................................................................................................................................................. 12  8.1 

IR & HIGH VOLTAGE TEST REPORT ................................................................................................................ 13   

8.2 

TORQUE TIGHTNESS TEST REPORT ................................................................................................................ 15   

8.3 

CONTACT RESISTANCE REPORT ..................................................................................................................... 16 

8.4 

DOL STARTER FUNCTIONAL REPORT ............................................................................................................. 17 

8.5 

ELR WITH CBCT TEST REPORT ........................................................................................................................ 19 

ADNOC OFFSHORE (ZADCO) DEBOTTLENECKING & ENHANCEMENT OF ZIRKU OIL HANDLING FACILITY (ZR/S/1169) - E&I WORKS CONTRACT NO. CTCMS170810

SITE ACCEPTANCE TEST PROCEDURE FOR MODIFICATION SWGR AT ZR/S/1169

ZADCO Doc no. TBA

1.

Cegelec P0058.01-DOC-032 Doc no. Elmec EM408-010 Doc no. Rev. A1 Page:

3 of 19

PURPOSE The purpose of this procedure is to ensure that the field electrical equipment and associated pre-commissioning works are executed to high quality of workmanship while ensuring compliance with the project specification and drawings by ZADCO for works

2.

SCOPE OF WORK 2.1

Switchgear A1-SG-D3 - Cubicle #11 & 00

Installation of New cubicle-11&00 next to existing cubicle-10 & 01 with 9nos of 0.75kW starter draw out modules in compartment 00B-F & 11C-F.

3.

4.

REFERENCE DOCUMENT/DRAWING 

GA, SLD, Schematic, Panel Interconnection Diagram and BOM for A1-SG-D3



LV Switchgear Specification

- ZR/S/1169-SW-E-0012

DEFINITIONS HSE PPE QC ZADCO PTW

-

Health, Safety & Environment Personnel Protective Equipment Quality Control Zakum Development Company Permit To Work

ADNOC OFFSHORE (ZADCO) DEBOTTLENECKING & ENHANCEMENT OF ZIRKU OIL HANDLING FACILITY (ZR/S/1169) - E&I WORKS CONTRACT NO. CTCMS170810

SITE ACCEPTANCE TEST PROCEDURE FOR MODIFICATION SWGR AT ZR/S/1169

ZADCO Doc no. TBA

5.

Page:

RESPONSIBILITIES Give individual job descriptions: Site Engineer Pre-Commissioning Engineer HSE Engineer

6.

Cegelec P0058.01-DOC-032 Doc no. Elmec EM408-010 Doc no. Rev. A1

-

Cegelec Elmec Cegelec

PERSONAL PROTECTIVE EQUIPMENTS (PPE) Safety Helmet Safety Shoes Safety Goggles Cotton/Leather gloves

4 of 19

ADNOC OFFSHORE (ZADCO) DEBOTTLENECKING & ENHANCEMENT OF ZIRKU OIL HANDLING FACILITY (ZR/S/1169) - E&I WORKS CONTRACT NO. CTCMS170810

ZADCO Doc no. TBA

SITE ACCEPTANCE TEST PROCEDURE FOR MODIFICATION SWGR AT ZR/S/1169

Cegelec P0058.01-DOC-032 Doc no. Elmec EM408-010 Doc no. Rev. A1 Page:

7.0 TEST PROCEDURE

5 of 19

ADNOC OFFSHORE (ZADCO) DEBOTTLENECKING & ENHANCEMENT OF ZIRKU OIL HANDLING FACILITY (ZR/S/1169) - E&I WORKS CONTRACT NO. CTCMS170810

SITE ACCEPTANCE TEST PROCEDURE FOR MODIFICATION SWGR AT ZR/S/1169

ZADCO Doc no. TBA

Cegelec P0058.01-DOC-032 Doc no. Elmec EM408-010 Doc no. Rev. A1 Page:

7.1

6 of 19

IR & HIGH VOLTAGE TEST

   Equipment  : New cubicle     Test Instruments:    a) High Voltage Test (AC)‐ 2500 V kit  b) Megger 1000V DC    

Procedure    1.   2.   3.   4.   5.

Switch ON all the outgoing feeders.  Switch OFF all Control voltage circuit MCB’s.  Confirm main earth connected to the new cubicle before starting the HV Test.  Carry out the insulation resistance test with 1000V DC before HV Test between each phase and  other phases & Neutral shorted and earthed.  Keep the remaining phases and Neutral busbars shorted together with the earth by shorting wires,  except the test phase of the busbar. 

  6. Connect the high voltage probe to the test Busbar and Earth from the test kit.    7. Increase the voltage slowly up 2500 V AC and wait for one minute.    8. Decrease the voltage to minimum value and switch off the test kit.    9. Discharge the main Busbar.    10. Repeat the same test for remaining phases of new cubicle.    11. Carry out Insulation resistance test after HV test.    End of Test.      

ADNOC OFFSHORE (ZADCO) DEBOTTLENECKING & ENHANCEMENT OF ZIRKU OIL HANDLING FACILITY (ZR/S/1169) - E&I WORKS CONTRACT NO. CTCMS170810

SITE ACCEPTANCE TEST PROCEDURE FOR MODIFICATION SWGR AT ZR/S/1169

ZADCO Doc no. TBA

Cegelec P0058.01-DOC-032 Doc no. Elmec EM408-010 Doc no. Rev. A1 Page:

7.2

Equipment           Test instruments 

7 of 19

TORQUE TIGHTNESS TEST

:  

New cubicle 



Torque Wrench 

Procedure    1. 2.

3.

Take a torque wrench and set the knob in such a position that it will rotate the bolt in clockwise  direction.  Set the correct torque setting for each corresponding bolt as shown in the following table:    Bolt size (mm) Torque setting (Nm) 12 70 10 40 8 20   Rotate the torque wrench in clockwise direction until a click sound is heard. The click sound  indicates that the bolt is properly tightened. 

  End of Test.    

 

ADNOC OFFSHORE (ZADCO) DEBOTTLENECKING & ENHANCEMENT OF ZIRKU OIL HANDLING FACILITY (ZR/S/1169) - E&I WORKS CONTRACT NO. CTCMS170810

SITE ACCEPTANCE TEST PROCEDURE FOR MODIFICATION SWGR AT ZR/S/1169

ZADCO Doc no. TBA

Cegelec P0058.01-DOC-032 Doc no. Elmec EM408-010 Doc no. Rev. A1 Page:

7.3

Equipment           Test instruments 

8 of 19

CONTACT RESISTANCE TEST

:  

New cubicle 



MicroMeter 

 

Procedure   

1. 2. 3. 4. 5. 6.

Switch ON all the outgoing feeders.    Switch OFF all lower test voltage circuit MCB’s.    Confirm main earth connected to the panel before starting the Test.    Isolate neutral wire from bus bar, which is connected to the circuit.    The insulation resistance test with 100A DC for phase to phase (L1‐L1)    Record the results on test format 

End of Test.    

 

Please check this statement . As the test is for contact resistance test .

ADNOC OFFSHORE (ZADCO) DEBOTTLENECKING & ENHANCEMENT OF ZIRKU OIL HANDLING FACILITY (ZR/S/1169) - E&I WORKS CONTRACT NO. CTCMS170810

SITE ACCEPTANCE TEST PROCEDURE FOR MODIFICATION SWGR AT ZR/S/1169

ZADCO Doc no. TBA

Cegelec P0058.01-DOC-032 Doc no. Elmec EM408-010 Doc no. Rev. A1 Page:

7.4

Equipment           Test instruments 

:   : 

9 of 19

DOL STARTER FUNCTIONAL TEST

  New cubicle Outgoing Feeder  380V, 3PH, 3 wire supply, digital multi meter and  Phase sequence meter 

  Procedure    1. Check the MPCB ratings.    2. Connect the 3phase, 380V to the Main LVAC board    3. Switch ON the Main Incomer.    4. Operate the DOL Feeders through ON & OFF push buttons.    5. Inject the set value current of the OLR using Primary Injection Test set, The OLR should  not trip at this value of current at any point of time.   

6. Similarly Inject 2 times, 3times current and check the OLR Characteristics. The OLR trip  time should match with the respective Characteristics.    7. Check the Voltage at output terminals.    8.  Check the Phase sequence at output Terminals    9. Connect a 3‐Phase motor to the output terminals and start the DOL feeder through  ONOFF push buttons.        End of Test.       

 

ADNOC OFFSHORE (ZADCO) DEBOTTLENECKING & ENHANCEMENT OF ZIRKU OIL HANDLING FACILITY (ZR/S/1169) - E&I WORKS CONTRACT NO. CTCMS170810

SITE ACCEPTANCE TEST PROCEDURE FOR MODIFICATION SWGR AT ZR/S/1169

ZADCO Doc no. TBA

Cegelec P0058.01-DOC-032 Doc no. Elmec EM408-010 Doc no. Rev. A1 Page:

7.5

Equipment           Test instruments 

10 of 19

ELR WITH CBCT FUNCTIONAL TEST

:  

New cubicle Outgoing Feeder 



380V, 3PH, 3 wire supply, digital multi meter and  Phase sequence meter 

  Procedure    1. Check the CBCT ratings.  2.

Primary Injection Test. 

3.

Connect primary injection kit across P1‐P2 of CBCT. 

4.

Make sure that the CBCT secondary wirings are connected to the ELR. 

5.

Inject primary current and measure the CBCT secondary current in the relay circuit. 

6.

Record the results as per the test report. 

End of Test. 

ADNOC OFFSHORE (ZADCO) DEBOTTLENECKING & ENHANCEMENT OF ZIRKU OIL HANDLING FACILITY (ZR/S/1169) - E&I WORKS CONTRACT NO. CTCMS170810

SITE ACCEPTANCE TEST PROCEDURE FOR MODIFICATION SWGR AT ZR/S/1169

ZADCO Doc no. TBA

Cegelec P0058.01-DOC-032 Doc no. Elmec EM408-010 Doc no. Rev. A1 Page:

7.6

11 of 19

PRE-COMMISSIONING PROCEDURE FOR NEW CUBICLE

 

1.

Obtain a work permit required prior to start the job. 

2.

Remove the main busbar side cover in new cubicle. 

3.

Connect the temporary power supply (3 Phase, 380V AC) to main busbar. 

4.

Connect  the  temporary  control  supply  (48V  DC  &  AC)  to  new  cubicle  as  per  the  schematic  drawings. 

5.

Connect the remote wiring to new cubicle as per the schematic drawings. 

6.

Connect a temporary grounding cable to new cubicle. 

7.

Switch on the power feeder MPCB, MCB, control relays, lamps. 

8.

Press the lamp test (SLT) PB to check all lamp is working. 

9.

Switch ON breaker to energize compartment heater. 

10. Inject the set value current of the ELR using Primary Injection set and tripping to be observed.  11. Check the indication lamp and Voltage at output terminals.  12. Check the Phase Sequence at output terminals  13. Switch off the Temporary power supply (3 Phase, 380V AC) and Temporary control supply (48V  DC)  14. Remove  the  temporary  remote  wiring,  grounding  wire,  power  cable  and  control  cable  from  new cubicle.  15. Bring the new cubicle near to existing side cubicle.   

 

ADNOC OFFSHORE (ZADCO) DEBOTTLENECKING & ENHANCEMENT OF ZIRKU OIL HANDLING FACILITY (ZR/S/1169) - E&I WORKS CONTRACT NO. CTCMS170810

SITE ACCEPTANCE TEST PROCEDURE FOR MODIFICATION SWGR AT ZR/S/1169

ZADCO Doc no. TBA

Page:

                   

8.0 TEST REPORTS  

Cegelec P0058.01-DOC-032 Doc no. Elmec EM408-010 Doc no. Rev. A1 12 of 19

    ABU DHABI POWER AND CONTROL SYSTEMS WORKS (ADPAC)

SIEMENS TECHNOLOGY PARTNER & MANUFACTURING UNIT OF ELECTRO MECHANICAL CO.LLC.

8.1. IR & HIGH VOLTAGE TEST REPORT Client

Project no.

Consultant

Location

Main contractor Panel ref.

Feeder

Date of test

Substation

LV Switchgear Details: Make

SIEMENS

Rated volts

380V AC

Type

SIVACON S8

Frequency

50Hz

Rated current

Short ckt.(A)

1. IR MEASUREMENT BEFORE HV TEST: 1000VDC. (MEAS. VALUE > 5MΩ) S. No.

Phase

1

R – Y+B+ E

2

Y – R+B+E

3

B – R+Y+E

Measured value

Remarks

2. HV TEST: VOLTAGE APPLIED 2500 VAC FOR 01 MINUTE. S. No.

Test combination

1

R – Y+B+ E

2

Y – R+B+E

3

B – R+Y+E

Leakage (mA)

Remarks

    ABU DHABI POWER AND CONTROL SYSTEMS WORKS (ADPAC)

SIEMENS TECHNOLOGY PARTNER & MANUFACTURING UNIT OF ELECTRO MECHANICAL CO.LLC. 3. IR MEASUREMENT AFTER HV TEST: 1000VDC. (MEAS. VALUE > 5MΩ) S. No.

Phase

1

R – Y+B+ E

2

Y – R+B+E

3

B – R+Y+E

Remarks:

Measured Value

Remarks

___________________________________________________________________ ___________________________________________________________________ ___________________________________________________________________

Test Equipment Details: Description

Company Name Signature Date

Make

ELMEC/ADPAC

Type

Sl. No.

CEGELEC

Calibration Date

Calibration Due Date

ADNOC

    ABU DHABI POWER AND CONTROL SYSTEMS WORKS (ADPAC)

SIEMENS TECHNOLOGY PARTNER & MANUFACTURING UNIT OF ELECTRO MECHANICAL CO.LLC.

8.2 TORQUE TIGHTNESS TEST REPORT Client Consultant Main contractor Panel ref. Date of test

Project no. Location Feeder Substation

LV Switchgear Details: Make SIEMENS Type SIVACON S8 Rated current

Rated volts Frequency Short ckt.(A)

380V AC 50Hz

Test Equipment Details: TORQUE TIGHTNESS CHECK: (Bolt size 10MM&12MM) Contact Resistance µΩ

Description

Torque Setting Nm

BB JOINT 1

70Nm

12MM BOLTS

BB JOINT 5

40Nm

10MM BOLTS

Remarks:

Remarks

___________________________________________________________________

Test Equipment Details: Description

Company Name Signature Date

Make

ELMEC/ADPAC

Type

Sl. No.

CEGELEC

Calibration Date

Calibration Due Date

ADNOC

    ABU DHABI POWER AND CONTROL SYSTEMS WORKS (ADPAC)

SIEMENS TECHNOLOGY PARTNER & MANUFACTURING UNIT OF ELECTRO MECHANICAL CO.LLC.

8.3 CONTACT RESISTANCE TEST REPORT Client Consultant Main contractor Panel ref. Date of test

Project no. Location Feeder Substation

LV Switchgear Details: Make SIEMENS Type SIVACON S8 Rated current

Rated volts Frequency Short ckt.(A)

Contact Resistance Test: Current Injected 100A DC Feeder Phase Phase No. of SI. No. Referen L1-L1 L2-L2 Joints ce (µΩ) (µΩ)

Remarks:

380V AC 50Hz

Tempr.: Phase L3-L3 (µΩ)

Phase N-N (µΩ)

Average µΩ per Joint

___________________________________________________________________

Test Equipment Details: Description

Company Name Signature Date

Make

ELMEC/ADPAC

Type

Sl. No.

CEGELEC

Calibration Date

Calibration Due Date

ADNOC

  ABU DHABI POWER AND CONTROL SYSTEMS WORKS (ADPAC)

SIEMENS TECHNOLOGY PARTNER & MANUFACTURING UNIT OF ELECTRO MECHANICAL CO.LLC.

8.4 DOL STARTER TEST REPORT Client

Project no.

Consultant

Location

Main contractor Panel ref.

Feeder

Date of test

Substation

LV Switchgear Details: Make

SIEMENS

Rated volts

380V AC

Type

SIVACON S8

Frequency

50Hz

Rated current

Short ckt.(A)

MCCB Details: Make

Current rating

Type

No. of Pole

Serial No

Short ckt.(A)

1. MANUAL OPERATION: 1.1

MPCB ON

:

1.2

MPCB OFF

:

1.3

OLR TRIP

:

1.4

MODULE WITHDRAWABLE

:

1.5

MODULE TEST FUNCTION

:

1.6

MODULE SERVICE FUNCTION

:

1.7

MODULE PADLOCK FUNCTION

:

  ABU DHABI POWER AND CONTROL SYSTEMS WORKS (ADPAC)

SIEMENS TECHNOLOGY PARTNER & MANUFACTURING UNIT OF ELECTRO MECHANICAL CO.LLC.

2. ELECTRICAL OPERATION: 2.1

LOCAL START FUNCTION

:

2.2

LOCAL STOP FUNCTION

:

2.3

O/L TRIP FUNCTION

:

2.4

LCS START FUNCTION

:

2.5

LCS STOP FUNCTION

:

2.6

START PERMISSIVE FROM DCS

:

2.7

TRIP COMMAND FROM LCP

:

2.8

RUNNING STATUS TO LCP

:

Remarks:

_______________________________________________________________________________ _______________________________________________________________________________ _______________________________________________________________________________

Test Equipment Details: Description

Company Name Signature Date

Make

ELMEC/ADPAC

Type

Sl. No

CEGELEC

Calibration Date

Calibration Due Date

ADNOC

  ABU DHABI POWER AND CONTROL SYSTEMS WORKS (ADPAC)

SIEMENS TECHNOLOGY PARTNER & MANUFACTURING UNIT OF ELECTRO MECHANICAL CO.LLC.

8.5. ELR TEST REPORT Client

Project no.

Consultant

Location

Main contractor Panel ref.

Feeder

Date of test

Substation

LV Switchgear Details: Make

SIEMENS

Rated volts

380V AC

Type

SIVACON S8

Frequency

50Hz

Rated current

Short ckt.(A)

Earth Leakage Relay Details: Make

Rated Current Input

Type

Frequency

Serial No

Aux Voltage

1. ELR Function Checks: Sl. No.

Set Current

Pick-Up Current Drop-Out Current Set Time

Actual Op. Time

Remarks

1 2 2. Accessories Check: A) Relay Trip Function B) Relay LED Function C) Relay Output Contacts D) Wiring Checks Remarks:

: : : :

___________________________________________________________________

Test Equipment Details: Description

Company Name Signature Date

Make

ELMEC/ADPAC

Type

Sl. No

CEGELEC

Calibration Date

Calibration Due Date

ADNOC