Develop Electric Car Project Work Breakdown Structure (wbs)

  • Uploaded by: Mohammed Shebin
  • 0
  • 0
  • January 2021
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Develop Electric Car Project Work Breakdown Structure (wbs) as PDF for free.

More details

  • Words: 422
  • Pages: 2
Loading documents preview...
Develop Electric Car Project Work Breakdown Structure (WBS)

WBS Dictionary

WBS Activity 1.0 Develop Electric Car 1.1 Initiating 1.1.1 Develop Scope and Plan 1.1.2 Engage Stakeholders 1.1.3 Raise Funds

1.2 Planning 1.2.1 Systems Design 1.2.2 Cost Estimate 1.2.3 Approvals 1.3 Construction 1.3.1 Purchase Materials 1.3.2 Rent Equipment 1.3.3 Engage Specialist 1.3.4 Complete Assembly 1.4 Testing 1.4.1 Component Testing 1.4.2 Track Testing

Overall Project

Prepare the Statement of Work, Project Cost Estimate, Schedule and other Baseline Documents Communication with Project Stakeholders including status reports, discussions on scope, etc. All activities associated with fund raising not covered in Engage Stakeholders. This includes meeting with prospective contributors, preparation of brochures, preparation of mail outs and related activities

Engineering and other activities to design the solar car structure and systems including specifying the equipment and materials. Preparation of related documents for approval. Preparation of a detailed cost estimate for the procurement and construction of the car based on the Systems Design. Activities related to gaining approval of the budget internally and the design with the Design Judge.

Cost of labor associated with purchasing material for the car and the cost of the permanent material in the car including all components and delivery. Cost of special equipment that must be rented to support construction. This may include welding machines, grinders, etc. The cost of a Power Systems specialist to review the design and perform specialty installation tasks for the Power Systems. Labor associated with the assembly of the car from the purchased materials.

Activities associated with individual system testing including any repairs or remediation. May included additional material that is damaged in testing. Activities associated with live testing of the completed car including any adjustments and remediation. Includes cost of the test track plus any additional material that is damaged in testing.

1.5 Competition 1.5.1 Travel 1.5.2 Event

1.6 Close Out 1.6.1 Disassemble Car 1.6.2 Reconcile Acounts and Finalize Payments

Cost of travel to and from the competition site including travel, hotels, meals and incidentals Costs associated with the event itself including entry fee, tents, water, snacks, etc. required to support the crew on the days before and during the competition including the trial runs.

The labor associated with disassembly of the car after the competition including any rental equipment. The recoveries due to salvage and sales of the components of the car are included. The labor costs of closing out the project including reconciling final accounts, reporting on final costs and closing out purchase orders and rental agreements. Preparing a final report for next year's team.

Related Documents


More Documents from "[email protected]"