SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES Job No. : 99012 Doc No. : INSP 99012 999
INSPECTION & TEST PLAN FOR ELECTRICAL
Page : 1/23
8700 0004
Rev. 4
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
INSPECTION & TEST PLAN FOR ELECTRICAL
4
07/01/01
ISSUE OF APPROVED FINAL DOCUMENT
M. G. KIM
S. Y. KIM
S. K. AN
3
21/12/00
ISSUE OF APPROVED FINAL DOCUMENT
M. G. KIM
S. Y. KIM
S. K. AN
2
20/12/99
APPROVED FOR CONSTRUCTION
M. G. KIM
S. Y. KIM
Y. H. KIM
1
17/11/99
APPROVED FOR CONSTRUCTION
M. G. KIM
S. Y. KIM
Y. H. KIM
0
30/09/99
ISSUED FOR APPROVAL
M. G. KIM
S. Y. KIM
Y. H. KIM
REV.
DATE
DESCRIPTION
BY
REVIEWED
APPROVED
TOTAL SOUTH PARS SOUTH PARS FIELD DEVELOPMENT (PHASE TWO & THREE)
INSPECTION & TEST PLAN FOR ELECTRICAL
DOCUMENT TITLE
INSP 99012 999 8700 0004
4
IAFD
NONE
DOCUMENT No.
REV
STATUS
SCALE
2 CLASS
1/23 PAGE
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES Job No. : 99012 Doc No. : INSP 99012 999
INSPECTION & TEST PLAN FOR ELECTRICAL
Page : 2/23
8700 0004
Rev. 4
TABULATION OF REVISED PAGES PAGE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44
Rev.1
Rev.2
Rev.3
X X X
X X X X X X X X X X X X X X X X X X X X X
X X
X X
X X X X X X X
X X
X
Rev.4
Rev.1 45 46 47 X 48 X 49 X 50 X 51 X 52 X 53 X 54 X 55 X 56 X 57 X 58 X 59 X 60 X 61 X 62 X 63 X 64 X 65 X 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES PAGE
Rev.2 X X X X X
Rev.3
Rev.4
INSPECTION & TEST PLAN FOR ELECTRICAL
Job No. : 99012 Doc No. : INSP 99012 999
Page : 3/23
8700 0004
Rev. 4
CONTENTS A. EARTHING AND LIGHTNING INSTALLATION ----------------------------------------
PAGE 4
B. CABLE LADDER INSTALLATION ---------------------------------------------------------
PAGE 6
C. CABLE INSTALLATION ----------------------------------------------------------------------
PAGE 8
D. EQUIPMENT INSTALLATION --------------------------------------------------------------
PAGE 11
E. LIGHTING AND SMALL POWER INSTALLATION -----------------------------------
PAGE 18
F. HEAT TRACING INSTALLATION ---------------------------------------------------------
PAGE 20
G. CATHODIC PROTECTION INSTALLATION -------------------------------------------
PAGE 22
H. TELECOMMUNICATION INSTALLATION ---------------------------------------------
PAGE 23
NOTE : COMPANY reserves the right to increase surveillance from SW to W and from W to H depending on results of site surveillance activities. COMPANY shall be notified of inspection points by CONTRACTOR at least 3 days in Advance of the Activity
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
INSPECTION & TEST PLAN FOR SITE
SUBCON
ELECTRICAL
ITP No.
:
Rev. No.
DESCRIPTION OF WORK : Earthing and Lightning Installation
NO.
DESCRIPTION OF INSPECTION / TEST
A
EARTHING AND LIGHTNING INSTALLATION
1
Material Verification(Receiving Inspection)
1.1
APPLICABLE SPEC. OR PROCEDURE
REPORTING FORMAT
RP 5561V 999 1630 029
QP 550 002
Verify the Material Type/Size/Quantity
1.2
Check the Damage
1.3
Review the Test Report
PP 99012 999 0001 550
INSP 99012 999 8700 0004
4
PAGE
4 OF 23
PARTICIPATION BY SUBCON
HDEC/ TPA
COMPANY
-
SW
SW
-
SW
SW
-
R
R
Earthing Installation
RP 5561V 999 1620 001
2.1
Cable Type/Size
Related DWG
W
SW
SW
2.2
Location & Routing
SP-COM-511
W
SW
SW
2.3
Bolts and Nuts Tighting
Related STD : IEC 364
W
SW
SW
W
SW
SW
2
2.4 Compression Type Connection LEGEND : R : Review SW : Spot Witness
CPX26
W : Witness H : Hold FORM NO. QP 545 002 2
REMARK
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
INSPECTION & TEST PLAN FOR SITE
SUBCON
ELECTRICAL
ITP No.
:
Rev. No.
DESCRIPTION OF WORK : Earthing and Lightning Installation
NO.
3
DESCRIPTION OF INSPECTION / TEST
APPLICABLE SPEC. OR PROCEDURE
INSP 99012 999 8700 0004
4
PAGE
5 OF 23
PARTICIPATION BY
REPORTING FORMAT
SUBCON
HDEC/ TPA
COMPANY
TPX26
W
SW
SW
H
W
W
REMARK
Test
3.1
Continuity Test
3.2
Earthing Resistance Test
LEGEND :
R : Review
RP 5561V 999 1620 001
SW : Spot Witness
W : Witness
H : Hold FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
INSPECTION & TEST PLAN FOR SITE
SUBCON
ELECTRICAL
ITP No.
:
Rev. No.
DESCRIPTION OF WORK :
NO.
DESCRIPTION OF INSPECTION / TEST
REPORTING FORMAT
QP 550 002
4
PAGE
Cable Ladder Installation APPLICABLE SPEC. OR PROCEDURE
INSP 99012 999 8700 0004
6 OF 23
PARTICIPATION BY SUBCON
HDEC/ TPA
COMPANY
-
SW
-
Check the Damage & Sharp Edge
-
SW
-
Review the Related Document
-
R
-
W
SW
SW
W
SW
W
W
SW
SW
B
CABLE LADDER INSTALLATION
1
Material Verification(Receiving Inspection)
PP 99012 999 0001 550
Verify the Material Type/Size/Quantity
Related DWG
Cable Ladder Installation
CPX30 Related DWG
Proper Type / Size Cable Ladder Location / Routing Cable Ladder Damage, Sharp Edge, Burr 1.1 1.2
RP 5561V 999 1630 007 RP 5561V 999 1620 001
REMARK
1.3 2 2.1 2.1 2.3
LEGEND :
R : Review
SW : Spot Witness
W : Witness
H : Hold FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
INSPECTION & TEST PLAN FOR SITE
SUBCON
ELECTRICAL
ITP No.
:
Rev. No.
DESCRIPTION OF WORK :
PAGE
Cable Ladder Installation NO.
DESCRIPTION OF INSPECTION / TEST
APPLICABLE SPEC. OR PROCEDURE
REPORTING FORMAT
INSP 99012 999 8700 0004
4 7 OF 23
PARTICIPATION BY SUBCON
HDEC/ TPA
COMPANY
REMARK
Support(Type/Size/Welding/Anchoring )
W
SW
W
Coating(touch up paint) on cut end & damage Portions
W
SW
W
Earthing / Bonding
W
SW
SW
Final Inspection
W
W
W
2.4 2.5 2.6 2.7 LEGEND :
R : Review
SW : Spot Witness
W : Witness
H : Hold FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
INSPECTION & TEST PLAN FOR SITE
SUBCON
ELECTRICAL
ITP No.
:
Rev. No.
DESCRIPTION OF WORK :
PAGE
Cable Installation
NO.
DESCRIPTION OF INSPECTION / TEST
APPLICABLE SPEC. OR PROCEDURE
REPORTING FORMAT
INSP 99012 999 8700 0004
4 8 OF 23
PARTICIPATION BY SUBCON
HDEC/ TPA
COMPANY
REMARK
C
CABLE INSTALLATION
1
Material Verification(Receiving Inspection)
1.1
Verify the Material Type/Size/Quantity
1.2
Check the Cable Damage
1.3
Review the Related Test Record
2
RP 5561V 999 1630 029
QP 550 002 -
SW
-
-
SW
SW
-
R
-
W
SW
SW
W
SW
SW
W
SW
SW
SW
SW
SW
PP 99012 999 0001 550
Cable Installation
2.1
Cable Type / Size / Routing
Related DWG
CPX08 (HV cable)
2.2
Cable Arrangement
RP 5561V 999 1630 007
CPX09(LV power/control)
2.3
Cable Damage
2.4 Cable Pulling Tension LEGEND : R : Review
SW : Spot Witness
RP 5561V 999 1630 008 W : Witness
H : Hold FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
INSPECTION & TEST PLAN FOR SITE
SUBCON
ELECTRICAL
ITP No.
:
Rev. No.
DESCRIPTION OF WORK :
PAGE
Cable Installation
NO.
DESCRIPTION OF INSPECTION / TEST
APPLICABLE SPEC. OR PROCEDURE
REPORTING FORMAT
INSP 99012 999 8700 0004
4 9 OF 23
PARTICIPATION BY SUBCON
HDEC/ TPA
COMPANY
REMARK
2.5
3
Cable Installation(In Cable Trenches)
RP 5561V 999 1630 029
- Cable Trenches Preparation
W
W
W
- Cable Segregation
W
SW
W
- Sand Bedding and Depth
W
SW
SW
W
SW
SW
W
SW
SW
Cable Termination CPX08 (HV cable)
3.1
Crimping Lug or Plug Size / Bolting
3.2
Cable Bending Radius
3.3
Gland , Fitting
W
SW
SW
3.4
ID Marker & Wire ID Marker
W
SW
SW
3.5
Cable Splicing( If required )
H
W
W
LEGEND :
R : Review
CPX09(LV power/control)
SW : Spot Witness
W : Witness
H : Hold FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
INSPECTION & TEST PLAN FOR SITE
SUBCON
ELECTRICAL
ITP No.
:
Rev. No.
DESCRIPTION OF WORK :
PAGE
Cable Installation
NO.
DESCRIPTION OF INSPECTION / TEST
APPLICABLE SPEC. OR PROCEDURE
REPORTING FORMAT
INSP 99012 999 8700 0004
4 10 OF 23
PARTICIPATION BY SUBCON
HDEC/ TPA
COMPANY
REMARK
4
Cable Test SP-COM-511
4.1
Above 1000V Cable
TPX08 RP 5561V 999 1630 029
- Continuity Test
4.2
H
W
W
- Insulation Resistance Test
H
H
W
- High-Voltage Test
H
H
H
- Continuity Test
W
W
W
- Insulation Resistance Test
H
W
W
Up to 1000 V Cable
LEGEND :
R : Review
TPX09
SW : Spot Witness
W : Witness
H : Hold FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
INSPECTION & TEST PLAN FOR SITE
SUBCON
ELECTRICAL
ITP No.
:
Rev. No.
DESCRIPTION OF WORK :
PAGE
Equipment Installation NO.
DESCRIPTION OF INSPECTION / TEST
APPLICABLE SPEC. OR PROCEDURE
REPORTING FORMAT
INSP 99012 999 8700 0004
4 11 OF 23
PARTICIPATION BY SUBCON
HDEC/ TPA
COMPANY
REMARK
D
EQUIPMENT INSTALLATION
1
Equipment Verification(Receiving Inspection)
RP 5561V 999 1630 007
QP 550 002
Verify the Equipment Type/Size/Quantity Check the Physical Damage
PP 99012 999 0001 550
Review the Related Document Generator Installation
Related DWG
Foundation/Level/Alignment
RP 5561V 999 1630 033
-
SW
-
-
SW
SW
-
R
-
W
W
-
H
W
-
W
W
-
CPX01
Anchor Bolt Setting Vendor Spec Physical Damage/Loose Parts 1.1 1.2 1.3 2 2.1 2.2 2.3 LEGEND :
R : Review
SW : Spot Witness
W : Witness
H : Hold
FORM NO. QP 545 002 2 SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
INSPECTION & TEST PLAN FOR SITE
SUBCON
ELECTRICAL
ITP No.
:
Rev. No.
DESCRIPTION OF WORK :
NO.
DESCRIPTION OF INSPECTION / TEST
REPORTING FORMAT
4
PAGE
Equipment Installation APPLICABLE SPEC. OR PROCEDURE
INSP 99012 999 8700 0004
12 OF 23
PARTICIPATION BY SUBCON
HDEC/ TPA
COMPANY
2.4
Earthing / Bonding
W
W
W
2.5
Cleaning
W
SW
SW
2.6
Electrical Test
H
W
W
H
W
W
W
SW
SW
H
W
W
W
W
W
3
SP-COM-511
TPX01
RP 5561V 999 1630 007
CPX02
Power Transformer Installation
3.1
Location/Foundation/Level/Alignment
3.2
Anchor Bolt Setting
3.3
Physical Damage/Loose Parts
RP 5561V 999 1630 021 Vendor Spec
3.4
Bushing joint / Seal
LEGEND :
R : Review
SW : Spot Witness
W : Witness
H : Hold
REMARK
FORM NO. QP 545 002 2 SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
INSPECTION & TEST PLAN FOR SITE
SUBCON
ELECTRICAL
ITP No.
:
Rev. No.
DESCRIPTION OF WORK :
PAGE
Equipment Installation
NO.
DESCRIPTION OF INSPECTION / TEST
APPLICABLE SPEC. OR PROCEDURE
REPORTING FORMAT
INSP 99012 999 8700 0004
4 13 OF 23
PARTICIPATION BY SUBCON
HDEC/ TPA
COMPANY
3.5
Oil Level / No Leak
W
W
W
3.6
Tap change mechanism
W
SW
W
3.7
Earthing / Bonding
W
SW
W
3.8
Electrical Test
SP-COM-511
- HV Transformer
Vendor Spec
TPX02
H
H
H
TPX03
W
W
W
- LV Transformer
LEGEND :
R : Review
SW : Spot Witness
W : Witness
REMARK
H : Hold FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
INSPECTION & TEST PLAN FOR SITE
SUBCON
ELECTRICAL
ITP No.
:
Rev. No.
DESCRIPTION OF WORK :
NO.
4.
DESCRIPTION OF INSPECTION / TEST
Bus Duct Installation
REPORTING FORMAT
4
PAGE
Equipment Installation APPLICABLE SPEC. OR PROCEDURE
INSP 99012 999 8700 0004
14 OF 23
PARTICIPATION BY SUBCON
HDEC/ TPA
COMPANY
W
SW
W
W
SW
SW
REMARK
Related DWG CPX07
4.1
Bus Duct Location / Routing
RP 5561V 999 1630 007
4.2
Support Type/Foundation/Welding/Anchoring
4.3
Bus Duct Level / Alignment
W
SW
SW
4.4
Bus Bar Connection(Bolt tighting)
H
W
W
4.5
Earthing / Bonding
W
SW
W
4.6
Cleaning
W
SW
SW
4.7
Electrical Test
H
W
W
Vendor Spec
LEGEND :
R : Review
SP-COM-511
SW : Spot Witness
W : Witness
TPX07
H : Hold FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
INSPECTION & TEST PLAN FOR SITE
SUBCON
ELECTRICAL
ITP No.
:
Rev. No.
DESCRIPTION OF WORK :
REPORTING FORMAT
HV/LV SWITCHGEAR/MCC Installation
Related DWG
CPX04(HV)
5.1
Location / Level / Foundation
RP 5561V 999 1630 007
CPX05(LV)
5.2
Support /Welding/Anchoring/Bolting
5.3
Alignment of Total Board
5.4
Bus Bar Connection
5.5
Physical Damage
5.6
NO.
DESCRIPTION OF INSPECTION / TEST
4
PAGE
Equipment Installation APPLICABLE SPEC. OR PROCEDURE
INSP 99012 999 8700 0004
15 OF 23
PARTICIPATION BY SUBCON
HDEC/ TPA
COMPANY
W
SW
W
W
SW
SW
H
SW
SW
H
W
SW
W
SW
SW
Earthing / Bonding
H
SW
W
5.7
Mechanical operation & CT’s data
W
W
W
5.8
Cleaning
TPX04(HV)
W
SW
SW
TPX05(LV) H : Hold
H
H
H
5
RP 5561V 999 1630 022 RP 5561V 999 1630 023
REMARK
Vendor Spec
5.9 Electrical Test LEGEND : R : Review
SW : Spot Witness
SP-COM-511 W : Witness
FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
INSPECTION & TEST PLAN FOR SITE
SUBCON
ELECTRICAL
ITP No.
:
Rev. No.
DESCRIPTION OF WORK :
NO.
6
DESCRIPTION OF INSPECTION / TEST
Battery/Charger/Inverter Installation
Related DWG
6.1
Location / Level / Foundation
RP 5561V 999 1630 007
6.2
Support /Welding/Anchoring/Bolting
6.3
Number of Cells Inter-connected
6.4
Polarity of Interconnections between Cells
6.5
Bolts, Nuts Washer Assembly Tighting
6.6
Physical Damage
REPORTING FORMAT
4
PAGE
Equipment Installation APPLICABLE SPEC. OR PROCEDURE
INSP 99012 999 8700 0004
16 OF 23
PARTICIPATION BY SUBCON
HDEC/ TPA
COMPANY
W
SW
W
W
SW
SW
W
W
W
W
W
W
W
SW
SW
W
SW
SW
REMARK
CPX16/17
RP 5561V 999 1630 025 RP 5561V 999 1630 026 Vendor Spec SP-COM-511
6.7
Earthing / Bonding
W
SW
W
6.8
Cleaning
W
SW
SW
H
W
W
6.9 Electrical Test LEGEND : R : Review
SW : Spot Witness
W : Witness
TPX16/17 H : Hold
FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
INSPECTION & TEST PLAN FOR SITE
SUBCON
ELECTRICAL
ITP No.
:
Rev. No.
DESCRIPTION OF WORK :
NO.
7
DESCRIPTION OF INSPECTION / TEST
Miscellaneous Equipment Installation (LV DB, Control Station, NER, Control Panel, etc)
Related DWG
REPORTING FORMAT
4
PAGE
Equipment Installation APPLICABLE SPEC. OR PROCEDURE
INSP 99012 999 8700 0004
17 OF 23
PARTICIPATION BY SUBCON
HDEC/ TPA
COMPANY
W
SW
SW
W
SW
SW
W
SW
SW
REMARK
CPX06/15/21/ 23/24/32
RP 5561V 999 1630 007
7.1
Name Plate
7.2
Location / Level / Foundation
7.3
Support /Welding/Anchoring/Bolting
7.4
Bolts, Nuts Washer Assembly Tighting
W
SW
SW
7.5
MCB’s rating
W
SW
SW
7.6
Physical Damage
W
SW
SW
7.7
Electrical Test
H
W
W
RP 5561V 999 1630 008 Vendor Spec
LEGEND :
R : Review
SP-COM-511 SW : Spot Witness
W : Witness
H : Hold FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
INSPECTION & TEST PLAN FOR SITE
SUBCON
ELECTRICAL
ITP No.
:
Rev. No.
DESCRIPTION OF WORK : Lighting and Small Power Installation
NO.
DESCRIPTION OF INSPECTION / TEST
E
LIGHTING AND SMALL POWER INSTALLATION
1
Material Verification(Receiving Inspection)
APPLICABLE SPEC. OR PROCEDURE
REPORTING FORMAT
RP 5561V 999 1640 001
QP 550 002
INSP 99012 999 8700 0004
4
PAGE
18 OF 23
PARTICIPATION BY SUBCON
HDEC/ TPA
COMPANY
1.1
Verify the Material Type/Size/Quantity
-
SW
SW
1.2
Check the Physical Damage
-
SW
SW
1.3
Review the Related Document
-
R
-
W
W
W
W
SW
SW
2
Lighting and Small Power Installation
Related DWG
2.1
Lighting Distribution Board Installation
RP 5561V 999 1640 001
CPX 15
2.2
Lighting Fixture / Power Socket / Welding Socket Installation - Raceway installation
RP 5561V 999 1630 029
CPX18/19/25
LEGEND :
R : Review
SW : Spot Witness
W : Witness
REMARK
H : Hold FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
INSPECTION & TEST PLAN FOR SITE
SUBCON
ELECTRICAL
ITP No.
:
Rev. No.
DESCRIPTION OF WORK : Lighting and Small Power Installation
NO.
DESCRIPTION OF INSPECTION / TEST
- Cable / Wire installation
APPLICABLE SPEC. OR PROCEDURE
REPORTING FORMAT
RP 5561V 999 1640 001
- Lighting Fixture / Power Socket / Welding Socket Installation - Final inspection
INSP 99012 999 8700 0004
4
PAGE
19 OF 23
PARTICIPATION BY SUBCON
HDEC/ TPA
COMPANY
W
SW
SW
W
SW
SW
W
W
W
H
W
W
H
W
W
Test SP-COM-511 Continuity Test Insulation Resistance Test
TPX18/19/25 RP 5561V 999 1630 029 RP 5561V 999 1640 001
3
REMARK
3.1 3.2
LEGEND :
R : Review
SW : Spot Witness
W : Witness
H : Hold FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
INSPECTION & TEST PLAN FOR SITE
SUBCON
ELECTRICAL
ITP No.
:
Rev. No.
DESCRIPTION OF WORK :
PAGE
Heat Tracing Installation NO.
DESCRIPTION OF INSPECTION / TEST
APPLICABLE SPEC. OR PROCEDURE
REPORTING FORMAT
INSP 99012 999 8700 0004
4 20 OF 23
PARTICIPATION BY SUBCON
HDEC/ TPA
COMPANY
REMARK
F
HEAT TRACING INSTALLATION
1
Material Verification(Receiving Inspection)
1.1
Verify the Material Type/Size/Quantity
1.2 1.3
RP 5561V 999 1630 007
QP 550 002 -
SW
-
Check the Physical Damage
-
SW
SW
Review the Related Document
-
R
-
W
SW
SW
Vendor spec
2 2.1
Heat Tracing Installation
RP 5561V 999 1630 007
Heating Cable Installation - Cable Type / Size / Route - Cable Tie or Tape Binding
CPX22
Related DWG Vendor spec
LEGEND :
R : Review
SW : Spot Witness
W : Witness
H : Hold FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
INSPECTION & TEST PLAN FOR SITE
SUBCON
ELECTRICAL
ITP No.
:
Rev. No.
DESCRIPTION OF WORK :
PAGE
Heat Tracing Installation NO.
DESCRIPTION OF INSPECTION / TEST
APPLICABLE SPEC. OR PROCEDURE
REPORTING FORMAT
INSP 99012 999 8700 0004
4 21 OF 23
PARTICIPATION BY SUBCON
HDEC/ TPA
COMPANY
REMARK
Accessory(Junction Box, Thermostats, Sensor) Related DWG
W
SW
SW
H
W
W
H
W
W
Vendor spec Test SP-COM-511 Insulation Resistance Test ( Before insulation )
TPX22 RP 5561V 999 1630 007
Insulation Resistance Test ( After insulation) 3.1 3.2
LEGEND :
R : Review
SW : Spot Witness
W : Witness
H : Hold FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
INSPECTION & TEST PLAN FOR SITE
SUBCON
ELECTRICAL
ITP No.
:
Rev. No.
DESCRIPTION OF WORK :
PAGE
Cathodic Protection Installation NO.
DESCRIPTION OF INSPECTION / TEST
APPLICABLE SPEC. OR PROCEDURE
REPORTING FORMAT
INSP 99012 999 8700 0004
4 22 OF 23
PARTICIPATION BY SUBCON
HDEC/ TPA
COMPANY
REMARK
G
CATHODIC PROTECTION INSTALLATION
1
Material Verification(Receiving Inspection)
1.1
Verify the Material Type/Size/Quantity
1.2
Check the Physical Damage
1.3
Review the Related Document
2
Cathodic Protection Installation
RP 5561V 999 1630 017, 1300 082
QP 550 002 -
SW
SW
-
SW
SW
-
R
-
W
SW
W
W
W
W
W
SW
W
W
W
W
Vendor spec
CPX33 2.1
Anode / Anode Cable Installation
RP 5561V 999 1630 007,1300 082
2.2
Cable connection/bonding
2.3
Test Box, Reference Electrode, etc
Related DWG Vendor spec 3
Electrical test - Loop resistance for anode cable - Potential test for reference cell LEGEND : R : Review SW : Spot Witness
SP-COM-511
TPX33
W : Witness
H : Hold FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
INSPECTION & TEST PLAN FOR SITE
SUBCON
ELECTRICAL
ITP No.
:
Rev. No.
DESCRIPTION OF WORK :
PAGE
Telecommunication Installation NO.
DESCRIPTION OF INSPECTION / TEST
APPLICABLE SPEC. OR PROCEDURE
REPORTING FORMAT
INSP 99012 999 8700 0004
4 23 OF 23
PARTICIPATION BY SUBCON
HDEC/ TPA
COMPANY
REMARK
H
TELECOMMUNICATION INSTALLATION Above item is separated from ITP for electrical. ITP for telecommunication will be issued later.
LEGEND :
R : Review
SW : Spot Witness
W : Witness
H : Hold FORM NO. QP 545 002 2