Loading documents preview...
DOCUM EN T R EVI EW AN D COVER SHEET Construction Contractor:
Com pany:
Engineering Contractor:
Engineering and Technical Services:
R eview :
PROJECT
Gasprom Neftehim Salavat Acrylic Acid / Acrylates Plant (RSAE) Project Bashkortostan, Russian Federation
CONTRACT NO
88621 - December, 2012
DOCUMENT TITLE
LV Bus Duct
DOCUMENT NUMBER
RSAE
DOCUMENT DESCRIPTION
Inspection and Test Plan (ITP)
- ITP
-
QA
- EL
- 012
REV. A1
Status
Status Code
⃝
1
APPROVED WITHOUT COMMENT
⃝
2
REVISE AND RESUBMIT. WORK MAY INCORPORATON OF CHANGES INDICATED.
⃝
3
REJECTED. TO BE REVISED B: RESUBMITTED. WORK MAY NOT PROCEED
⃝
4
INFORMATION ONLY. REVIEW NOT REQUIRED. WORK MAY PROCEED
⃝
5
CANCELLED/SUPERSEDED
Revieved Engineer:
Code Description
NAME
SIGN
PROCEED
SUBJECT
TO
DATE
Remarks or Comments:
Docum ent N um ber:
R evision:
RSAE
ITP
QA
EL
012
PROJECT CODE
DOCUMENT TYPE
DEPARTMENT CODE
DICIPLINE CODE
SEQUENCE NUMBER
A1
REVISION SHEET Revision Description of changes A1
Page
First Issued For approval
Docum ent N um ber:
R evision:
RSAE
ITP
QA
EL
012
PROJECT CODE
DOCUMENT TYPE
DEPARTMENT CODE
DICIPLINE CODE
SEQUENCE NUMBER
A1
Gasprom Neftehim Salavat Acrylic Acid / Acrylates Plant (RSAE) Project
Inspection and Test Plan LV BUS DUCT Issue Date:
No
27/08/2014
RSAE-ITP-QA-EL-012
Doc. Number:
DESCRIPTION OF ACTIVITY
CONTROL DOCUMENT
Revision:
ACCEPTANCE CRITERIA
A1
VERIFICATION DOCUMENT
Page:
1 of 1
INVOLVEMENTS RC MHI Owner
1
Installation Check 1- Inspect panel assembly for alignment, level, tightness of bolts
1.1
1.2
1.3
2- Inspect bus duct connection
(Torque check and marking) 3- Check frame earthing 4- Inspect termination 5- Check bus duct supports Check phase rotation
connection
3935 E323-00100 LV MCC and Distribution Transformers Drawings
3935 E323-00100 LV MCC and Distribution Transformers Drawings
Correct Installation
Attachment 1- RSAE-FRM-216 INSPECTION CHECK LIST LV BUS DUCT
Owner
W
W
S
W
W
S
W H
W H
S
RSAE-FRM-216 Correct phase rotation
connection
500 VDC, 1 Min >50 Mohm >10MOhm
Insulation resistance measurement
RSAE-FRM-216
RSAE-FRM-216
DWG: 1. LV Busduct : 3935 E323-00100 2. Transformer : 3935 E322-00600 3. LV SWGR/MCC : 3935 E323-00200 Instruction manual : 1. LV Busduct : 3935 E423-00100 2. Transformer : 3935 E422-00600 3. LV SWGR/MCC : 3935 E423-00200 & 201
LEGEND RC: Renaissance Construction, MHI: Mitsubishi Heavy Industries, GNS: Gasprom Neftekhim Salavat, W: Witness, R: Review, H: Mandatory Hold Point, S: Surveillance (Random Check), I: Inspection
0AO
Acrylic Acid Plant SALAVAT, BASHKORTOSTAN, RUSSIAN FEDERATION
INSPECTION CHECK LIST INSPECTION CHECK LIST LV BUS DUCT Date:
Tag. Tag
No.
No. 1 2 3 4 5 6 7 8
Check List Ref. No.:
Location:
DWG No.
Check bus duck alighment and levelling Check bolt torques Check busbar connections Check bus bar terminations to Transformer and LV MCCs LV Check earthing Check bus duck supports Check Insulation resistance according to below table Check Phase Rotation
by Owner
RFI Ref. No.:
Terminal block: 25Nm Others: M6 8Nm, M8 20Nm, M10 40Nm, M20 80Nm
Item Checked
RSAE-FRM-216
Checked by RC
Checked by MHI
Checked by GNS
Remarks
SWGR/MCC
duct
connection Insulation Resistance Test
Test Voltage:
V DC 500VDC
Minimum resistance:
.MΩ
>10MOhm
Phase - N Result Phase-Phase
Phase-PE
Phase-Grand
MΩ
MΩ
MΩ
Insulation Continiouty Resistance
Phase Rotation
[Ok or NG] [Ok or NG] [Ok or NG]
connection
Phase - Phase (L1-L2, L2-L3, L3-L1)
Name
Testing Instruments List [The calibration certificate of the testing instruments shall be attached] Manufacturer Equipment serial No
RONESANS – QC ENGINEER
MHI – QC ENGINEER
OWNER ENGINEER
Name/Surname:
Name/Surname:
Name/Surname:
Signature:
Signature:
Signature:
Date:
Date:
Date:
RSAE-FRM-216